← Back
Elevator apt, miscellaneous
Beach Channel Apartments
13-12 BEACH CHANNEL DRIVE · BIN 4624475
💬 Discuss this project
2023Year Built
8Stories
D9Building Class
R6Zoning
130,548 sfGross Floor Area
60Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Elevator apt, miscellaneous · Owner of record: BCD HOUSING DEVELOPMENT FUND CORPORATION · 32,171 sf lot · 4.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof2p · 2 filings · 8 docs
Floor 82p · 2 filings · 8 docs
Floor 72p · 2 filings · 8 docs
Floor 61p · 1 filing · 2 docs
Floor 51p · 1 filing · 2 docs
Floor 41p · 1 filing · 2 docs
Floor 31p · 1 filing · 2 docs
Floor 2121p · 2 filings · 20 docs
Floor 1131p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEERGROW DEVELOPERS2107/08/2026
CAMBER PROPERTY GROUP4107/08/2026
PLATINUM SERVICES NY2004/09/2026
VIK XS SERVICES704/09/2026
SKYLINE SCAFFOLDING GROUP604/09/2026
BCD HOUSING DEVELOPMENT FUND COR203/22/2026
BRC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/25/2022$3.9M—— → —— not available
11/29/2018$1.2M—MIB REAL ESTATE HOLDINGS, LLC → 1312 BCD LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES2803/21/2026
PLATINUM SERVICES NY803/21/2026
AO CONSULTING AND DRAFTING403/21/2026
EXPEDITE DEM203/21/2026
A1 EXPEDITING SERVICE603/21/2026
KD DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FIFTH AVENUE BUILDERS LLCGeneral Contractor1407/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor804/09/2026
JOSEPH SORTINOElectrical603/21/2026
FIVE BORO ASSOCIATES INCFire Protection607/08/2026
TOP SHELF ELECTRIC CORP 003742General Contractor603/22/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor404/09/2026
METFLOW FIRE CONTROL LLCFire Protection307/08/2026
PROTO P & H SERVICES CORPPlumbing307/08/2026
G.M.A. PLUMBING & HEATINGPlumbing207/08/2026
VIK XS SERVICES INCGeneral Contractor204/09/2026
URBAN ARCHITECTURAL INTITIATIVESGeneral Contractor103/22/2026
UNITED INDUSTRIES & CONSTGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.3942504/07/2026
GEODESIGN, INC., P.C.627712/30/2024
JOEL PHAGOO ,PE, PLLC2416109/22/2022
Building Lifecycle
All (248)Filed (40)Permit Issued (43)Signed Off (19)Violation (17)Inspection (20)Objection (79)Special Inspection (30)
04/29/2026
Signed off — New Building
Foundation work in conjunction with New Building
Q00540608-I1
04/07/2026
Filed — New Building
Foundation work in conjunction with New Building
Q00540608-B3
04/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
04/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
04/07/2026
Special inspection requirement — Fenestration areas
Paul Raymond
04/07/2026
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
04/07/2026
Special inspection requirement — Air barrier continuity plan testing
Paul Raymond
04/07/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
04/07/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Paul Raymond
04/07/2026
Special inspection requirement — Fenestration air leakage
Paul Raymond
04/07/2026
Special inspection requirement — Vestibules
Paul Raymond
04/07/2026
Special inspection requirement — Insulation placement and R values
Paul Raymond
04/07/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Paul Raymond
04/07/2026
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
04/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
12/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/09/2025
Objection resolved — Addressed
07/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/02/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
05/16/2025
Signed off — New Building
Foundation work in conjunction with New Building
Q00540608-Z5
05/15/2025
Objection raised — Admin
05/07/2025
Filed — New Building
Foundation work in conjunction with New Building
Q00540608-A7
04/16/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Paul Raymond
04/16/2025
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
04/16/2025
Special inspection requirement — Insulation placement and R values
Paul Raymond
04/16/2025
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
04/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
04/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
04/16/2025
Special inspection requirement — Air barrier continuity plan testing
Paul Raymond
04/16/2025
Special inspection requirement — Fenestration areas
Paul Raymond
04/16/2025
Special inspection requirement — Vestibules
Paul Raymond
04/16/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Paul Raymond
04/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
04/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
04/16/2025
Special inspection requirement — Fenestration air leakage
Paul Raymond
02/21/2025
Objection raised — Scope
02/21/2025
Objection raised — Fire_Protection
02/21/2025
Objection raised — Scope
02/21/2025
Objection raised — Scope
02/21/2025
Objection raised — Inspections
02/14/2025
Signed off — Alteration
Sprinkler / Standpipe work in conjunction with New Building Q00540608-I1
Q00651797-I1
02/12/2025
Objection raised — Other
02/07/2025
Filed — No Work
Q01146630-I1
01/30/2025
Filed — New Building
Foundation work in conjunction with New Building
Q00540608-A6
01/30/2025
Signed off — Alteration
Q00651819-I1
01/28/2025
Signed off — New Building
Foundation work in conjunction with New Building
Q00540608-S9
12/30/2024
Filed — New Building
Foundation work in conjunction with New Building
Q00540608-A4
12/30/2024
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
12/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
12/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
12/30/2024
Special inspection requirement — Maintenance information
Paul Raymond
12/30/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
11/27/2024
Signed off — Alteration
Q00702589-I1
11/20/2024
Signed off — New Building
Foundation work in conjunction with New Building
Q00540608-S8
10/16/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/09/2024
Filed — New Building
Foundation work in conjunction with New Building
Q00540608-A3
Latest 60 of 248 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPROTO P & H SERVICES CORP09/10/2024
DOB NOWCurb CutSigned-offFIFTH AVENUE BUILDERS LLC06/26/2024
DOB NOWCurb CutSigned-offFIFTH AVENUE BUILDERS LLC06/26/2024
DOB NOWConstruction FenceSigned-offPLATINUM SERVICES NY LLC06/13/2024
DOB NOWConstruction FenceSigned-offPLATINUM SERVICES NY LLC06/11/2024
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ06/06/2024
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ05/15/2024
DOB NOWProtection and Mechanical MethodsSigned-offPLATINUM SERVICES NY LLC03/29/2024
DOB NOWSprinklersSigned-offFIVE BORO ASSOCIATES INC01/08/2024
DOB NOWStandpipeSigned-offFIVE BORO ASSOCIATES INC01/04/2024
DOB NOWStandpipeSigned-offFIVE BORO ASSOCIATES INC01/04/2024
DOB NOWGeneral ConstructionPermit IssuedFIFTH AVENUE BUILDERS LLC12/06/2023
DOB NOWFoundationSigned-offFIFTH AVENUE BUILDERS LLC12/05/2023
DOB NOWMechanical SystemsSigned-offFIFTH AVENUE BUILDERS LLC12/05/2023
DOB NOWStructuralSigned-offFIFTH AVENUE BUILDERS LLC12/05/2023
DOB NOWPlumbingSigned-offPROTO P & H SERVICES CORP11/06/2023
DOB NOWGeneral ConstructionPermit IssuedFIFTH AVENUE BUILDERS LLC08/08/2023
DOB NOWMechanical SystemsSigned-offFIFTH AVENUE BUILDERS LLC08/04/2023
DOB NOWStructuralSigned-offFIFTH AVENUE BUILDERS LLC08/02/2023
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP06/28/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC06/23/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC06/23/2023
DOB NOWProtection and Mechanical MethodsSigned-offVIK XS SERVICES INC05/16/2023
DOB NOWPlumbingSigned-offPROTO P & H SERVICES CORP05/10/2023
DOB NOWSupported ScaffoldSigned-offVIK XS SERVICES INC05/10/2023
DOB NOWStandpipeSigned-offFIVE BORO ASSOCIATES INC05/04/2023
DOB NOWSprinklersSigned-offFIVE BORO ASSOCIATES INC05/04/2023
DOB NOWSprinklersSigned-offFIVE BORO ASSOCIATES INC05/04/2023
DOB NOWProtection and Mechanical MethodsSigned-offPLATINUM SERVICES NY LLC04/07/2023
DOB NOWStandpipeSigned-offMETFLOW FIRE CONTROL LLC03/23/2023
DOB NOWStandpipeSigned-offMETFLOW FIRE CONTROL LLC03/23/2023
DOB NOWPlumbingSigned-offG.M.A. PLUMBING & HEATING03/09/2023
DOB NOWGeneral ConstructionPermit IssuedFIFTH AVENUE BUILDERS LLC12/28/2022
DOB NOWStructuralSigned-offFIFTH AVENUE BUILDERS LLC12/15/2022
DOB NOWEarth WorkSigned-offFIFTH AVENUE BUILDERS LLC12/13/2022
DOB NOWGeneral ConstructionPermit IssuedFIFTH AVENUE BUILDERS LLC12/01/2022
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP09/23/2022
DOB NOWSupport of ExcavationSigned-offFIFTH AVENUE BUILDERS LLC09/22/2022
DOB NOWPlumbingSigned-offG.M.A. PLUMBING & HEATING09/21/2022
DOB NOWStandpipeSigned-offMETFLOW FIRE CONTROL LLC08/15/2022
+ 7 more permits on file
1 project · most recent 04/07/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
04/07/2026Signed-offFIFTH AVENUE BUILDERS LLCAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems
Cooling
Lg ARUN024GSS4 2 tons · Vrf Outdoor ×8
ARUM060GSS4 5 tons · Vrf Outdoor ×6
ARUM144BTE5 12 tons · Vrf Outdoor ×6
ARUM096BTE5 8 tons · Vrf Outdoor ×4
ARUM121BTE5 10 tons · Vrf Outdoor ×4
ARUN048GSS4 4 tons · Vrf Outdoor ×4
ARUM048GSS4 4 tons · Vrf Outdoor ×2
ARUM048GSS5 4 tons · Vrf Outdoor ×2
ARUM192BTE5 16 tons · Vrf Outdoor ×2
Renewaire HE1XRT 14,964 BTU · Erv ×4
HE4XRT 58,687 BTU · Erv ×4
EV450RT 10,255 BTU · Erv ×2
HE2XRT 26,747 BTU · Erv ×2
Loren Cook 0903206 AIH 90AI-3206-15 14,666 CFM · Exhaust Fan ×2
225 CPV 225CPV 5,600 CFM · Exhaust Fan ×2
Heat / Cool
Econ-Air EA2-D.250-20D 2,395 CFM · Makeup Air ×2
1 project · most recent 04/07/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/07/2026Signed-offPROTO P & H SERVICES CORPGas, Storm, Water/Sanitary
5 projects · most recent 06/26/2025
General Wiring
FiledStatusContractorScope
06/26/2025CompleteTOP SHELF ELECTRIC CORPGeneral Wiring
04/19/2023CompleteILLUMINOUS ELECTRIC CORP.—
11/01/2022CompleteTUXEDO ELEC'L CONTR'G INC—
07/14/2022CompleteTOP SHELF ELECTRIC CORP2 meters, 2 new_meters
03/07/2022CompleteILLUMINOUS ELECTRIC CORP.General Wiring
1 project · most recent 04/07/2026
Steel Concrete Masonry
FiledStatusContractorScope
04/07/2026Signed-offPROTO P & H SERVICES CORPSteel, Concrete, Masonry
1 project · most recent 04/07/2026
Scaffold
FiledStatusContractorScope
04/07/2026Signed-offPROTO P & H SERVICES CORPScaffold
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
12/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/30/2024Pass-Final SD - Fire PumpPassView ↗
10/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/14/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
07/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/09/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
06/27/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/12/2024Pass-Final Boiler Equipment InspectionPassView ↗
04/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/29/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/15/2024Pass-Final SD - Fire PumpPassView ↗
03/11/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/11/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/05/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
12/06/2022Pass-Final PL - UndergroundPassView ↗
11/15/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/27/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/27/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
04/07/2026Fenestration air leakagePaul Raymondenergy_progress
04/07/2026Air barrier continuity plan testingPaul Raymondenergy_progress
04/07/2026Air barrier - visual inspectionPaul Raymondenergy_progress
04/07/2026Fire-Resistance Rated ConstructionPaul Raymondprogress
04/07/2026Energy Code Compliance InspectionsPaul Raymondprogress
04/07/2026Mastic and Intumescent Fire-resistant CoatingsPaul Raymondspecial
04/07/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
04/07/2026Exterior Insulation and Finish Systems (EIFS)Paul Raymondspecial
04/07/2026Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
04/07/2026VestibulesPaul Raymondenergy_progress
04/07/2026Protection of exposed foundation insulationPaul Raymondenergy_progress
04/07/2026Insulation placement and R valuesPaul Raymondenergy_progress
04/07/2026Fenestration areasPaul Raymondenergy_progress
04/16/2025Insulation placement and R valuesPaul Raymondenergy_progress
04/16/2025Fenestration air leakagePaul Raymondenergy_progress
04/16/2025VestibulesPaul Raymondenergy_progress
04/16/2025Air barrier continuity plan testingPaul Raymondenergy_progress
04/16/2025Exterior Insulation and Finish Systems (EIFS)Paul Raymondspecial
04/16/2025Fire-Resistant Penetrations and JointsPaul Raymondspecial
04/16/2025Mastic and Intumescent Fire-resistant CoatingsPaul Raymondspecial
04/16/2025Energy Code Compliance InspectionsPaul Raymondprogress
04/16/2025Fire-Resistance Rated ConstructionPaul Raymondprogress
04/16/2025Protection of exposed foundation insulationPaul Raymondenergy_progress
04/16/2025Air barrier - visual inspectionPaul Raymondenergy_progress
04/16/2025Fenestration areasPaul Raymondenergy_progress
Latest 25 of 150.
▾Documents — 379 on file (BIS + DOB NOW)
▸Plans & Drawings40
▸DOB NOWPlans/Sketch39
08/26/2026Q00651819-I1Request digital key ↗
08/26/2026Q00702589-I1Request digital key ↗
08/25/2026Q00668430-I1Request digital key ↗
Showing 3 of 39 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION12
05/21/2025400550845Open ↗
05/20/2025440708183Open ↗
05/16/2025400550845Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWHPD - Permit Notice2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISWORK PERMIT APPLICATION1
01/05/2017421409309Open ↗
▸Zoning, Tax Lot & Property Records21
▸DOB NOWZoning Exhibit form (1-5)8
08/23/2026Q00540608-B3Open ↗
08/23/2026Q00540608-A6Open ↗
08/23/2026Q00540608-A3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISZONING EXHIBIT II: CERTIFICATION1
03/22/2024421134301Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
03/22/2024421134301Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/22/2024421134301Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
03/22/2024421134301Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications206
▸DOB NOWProgress Inspector Seal & Signature108
09/27/2026Q00540608-S2Open ↗
09/23/2026Q00540608-A3Open ↗
09/23/2026Q00540608-A3Open ↗
Showing 3 of 108 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature55
09/27/2026Q00540608-S2Open ↗
09/27/2026Q00540608-S2Open ↗
09/27/2026Q00540608-S2Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature40
08/26/2026Q00651819-I1Open ↗
08/26/2026Q00702589-I1Open ↗
08/25/2026Q00668430-I1Open ↗
Showing 3 of 40 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/05/2017421409309Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/05/2017421409309Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/05/2017421409309Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)7
08/23/2026Q00540608-A6Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist8
08/23/2026Q00540608-A3Open ↗
08/23/2026Q00540608-B3Open ↗
08/23/2026Q00540608-A6Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos32
▸DOB NOWOER: Notice to Proceed21
08/23/2026Q00540608-S9Open ↗
08/23/2026Q00540608-A6Open ↗
Showing 2 of 21 on file for this type
▸DOB NOWOER: Notice of Satisfaction9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
11/18/2024440708183Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/05/2017421409309Open ↗
▸Energy Compliance5
▸DOB NOWPreliminary Commissioning Report Certification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports3
▸DOB NOWTR4 Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION6
05/16/2025400550845Open ↗
05/16/2025400550845Open ↗
12/23/2024421409309Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
01/06/2017421409309Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT1
01/05/2017421409309Open ↗
▸DOB NOWCertificate of Insurance1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCertification by Insurance Broker or Agency1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
03/15/2022440708183Open ↗
▸BISADDITIONAL INFORMATION1
05/16/2025400550845Open ↗
▸BISEFILING COVER SHEET1
01/05/2017421409309Open ↗
▸Other Documents25
▸DOB NOWSite Survey: Initial8
08/23/2026Q00540608-B3Open ↗
08/23/2026Q00540608-A6Open ↗
08/23/2026Q00540608-A3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone8
08/23/2026Q00540608-I1Open ↗
08/23/2026Q00540608-B3Open ↗
Showing 2 of 8 on file for this type
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProperty Ownership Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWHPD - Completion Notice2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM1
03/22/2024421134301Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdditional Insured Authorizations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type