| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 01/13/2025 | $888K | — | — → — | $1,058/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| NS ENGINEERING, P.C. | 1 | 10/07/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/07/2025 | — | — | Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/07/2025 | — | — | Steel, Concrete, Wood |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/02/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 05/04/2026 | Metering | — | energy_progress |
| 05/04/2026 | Electric vehicle service equipment requirements | — | energy_progress |
| 05/04/2026 | Maintenance information | — | energy_progress |
| 05/04/2026 | Interior lighting power | — | energy_progress |
| 10/07/2025 | Structural Cold-Formed Steel | — | special |
| 10/07/2025 | Structural Steel - Details | — | special |
| 09/15/2025 | Ventilation and air distribution system | — | energy_progress |
| 09/15/2025 | Structural Stability – Alterations of existing buildings | — | special |
| 09/15/2025 | Insulation placement and R values | — | energy_progress |
| 09/15/2025 | Air barrier — testing | — | energy_progress |
| 09/15/2025 | Permanent certificate | — | energy_progress |
| 09/15/2025 | Fenestration areas | — | energy_progress |
| 09/15/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 09/15/2025 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 09/15/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 09/15/2025 | Fenestration air leakage | — | energy_progress |
| 09/15/2025 | Air barrier - visual inspection | — | energy_progress |
| 09/15/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 08/22/2025 | Footing and Foundation | — | progress |
| 08/22/2025 | Mechanical Systems | — | special |
| 08/22/2025 | Final | — | progress |