1984Year Built
1Stories
W9Building Class
M1-1Zoning
21,660 sfGross Floor Area
1Units
0 Open Violations
Miscellaneous educational facility · Owner of record: INFINITY QUEENS LLC · 48,750 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionOther
Roof15p · 5 filings · 20 docs
Floor 194p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
INFINITI QNS LLC ASIA BAN103/22/2026
NYC SCHOOL CONSTRUCTION AUTHORITY103/22/2026
MYTH DEVELOPMENT1603/21/2026
AJ PEGNO CONSTRUCTION COMPANY403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SPECTOR GROUP II LLP705/22/2025
LANGAN ENGINEERING506/21/2023
YSRAEL A. SEINUK, PC809/06/2022
JFK&M CONSULTING ENGINEERS708/24/2022
COSTA ARCH & ENG LLP105/16/2022
INFINITY DESIGN CONSULTANT INC103/18/2022
ROBERT FIELDS111/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES5803/21/2026
COSTA ARCHITECTURE & ENGINEERING LL203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LITEHOUSE BUILDERS INCGeneral Contractor1807/08/2026
EAGLE 1 MECHANICAL, INCFire Protection207/08/2026
R.A.M.S. MECHANICAL INCGeneral Contractor203/21/2026
CIVETTA MECHANICAL, LLCPlumbing107/08/2026
EAGLE 1 MECHANICAL, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS4001905/22/2025
COSTA ARCHITECTS & ENGINE1321105/16/2022
Building Lifecycle
All (123)Filed (31)Permit Issued (15)Signed Off (15)Violation (1)Inspection (17)Objection (14)Special Inspection (30)
02/27/2026
Signed off — Alteration CO
PROPOSED ALT 1 FOR CHANGE OF USE FROM WAREHOUSE TO NEW SCA Q443 3K CENTER, CHANGES OF OCCUPANCY GROUP AND INCREASED OF OCCUPANCY LOAD.
Q00603224-I1
07/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
06/26/2025
Special inspection requirement — Maintenance information
NELSON LOPEZ
06/02/2025
Objection resolved — Addressed
05/27/2025
Objection raised — Other
05/22/2025
Filed — Alteration CO
PROPOSED ALT 1 FOR CHANGE OF USE FROM WAREHOUSE TO NEW SCA Q443 3K CENTER, CHANGES OF OCCUPANCY GROUP AND INCREASED OF OCCUPANCY LOAD.
Q00603224-P3
03/28/2025
Special inspection requirement — Maintenance information
NELSON LOPEZ
03/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
01/02/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/12/2023
Signed off — Alteration
PL Civil application for repair and relay of the sanitary sewer connection and associated site removals and restoration
Q00612420-S1
12/12/2023
Signed off — Alteration
PL Civil application for repair and relay of the sanitary sewer connection and associated site removals and restoration
Q00612420-I1
12/12/2023
Signed off — Alteration
GENERAL CONSTRUCTION FOR PROPOSED SCA Q443 3K CENTER FIT OUT. FULL INTERIOR RENOVATION WITH EXTERIOR WINDOWS ENTRANCE CANOPY. OUTDOOR PLAY AREA.
Q00598001-I1
11/08/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
11/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/26/2023
Signed off — Alteration
GENERAL CONSTRUCTION FOR PROPOSED SCA Q443 3K CENTER FIT OUT. FULL INTERIOR RENOVATION WITH EXTERIOR WINDOWS ENTRANCE CANOPY. OUTDOOR PLAY AREA.
Q00598001-S2
10/24/2023
Signed off — Alteration
PROPOSED MECHANICAL APPLICATION FOR SCA Q443 3K CENTER FIT OUT. RENOVATION WORK INCLUDING THE FOLLOWING SYSTEMS: EQUIPMENT AND SERVICES. ROOFTOP MOUNTED AIR CONDITIONING UNITS WITH DX COIL AND ELECTRIC HEAT.
Q00598071-I1
09/27/2023
Permit issued — Plumbing
Q00612420-S1-PL
06/21/2023
Filed — Alteration
PL Civil application for repair and relay of the sanitary sewer connection and associated site removals and restoration
Q00612420-S1
01/18/2023
Filed — Alteration CO
PROPOSED ALT 1 FOR CHANGE OF USE FROM WAREHOUSE TO NEW SCA Q443 3K CENTER, CHANGES OF OCCUPANCY GROUP AND INCREASED OF OCCUPANCY LOAD.
Q00603224-P2
01/09/2023
Special inspection requirement — Maintenance information
NELSON LOPEZ
01/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
09/23/2022
Signed off — Alteration
HEREWITH FILING APPLICATION FOR INSTALLATION OF SEISMIC HANGERS
Q00721820-I1
09/15/2022
Signed off — Alteration
PROPOSED STRUCTURAL WORK FOR SCA Q443 3K CENTER FIT OUT.
Q00598052-I1
09/15/2022
Signed off — Alteration
Q00616692-I1
09/13/2022
Signed off — Alteration
GENERAL CONSTRUCTION FOR PROPOSED SCA Q443 3K CENTER FIT OUT. FULL INTERIOR RENOVATION WITH EXTERIOR WINDOWS ENTRANCE CANOPY. OUTDOOR PLAY AREA.
Q00598001-S1
09/13/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/12/2022
Signed off — Alteration
Q00610387-I1
09/12/2022
Signed off — Alteration
PROPOSED FOUNDATION WORK FOR SCA Q443 3K CENTER FIT OUT. NEW FLOOR SLAB/CANOPY FOOTINGS.
Q00598062-I1
09/12/2022
Signed off — Alteration
PROPOSED PLUMBING WORK FOR SCA Q443 3K CENTER FIT OUT. TO PROVIDE NEW PLUMBING FIXTURES, RELATED SANITARY, VENT AND DOMESTIC WATER PIPING, STORM WATER PIPING, ROOF DRAINS, OVERFLOW DRAINS, DOMESTIC HEAT PUMP, RPZ DEVICE, SEWAGE EJECTORS AND CONNECTIONS.
Q00598073-I1
09/12/2022
Signed off — Alteration
PROPOSED 15' CURB CUT APPLICATION LOCATED AT 132 STREET FOR SCA Q443 3K.
Q00610395-I1
09/12/2022
Signed off — Alteration
PROPOSED SPRINKLER FOR SCA Q443 3K CENTER FIT OUT. TO PROVIDE NEW BRANCH SPRINKLER PIPING AND SPRINKLER HEADS THROUGHOUT GROUND FLOOR.
Q00598080-I1
09/09/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/09/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
NELSON LOPEZ
09/09/2022
Special inspection requirement — Structural Steel - Welding
NELSON LOPEZ
09/09/2022
Special inspection requirement — Concrete - Cast-In-Place
NELSON LOPEZ
09/09/2022
Special inspection requirement — Structural Steel - High Strength Bolting
NELSON LOPEZ
09/09/2022
Special inspection requirement — Structural Steel - Details
NELSON LOPEZ
09/09/2022
Special inspection requirement — Final
Damian Monteiro
09/08/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/08/2022
Special inspection requirement — Final
Michele O'Connor
09/08/2022
Special inspection requirement — Subgrade Inspections
NELSON LOPEZ
09/07/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/06/2022
Filed — Alteration
PROPOSED STRUCTURAL WORK FOR SCA Q443 3K CENTER FIT OUT.
Q00598052-P3
09/02/2022
Filed — Alteration
PL Civil application for repair and relay of the sanitary sewer connection and associated site removals and restoration
Q00612420-P1
09/02/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/02/2022
Special inspection requirement — Concrete - Cast-In-Place
NELSON LOPEZ
09/02/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
NELSON LOPEZ
09/02/2022
Special inspection requirement — Final
Damian Monteiro
09/02/2022
Special inspection requirement — Structural Steel - Welding
NELSON LOPEZ
09/02/2022
Special inspection requirement — Structural Steel - High Strength Bolting
NELSON LOPEZ
09/02/2022
Special inspection requirement — Structural Steel - Details
NELSON LOPEZ
08/31/2022
Filed — Alteration
GENERAL CONSTRUCTION FOR PROPOSED SCA Q443 3K CENTER FIT OUT. FULL INTERIOR RENOVATION WITH EXTERIOR WINDOWS ENTRANCE CANOPY. OUTDOOR PLAY AREA.
Q00598001-P1
08/31/2022
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
08/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
08/31/2022
Special inspection requirement — Masonry
NELSON LOPEZ
08/31/2022
Special inspection requirement — Final
MARC SPECTOR
08/31/2022
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
NELSON LOPEZ
08/31/2022
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCIVETTA MECHANICAL, LLC09/27/2023
DOB NOWSprinklersSigned-offEAGLE 1 MECHANICAL, INC05/23/2022
DOB NOWStructuralSigned-offLITEHOUSE BUILDERS INC04/15/2022
DOB NOWFoundationSigned-offLITEHOUSE BUILDERS INC04/12/2022
DOB NOWGeneral ConstructionPermit IssuedLITEHOUSE BUILDERS INC04/07/2022
DOB NOWSprinklersSigned-offEAGLE 1 MECHANICAL, INC04/01/2022
DOB NOWPlumbingSigned-offEAGLE 1 MECHANICAL, INC04/01/2022
DOB NOWMechanical SystemsSigned-offR.A.M.S. MECHANICAL INC03/31/2022
DOB NOWEarth WorkSigned-offLITEHOUSE BUILDERS INC03/16/2022
DOB NOWGeneral ConstructionSigned-offLITEHOUSE BUILDERS INC03/08/2022
DOB NOWCurb CutSigned-offLITEHOUSE BUILDERS INC03/02/2022
DOB NOWCurb CutSigned-offLITEHOUSE BUILDERS INC03/02/2022
DOB NOWGeneral ConstructionSigned-offLITEHOUSE BUILDERS INC02/25/2022
DOB NOWGeneral ConstructionSigned-offLITEHOUSE BUILDERS INC02/25/2022
DOB NOWGeneral ConstructionSigned-offLITEHOUSE BUILDERS INC02/24/2022
BISSPISSUEDMPS PLUMBING & HEATING INC09/01/2009
BISEQISSUEDWINDSTAR CONSTRUCTION CORP05/28/2009
BIS—ISSUEDWINDSTAR CONSTRUCTION CORP05/28/2009
BISEQISSUEDA1 EMPIRE CONSTRUCTION, INC03/16/2007
BIS—ISSUEDA1 EMPIRE CONSTRUCTION, INC.03/16/2007
BISCCISSUEDNY SUNSHINE CONSTRUCTION12/15/2006
BISSPISSUEDPINNACLE PLBG & HTG CORP12/04/2006
BISPLISSUEDPINNACLE PLBG & HTG CORP11/09/2006
BISEQISSUEDNY SUNSHINE CON INC11/08/2006
BIS—ISSUEDNY SUNSHINE CON INC11/08/2006
BISOTISSUEDCRONUS MECHANICAL, INC06/30/2006
BISOTISSUEDNORTH SHORE NEON SIGN LLC06/04/2004
BIS—ISSUEDNORTH SHORE NEON SIGN CO., INC06/04/2004
BISPLISSUEDGJK MECHANICAL INC09/11/2003
BISOTISSUEDAJ PEGNO CONSTRUCTION CORP06/16/2003
BISSPISSUEDUNIVERSAL SPRINKLER CORP04/10/1992
BISMHISSUEDWIRAY METAL12/09/1991
BISOTISSUEDWIRAY METAL FABRICATORS11/15/1991
BISMHISSUEDWIRAY METAL06/14/1991
3 projects · most recent 09/15/2026
General Wiring
FiledStatusContractorScope
09/15/2026CompleteCHARAN ELEC'L ENTERP'S IN—
09/19/2022CompleteTOWER ELECTRIC INC.General Wiring
03/30/2022CompleteTOWER ELECTRIC INC.—
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
07/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/02/2023Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
11/01/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/13/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/09/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/08/2022Pass-Final CND-Occupancy InspectionPassView ↗
09/07/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
09/02/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/10/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/10/2022Certified Sprinkler - SP - RoughingCertifiedView ↗
06/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/17/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/06/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 98
DateRequirementInspectorRole
06/26/2025Maintenance informationNELSON LOPEZenergy_progress
06/26/2025Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
03/28/2025Maintenance informationNELSON LOPEZenergy_progress
03/28/2025Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
01/09/2023Maintenance informationNELSON LOPEZenergy_progress
01/09/2023Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
09/09/2022Structural Steel - High Strength BoltingNELSON LOPEZspecial
09/09/2022Structural Stability – Alterations of existing buildingsNELSON LOPEZspecial
09/09/2022Structural Steel - WeldingNELSON LOPEZspecial
09/09/2022Structural Steel - DetailsNELSON LOPEZspecial
09/09/2022FinalDamian Monteiroprogress
09/09/2022Concrete - Cast-In-PlaceNELSON LOPEZspecial
09/08/2022FinalMichele O'Connorprogress
09/08/2022Subgrade InspectionsNELSON LOPEZspecial
09/02/2022Structural Stability – Alterations of existing buildingsNELSON LOPEZspecial
09/02/2022FinalDamian Monteiroprogress
09/02/2022Structural Steel - WeldingNELSON LOPEZspecial
09/02/2022Structural Steel - High Strength BoltingNELSON LOPEZspecial
09/02/2022Structural Steel - DetailsNELSON LOPEZspecial
09/02/2022Concrete - Cast-In-PlaceNELSON LOPEZspecial
08/31/2022FinalMARC SPECTORprogress
08/31/2022Mastic and Intumescent Fire-resistant CoatingsNELSON LOPEZspecial
08/31/2022MasonryNELSON LOPEZspecial
08/31/2022Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
08/31/2022Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
Latest 25 of 98.
▾Documents — 238 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch31
08/27/2026Q00612420-P1Request digital key ↗
08/27/2026Q00612420-S1Request digital key ↗
08/27/2026Q00612420-I1Request digital key ↗
Showing 3 of 31 on file for this type
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION9
12/02/2025420288076Open ↗
10/31/2024440693723Open ↗
11/22/2021440693723Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION3
09/02/2009420037515Open ↗
09/01/2009420052720Open ↗
05/28/2009420037515Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/31/2022440693723Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/16/2009420037515Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
05/13/2025440693723Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00603224-I1Open ↗
▸Seals & Professional Certifications92
▸DOB NOWDPL-1: Design Professional Seal & Signature31
08/27/2026Q00610395-I1Open ↗
08/27/2026Q00610387-I1Open ↗
08/27/2026Q00616692-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
09/19/2026Q00598062-I1Open ↗
09/19/2026Q00598062-I1Open ↗
09/01/2026Q00616692-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/19/2026Q00598062-I1Open ↗
09/19/2026Q00598062-I1Open ↗
09/01/2026Q00598052-P1Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
11/18/2010420288076Open ↗
11/20/2009420037515Open ↗
11/20/2009420037515Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/22/2021440693723Open ↗
▸Trade Schedules & Equipment14
▸BISEQUIPMENT USE PERMITS6
12/04/2009420037515Open ↗
12/04/2009420037515Open ↗
12/04/2009420037515Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
10/21/2009420037515Open ↗
10/20/2009420052720Open ↗
09/29/2009420037515Open ↗
▸BISSCHEDULE B - PLUMBING3
09/17/2009420037515Open ↗
07/22/2009420052720Open ↗
03/27/2009420037515Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
10/20/2009420052720Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/04/2009420037515Open ↗
▸Safety & Tenant Protection13
▸BISSTREET TREE CHECKLIST4
05/13/2025440693723Open ↗
12/15/2021440693723Open ↗
11/20/2009420037515Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Checklist4
08/25/2026Q00603224-P2Open ↗
08/25/2026Q00603224-P1Open ↗
08/15/2026Q00603224-P3Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
01/06/2022440693723Open ↗
▸BISSTREET TREE SIGNOFF1
11/16/2023440693723Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00603224-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00603224-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00603224-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form12
08/27/2026Q00616692-I1Open ↗
08/27/2026Q00598001-S2Open ↗
08/27/2026Q00598001-S1Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
07/22/2009420052720Open ↗
03/27/2009420037515Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00603224-I1Open ↗
08/13/2026Q00598071-I1Open ↗
▸Inspections & Test Reports5
▸BISHYDRO FLOW TEST LETTER1
07/22/2009420052720Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
11/20/2009420037515Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
11/20/2009420037515Open ↗
▸BISBPP: SIDEWALK CONCRETE STRENGTH REPORT1
05/13/2025440693723Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026Q00598062-I1Open ↗
▸Approvals, Objections & Sign-offs19
▸DOB NOWDEP Variance (V5) letter6
08/26/2026Q00598080-I1Open ↗
08/26/2026Q00598073-I1Open ↗
08/14/2026Q00603224-I1Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
01/06/2022440693723Open ↗
11/18/2010420288076Open ↗
07/22/2009420052720Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/04/2009420037515Open ↗
11/07/2009420052720Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
05/13/2025440693723Open ↗
11/20/2023440693723Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/07/2009420037515Open ↗
11/07/2009420052720Open ↗
▸BISDOT APPROVAL OF APEX CORNER PED-RAMP1
05/13/2025440693723Open ↗
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
01/06/2022440693723Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
03/27/2009420037515Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
11/20/2009420037515Open ↗
11/07/2009420052720Open ↗
07/22/2009420052720Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
05/13/2025440693723Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION6
11/19/2024440693723Open ↗
01/06/2022440693723Open ↗
01/06/2022440693723Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET3
11/18/2010420288076Open ↗
07/22/2009420052720Open ↗
03/27/2009420037515Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/22/2021440693723Open ↗
▸Other Documents17
▸DOB NOWProperty Ownership Certification4
08/25/2026Q00603224-P2Open ↗
08/25/2026Q00603224-P1Open ↗
08/15/2026Q00603224-P3Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
05/13/2025440693723Open ↗
12/15/2021440693723Open ↗
▸BISSHOW COMPLIANCE WITH LL 21/091
01/06/2022440693723Open ↗
▸BISNYS DEC FRESHWATER WETLANDS MAP1
01/06/2022440693723Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
05/13/2025440693723Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
05/13/2025440693723Open ↗
▸BISPLOT DIAGRAM1
03/27/2009420037515Open ↗
▸BISBPP: SIDEWALK & ROADWAY THICKNESS CORES1
05/13/2025440693723Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
12/15/2021440693723Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
05/13/2025440693723Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
05/13/2025440693723Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00603224-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00598001-S2Open ↗