← Back
BuildNYC
Elevator apt, miscellaneous
Beach Channel Apartments
18-26 REDFERN AVENUE · BIN 4624475
💬 Discuss this project
2023Year Built
8Stories
D9Building Class
R6Zoning
130,548 sfGross Floor Area
60Units
Rent Stabilized1 Active Violation ▸FDNY Report ↗
Elevator apt, miscellaneous · Owner of record: BCD Housing Development Fund · 32,171 sf lot · 4.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsCamber Property Group3 filings
Floor 11 filing
Site & exteriorDeergrow Developers5 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Camber Property Group4107/08/2026
Deergrow Developers2607/08/2026
BCD Housing Development Fund303/22/2026
2146 Mott203/21/2026
BSB Real Estate Holdings203/21/2026
S Associates203/21/2026
BRC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/25/2022$3.9M—— → —— not available
11/29/2018$1.2M—MIB REAL ESTATE HOLDINGS, LLC → 1312 BCD LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Urban Architectural Intitiatives904/07/2026
Skyline1312/30/2024
Ashraf407/17/2024
Paul Perdek, Prof. Engineering208/09/2023
Ospino Engineering205/15/2023
Gace305/04/2023
Tohfaz Uddin PE104/06/2023
Geodesign210/24/2022
Joel Phagoo P.E109/22/2022
NYC Department of Housing Preservation and Development104/05/2022
Krypton Engineering203/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
William Vitacco Associates2803/21/2026
Platinum Services NY803/21/2026
AO Consulting and Drafting403/21/2026
Expedite Dem203/21/2026
A1 Expediting Service603/21/2026
KD Designs103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Fifth Avenue BuildersGeneral Contractor1607/08/2026
Platinum Services NYScaffold804/09/2026
Five Boro AssociatesFire Protection607/08/2026
Top Shelf ElectricGeneral Contractor603/22/2026
Top Shelf ElectricElectrical603/21/2026
Skyline Scaffolding GroupScaffold404/09/2026
Proto P & H ServicesPlumbing307/08/2026
Metflow Fire ControlFire Protection307/08/2026
G.M.A. Plumbing & HeatingPlumbing207/08/2026
Vik XS ServicesScaffold204/09/2026
United Industries & ConstructionScaffold104/09/2026
Urban Architectural IntitiativesGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Regional Testing3942504/07/2026
Geodesign627712/30/2024
Joel Phagoo, PE2416109/22/2022
Building Lifecycle
All (249)Filed (40)Permit Issued (44)Signed Off (19)Violation (23)Inspection (14)Objection (79)Special Inspection (30)
04/29/2026
Signed off — New Building
Foundation work in conjunction with New Building
Q00540608-I1
04/07/2026
Filed — New Building
Foundation work in conjunction with New Building
Q00540608-B3
04/07/2026
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
04/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
04/07/2026
Special inspection requirement — Fenestration areas
Paul Raymond
04/07/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Paul Raymond
04/07/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
04/07/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Paul Raymond
04/07/2026
Special inspection requirement — Fenestration air leakage
Paul Raymond
04/07/2026
Special inspection requirement — Air barrier continuity plan testing
Paul Raymond
04/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
04/07/2026
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
04/07/2026
Special inspection requirement — Vestibules
Paul Raymond
04/07/2026
Special inspection requirement — Insulation placement and R values
Paul Raymond
04/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
07/18/2025
Violation issued (FDNY_NOV, closed)
07/09/2025
Objection resolved — Addressed
07/02/2025
Objection resolved — Addressed
06/12/2025
Violation issued (ECB, closed)
Construction
06/11/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
05/16/2025
Signed off — New Building
Foundation work in conjunction with New Building
Q00540608-Z5
05/15/2025
Objection raised — Admin
05/07/2025
Filed — New Building
Foundation work in conjunction with New Building
Q00540608-A7
04/16/2025
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
04/16/2025
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
04/16/2025
Special inspection requirement — Insulation placement and R values
Paul Raymond
04/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
04/16/2025
Special inspection requirement — Fenestration air leakage
Paul Raymond
04/16/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Paul Raymond
04/16/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Paul Raymond
04/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
04/16/2025
Special inspection requirement — Vestibules
Paul Raymond
04/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
04/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
04/16/2025
Special inspection requirement — Fenestration areas
Paul Raymond
04/16/2025
Special inspection requirement — Air barrier continuity plan testing
Paul Raymond
02/21/2025
Objection raised — Scope
02/21/2025
Objection raised — Scope
02/21/2025
Objection raised — Fire_Protection
02/21/2025
Objection raised — Scope
02/21/2025
Objection raised — Inspections
02/14/2025
Signed off — Alteration
Sprinkler / Standpipe work in conjunction with New Building Q00540608-I1
Q00651797-I1
02/12/2025
Objection raised — Other
02/07/2025
Filed — No Work
Q01146630-I1
01/30/2025
Signed off — Alteration
Q00651819-I1
01/30/2025
Filed — New Building
Foundation work in conjunction with New Building
Q00540608-A6
01/28/2025
Signed off — New Building
Foundation work in conjunction with New Building
Q00540608-S9
12/30/2024
Filed — New Building
Foundation work in conjunction with New Building
Q00540608-A4
12/30/2024
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
12/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
12/30/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
12/30/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
THOMAS THOMANN
12/30/2024
Special inspection requirement — Maintenance information
Paul Raymond
11/27/2024
Signed off — Alteration
Q00702589-I1
11/20/2024
Signed off — New Building
Foundation work in conjunction with New Building
Q00540608-S8
10/09/2024
Filed — New Building
Foundation work in conjunction with New Building
Q00540608-A3
09/11/2024
Signed off — New Building
Foundation work in conjunction with New Building
Q00540608-S7
Latest 60 of 249 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offProto P & H Services09/10/2024
DOB NOWCurb CutSigned-offFifth Avenue Builders06/26/2024
DOB NOWCurb CutSigned-offFifth Avenue Builders06/26/2024
DOB NOWConstruction FenceSigned-offPlatinum Services NY06/13/2024
DOB NOWConstruction FenceSigned-offPlatinum Services NY06/11/2024
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz06/06/2024
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz05/15/2024
DOB NOWProtection and Mechanical MethodsSigned-offPlatinum Services NY03/29/2024
DOB NOWStandpipeSigned-offFive Boro Associates01/08/2024
DOB NOWStandpipeSigned-offFive Boro Associates01/04/2024
DOB NOWSprinklersSigned-offFive Boro Associates01/04/2024
DOB NOWGeneral ConstructionPermit IssuedFifth Avenue Builders12/06/2023
DOB NOWEarth WorkSigned-offFifth Avenue Builders12/05/2023
DOB NOWStructuralSigned-offFifth Avenue Builders12/05/2023
DOB NOWMechanical SystemsSigned-offFifth Avenue Builders12/05/2023
DOB NOWPlumbingSigned-offProto P & H Services11/06/2023
DOB NOWGeneral ConstructionPermit IssuedFifth Avenue Builders08/08/2023
DOB NOWMechanical SystemsSigned-offFifth Avenue Builders08/04/2023
DOB NOWStructuralSigned-offFifth Avenue Builders08/02/2023
DOB NOWSupported ScaffoldSigned-offSkyline Scaffolding Group06/28/2023
DOB NOWSidewalk ShedSigned-offPlatinum Services NY06/23/2023
DOB NOWSidewalk ShedSigned-offPlatinum Services NY06/23/2023
DOB NOWProtection and Mechanical MethodsSigned-offVik XS Services05/16/2023
DOB NOWSupported ScaffoldSigned-offVik XS Services05/10/2023
DOB NOWPlumbingSigned-offProto P & H Services05/10/2023
DOB NOWStandpipeSigned-offFive Boro Associates05/04/2023
DOB NOWSprinklersSigned-offFive Boro Associates05/04/2023
DOB NOWStandpipeSigned-offFive Boro Associates05/04/2023
DOB NOWProtection and Mechanical MethodsSigned-offPlatinum Services NY04/07/2023
DOB NOWSprinklersSigned-offMetflow Fire Control03/23/2023
DOB NOWStandpipeSigned-offMetflow Fire Control03/23/2023
DOB NOWPlumbingSigned-offG.M.A. Plumbing & Heating03/09/2023
DOB NOWGeneral ConstructionPermit IssuedFifth Avenue Builders12/28/2022
DOB NOWStructuralSigned-offFifth Avenue Builders12/15/2022
DOB NOWEarth WorkSigned-offFifth Avenue Builders12/13/2022
DOB NOWGeneral ConstructionPermit IssuedFifth Avenue Builders12/01/2022
DOB NOWGeneral ConstructionPermit IssuedFifth Avenue Builders09/23/2022
DOB NOWSupported ScaffoldSigned-offSkyline Scaffolding Group09/23/2022
DOB NOWSupport of ExcavationSigned-offFifth Avenue Builders09/22/2022
DOB NOWPlumbingSigned-offG.M.A. Plumbing & Heating09/21/2022
+ 15 more permits on file
1 project · most recent 04/07/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
04/07/2026Signed-offFifth Avenue BuildersAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems
Cooling
Lg ARUN024GSS4 2 tons · Vrf Outdoor ×8
ARUM060GSS4 5 tons · Vrf Outdoor ×6
ARUM144BTE5 12 tons · Vrf Outdoor ×6
ARUM096BTE5 8 tons · Vrf Outdoor ×4
ARUM121BTE5 10 tons · Vrf Outdoor ×4
ARUN048GSS4 4 tons · Vrf Outdoor ×4
ARUM048GSS4 4 tons · Vrf Outdoor ×2
ARUM048GSS5 4 tons · Vrf Outdoor ×2
ARUM192BTE5 16 tons · Vrf Outdoor ×2
Renewaire HE1XRT 14,964 BTU · Erv ×4
HE4XRT 58,687 BTU · Erv ×4
EV450RT 10,255 BTU · Erv ×2
HE2XRT 26,747 BTU · Erv ×2
Loren Cook 0903206 AIH 90AI-3206-15 14,666 CFM · Exhaust Fan ×2
225 CPV 225CPV 5,600 CFM · Exhaust Fan ×2
Heat / Cool
Econ-Air EA2-D.250-20D 2,395 CFM · Makeup Air ×2
1 project · most recent 04/07/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/07/2026Signed-offProto P & H ServicesGas, Storm, Water/Sanitary
5 projects · most recent 06/26/2025
General Wiring
FiledStatusContractorScope
06/26/2025CompleteTop Shelf ElectricGeneral Wiring
04/19/2023CompleteIlluminous Electric—
11/01/2022CompleteTuxedo Electrical Contracting—
07/14/2022CompleteTop Shelf Electric2 meters, 2 new_meters
03/07/2022CompleteIlluminous ElectricGeneral Wiring
1 project · most recent 04/07/2026
Steel Concrete Masonry
FiledStatusContractorScope
04/07/2026Signed-offProto P & H ServicesSteel, Concrete, Masonry
1 project · most recent 04/07/2026
Scaffold
FiledStatusContractorScope
04/07/2026Signed-offProto P & H ServicesScaffold
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
12/30/2024Pass-Final SD - Fire PumpPassView ↗
08/14/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
07/09/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
06/27/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/12/2024Pass-Final Boiler Equipment InspectionPassView ↗
03/29/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/15/2024Pass-Final SD - Fire PumpPassView ↗
03/11/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/11/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/05/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
12/06/2022Pass-Final PL - UndergroundPassView ↗
11/15/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/27/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/27/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
04/07/2026Air barrier - visual inspectionPaul Raymondenergy_progress
04/07/2026Air barrier continuity plan testingPaul Raymondenergy_progress
04/07/2026Protection of exposed foundation insulationPaul Raymondenergy_progress
04/07/2026Insulation placement and R valuesPaul Raymondenergy_progress
04/07/2026Fenestration air leakagePaul Raymondenergy_progress
04/07/2026Fenestration areasPaul Raymondenergy_progress
04/07/2026Fire-Resistance Rated ConstructionPaul Raymondprogress
04/07/2026Energy Code Compliance InspectionsPaul Raymondprogress
04/07/2026Mastic and Intumescent Fire-resistant CoatingsPaul Raymondspecial
04/07/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
04/07/2026Exterior Insulation and Finish Systems (EIFS)Paul Raymondspecial
04/07/2026VestibulesPaul Raymondenergy_progress
04/07/2026Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
04/16/2025Insulation placement and R valuesPaul Raymondenergy_progress
04/16/2025Air barrier continuity plan testingPaul Raymondenergy_progress
04/16/2025VestibulesPaul Raymondenergy_progress
04/16/2025Fenestration air leakagePaul Raymondenergy_progress
04/16/2025Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
04/16/2025Exterior Insulation and Finish Systems (EIFS)Paul Raymondspecial
04/16/2025Fire-Resistant Penetrations and JointsPaul Raymondspecial
04/16/2025Mastic and Intumescent Fire-resistant CoatingsPaul Raymondspecial
04/16/2025Energy Code Compliance InspectionsPaul Raymondprogress
04/16/2025Fire-Resistance Rated ConstructionPaul Raymondprogress
04/16/2025Protection of exposed foundation insulationPaul Raymondenergy_progress
04/16/2025Air barrier - visual inspectionPaul Raymondenergy_progress
Latest 25 of 150.
▾Documents — 441 on file (BIS + DOB NOW)
▸Plans & Drawings40
▸DOB NOWPlans/Sketch39
08/26/2026Q00651819-I1Request digital key ↗
08/26/2026Q00702589-I1Request digital key ↗
08/25/2026Q00668430-I1Request digital key ↗
Showing 3 of 39 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION17
05/21/2025400550845Open ↗
05/20/2025440708183Open ↗
05/16/2025400550845Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION4
05/09/2022421791243Open ↗
05/09/2022421791243Open ↗
01/05/2017421409309Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHPD - Permit Notice2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records24
▸DOB NOWZD1: DOB Zoning Diagram8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWZoning Exhibit form (1-5)8
08/23/2026Q00540608-A6Open ↗
Showing 1 of 8 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
03/22/2024421134301Open ↗
04/09/2021440646062Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
03/22/2024421134301Open ↗
07/20/2021440646062Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
07/20/2021440646062Open ↗
▸BISZONING EXHIBIT II: CERTIFICATION1
03/22/2024421134301Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
03/22/2024421134301Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications214
▸DOB NOWProgress Inspector Seal & Signature108
09/27/2026Q00540608-S2Open ↗
09/23/2026Q00540608-A3Open ↗
09/23/2026Q00540608-A3Open ↗
Showing 3 of 108 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature55
09/27/2026Q00540608-S2Open ↗
09/27/2026Q00540608-S2Open ↗
09/27/2026Q00540608-S2Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature40
08/26/2026Q00651819-I1Open ↗
08/26/2026Q00702589-I1Open ↗
08/25/2026Q00668430-I1Open ↗
Showing 3 of 40 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
06/22/2022421791243Open ↗
05/09/2022421791243Open ↗
01/05/2017421409309Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/05/2017421409309Open ↗
11/05/2014421046040Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
01/05/2017421409309Open ↗
11/05/2014421046040Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/18/2020440646062Open ↗
▸Trade Schedules & Equipment14
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)7
08/23/2026Q00540608-A3Open ↗
Showing 1 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS2
08/11/2015421046040Open ↗
08/11/2015421046040Open ↗
▸BISSEWER CUT-OFF1
05/09/2022421791243Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
08/10/2015421046040Open ↗
▸BISGAS CUT-OFF1
05/09/2022421791243Open ↗
▸BISELECTRIC CUT-OFF1
05/09/2022421791243Open ↗
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection14
▸DOB NOWStreet Tree Checklist8
08/23/2026Q00540608-P3Open ↗
Showing 1 of 8 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
05/09/2022421791243Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/09/2022421791243Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/09/2022421791243Open ↗
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos35
▸DOB NOWOER: Notice to Proceed21
08/23/2026Q00540608-A6Open ↗
08/23/2026Q00540608-A3Open ↗
Showing 2 of 21 on file for this type
▸DOB NOWOER: Notice of Satisfaction9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/09/2022421791243Open ↗
01/05/2017421409309Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
11/18/2024440708183Open ↗
12/01/2020440646062Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
11/18/2020440646062Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/19/2015421046040Open ↗
11/07/2014421046040Open ↗
11/05/2014421046040Open ↗
▸DOB NOWPreliminary Commissioning Report Certification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/20/2021440646062Open ↗
11/18/2020440646062Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
03/19/2015421046040Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/20/2021440646062Open ↗
11/18/2020440646062Open ↗
▸DOB NOWTR4 Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs17
▸BISLETTERS - SUPPORTING DOCUMENTATION13
05/16/2025400550845Open ↗
05/16/2025400550845Open ↗
12/23/2024421409309Open ↗
Showing 3 of 13 on file for this type
▸BISLANDMARKS APPROVAL1
05/09/2022421791243Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
01/06/2017421409309Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/10/2015421046040Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
05/09/2022421791243Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT4
11/18/2020440646062Open ↗
01/05/2017421409309Open ↗
03/19/2015421046040Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/09/2022421791243Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
05/09/2022421791243Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCertificate of Insurance1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms10
▸BISBOROUGH INTAKE FORM3
06/22/2022421791243Open ↗
05/09/2022421791243Open ↗
10/13/2021421791243Open ↗
▸BISEFILING COVER SHEET3
10/13/2021421791243Open ↗
01/05/2017421409309Open ↗
11/05/2014421046040Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
03/15/2022440708183Open ↗
11/18/2020440646062Open ↗
▸BISADDITIONAL INFORMATION2
05/16/2025400550845Open ↗
12/01/2020440646062Open ↗
▸Other Documents26
▸DOB NOWSite Survey: Initial8
08/23/2026Q00540608-A3Open ↗
08/23/2026Q00540608-P5Open ↗
08/23/2026Q00540608-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone8
08/23/2026Q00540608-B3Open ↗
08/23/2026Q00540608-A3Open ↗
Showing 2 of 8 on file for this type
▸BISPLOT DIAGRAM2
03/22/2024421134301Open ↗
07/20/2021440646062Open ↗
▸DOB NOWHPD - Completion Notice2
08/23/2026Q00540608-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProperty Ownership Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAdditional Insured Authorizations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type