Factory, light manufacturing
18-39 41ST STREET
QUEENS · BIN 4015671
💬 Discuss this project
2021Year Built
2Stories
F5Building Class
M1-1Zoning
34,777 sfGross Floor Area
1Units
3 Open Violations ▸
Factory, light manufacturing · Owner of record: LORDEV1 LLC · 14,000 sf lot · 2.48 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof12p · 4 filings · 20 docs
Floor 214p · 5 filings · 20 docs
Floor 113p · 5 filings · 20 docs
Cellar7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
L GROUP1307/08/2026
SHOW CASE DESIGN CORP6407/08/2026
PLATINUM SERVICES NY903/22/2026
EXPEDITE DEM INC503/22/2026
LORDEV1 LLC303/22/2026
DISANO CONSTRUCTION CO IN103/22/2026
1839 LOR LLC 1839 LUCC1603/21/2026
1839 LUCC LLC 1839 LOR403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/28/2018$800K—Private party → 1839 LUCC LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SEAN PATRICK FREITAS712/29/2025
INDEPENDENCE210/29/2025
SIDERIS KEFALAS ENGINEERS PC508/20/2025
GERALD CALIENDO ARCHITECTS1008/17/2023
ASIF JAMIL, RA209/22/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.1803/21/2026
GERALD J. CALIENDO R.A., P.C.1003/21/2026
GREEN STUDIO403/21/2026
EXPEDITE DEM203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SHOWCASE DESIGNS CORPGeneral Contractor1107/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor603/21/2026
J. SMITH CONSTRUCTION INC.General Contractor503/22/2026
DISANO CONSTRUCTION CO INGeneral Contractor303/21/2026
JB LUXURY HOMES RENOVATI*General Contractor307/08/2026
P.H. WORKS INCPlumbing207/08/2026
J. SMITH CONSTRUCTION INCElectrical203/21/2026
ADRIANO PLUMBING & HEATINGFire Protection207/08/2026
CHENOWETH GROUP INCGeneral Contractor207/08/2026
GEHLERT BARRIOSElectrical203/21/2026
RONAN ELECTRICAL LLCElectrical103/22/2026
ADRIANO PLMBG & HTG CORPPlumbing107/08/2026
P H WORKSGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SKYLINE ENGINEERING, PLLC267610/29/2025
SIDERIS KEFALAS ENGINEERS3434101/09/2025
INTERNATIONAL GEOTEHCNICA1795808/17/2023
Building Lifecycle
All (128)Filed (27)Permit Issued (19)Signed Off (12)Violation (14)Inspection (16)Objection (10)Special Inspection (30)
02/17/2026
Signed off — Alteration
Modifications to existing HVAC and ductwork as per plans filed herewith. No change to use, egress, or occupancy.
Q01145922-I1
02/10/2026
Signed off — Alteration
Plumbing additions and modifications as per plans filed herewith. No change to use, egress or occupancy.
Q01201311-I1
01/21/2026
Signed off — Alteration
Structural modifications on 2nd floor and roof as per plans filed herewith. No change to use, egress, or occupancy.
Q01201315-I1
01/21/2026
Signed off — Alteration
Interior renovations and modifications as per plans filed herewith. No change to use, egress, or occupancy.
Q01139898-I1
01/12/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/29/2025
Filed — Alteration
Plumbing additions and modifications as per plans filed herewith. No change to use, egress or occupancy.
Q01201311-P2
11/13/2025
Special inspection requirement — Final
Matthew Wavro
10/30/2025
Filed — Alteration
Interior renovations and modifications as per plans filed herewith. No change to use, egress, or occupancy.
Q01139898-P1
10/30/2025
Filed — Alteration
Plumbing additions and modifications as per plans filed herewith. No change to use, egress or occupancy.
Q01201311-P1
10/29/2025
Filed — Alteration
Modifications to existing HVAC and ductwork as per plans filed herewith. No change to use, egress, or occupancy.
Q01145922-P1
10/21/2025
Special inspection requirement — Final
hon chau
10/21/2025
Special inspection requirement — Ventilation and air distribution system
hon chau
10/21/2025
Special inspection requirement — Mechanical Systems
Matthew Wavro
10/01/2025
Signed off — Alteration
Filing for relocation of sprinkler heads, on first floor only, to coordinate with architectural partition changes occurring as part of alteration application #Q01139898-I1.
Q01156439-I1
09/09/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
08/26/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/22/2025
Special inspection requirement — Sprinkler Systems
Chris Sideris
08/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
08/20/2025
Filed — Alteration
Filing for relocation of sprinkler heads, on first floor only, to coordinate with architectural partition changes occurring as part of alteration application #Q01139898-I1.
Q01156439-P1
08/05/2025
Special inspection requirement — Sprinkler Systems
Matthew Wavro
08/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
07/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/05/2025
Permit issued — Structural
Q01201315-I1-ST
05/27/2025
Filed — Alteration
Structural modifications on 2nd floor and roof as per plans filed herewith. No change to use, egress, or occupancy.
Q01201315-P1
05/14/2025
Special inspection requirement — Final
Matthew Wavro
05/14/2025
Special inspection requirement — Structural Cold-Formed Steel
Matthew Wavro
05/14/2025
Special inspection requirement — Structural Steel - Details
Matthew Wavro
05/09/2025
Permit issued — Plumbing
Q01201311-I1-PL
04/23/2025
Filed — Alteration
Plumbing additions and modifications as per plans filed herewith. No change to use, egress or occupancy.
Q01201311-I1
04/23/2025
Filed — Alteration
Structural modifications on 2nd floor and roof as per plans filed herewith. No change to use, egress, or occupancy.
Q01201315-I1
03/05/2025
Permit issued — Mechanical Systems
Q01145922-I1-MS
03/05/2025
Permit issued — General Construction
Q01139898-I1-GC
01/22/2025
Permit issued — Mechanical Systems
Q01145922-I1-MS
01/21/2025
Permit issued — Sprinklers
Q01156439-I1-EW-SP
01/15/2025
Permit issued — General Construction
Q01139898-I1-GC
01/09/2025
Filed — Alteration
Filing for relocation of sprinkler heads, on first floor only, to coordinate with architectural partition changes occurring as part of alteration application #Q01139898-I1.
Q01156439-I1
01/06/2025
Filed — Alteration
Modifications to existing HVAC and ductwork as per plans filed herewith. No change to use, egress, or occupancy.
Q01145922-I1
12/11/2024
Filed — Alteration
Interior renovations and modifications as per plans filed herewith. No change to use, egress, or occupancy.
Q01139898-I1
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/31/2024
Violation issued (ECB, closed)
Construction
08/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/17/2023
Filed — Alteration CO
HEREWITH FILING FOR CHANGE OF USE ON EXISTING SECOND FLOOR, WORK TO INCLUDE AT SECOND FLOOR MINOR NON-BEARING PARTITIONS, DOORS, CASEWORK AS PER PLANS AND OBTAIN AN AMENDED CO.
Q08040139-P5
08/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
08/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL KARANTINIDIS, P.E.
08/10/2023
Objection resolved — Addressed
08/09/2023
Objection raised — Admin
07/31/2023
Filed — Alteration CO
HEREWITH FILING FOR CHANGE OF USE ON EXISTING SECOND FLOOR, WORK TO INCLUDE AT SECOND FLOOR MINOR NON-BEARING PARTITIONS, DOORS, CASEWORK AS PER PLANS AND OBTAIN AN AMENDED CO.
Q08040139-P4
07/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
07/28/2023
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL KARANTINIDIS, P.E.
07/13/2023
Signed off — Alteration
Modification of existing sprinkler system and installation of plumbing fixtures. Filed in conjunction with Alt Type 1, DOB NOW #Q08040139.
Q00825376-I1
06/29/2023
Signed off — Alteration
Installation of ductwork and diffusers interconnected to existing rooftop HVAC units previously filed/approved under BIS # 421739293. Obtaining COC for HVAC units to correct error. No change to use, occupancy or egress associated with this application.
Q00827483-I1
06/28/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/26/2023
Filed — Alteration CO
HEREWITH FILING FOR CHANGE OF USE ON EXISTING SECOND FLOOR, WORK TO INCLUDE AT SECOND FLOOR MINOR NON-BEARING PARTITIONS, DOORS, CASEWORK AS PER PLANS AND OBTAIN AN AMENDED CO.
Q08040139-P3
06/22/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/21/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/21/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/21/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
06/20/2023
Permit issued — Mechanical Systems
Q00827483-I1-MS
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offJB LUXURY HOMES RENOVATI*06/05/2025
DOB NOWPlumbingSigned-offP.H. WORKS INC05/09/2025
DOB NOWMechanical SystemsSigned-offJB LUXURY HOMES RENOVATI*03/05/2025
DOB NOWGeneral ConstructionSigned-offJB LUXURY HOMES RENOVATI*03/05/2025
DOB NOWMechanical SystemsSigned-offCHENOWETH GROUP01/22/2025
DOB NOWSprinklersSigned-offADRIANO PLUMBING & HEATIN01/21/2025
DOB NOWGeneral ConstructionSigned-offCHENOWETH GROUP01/15/2025
DOB NOWMechanical SystemsSigned-offSHOWCASE DESIGNS CORP06/20/2023
DOB NOWPlumbingSigned-offADRIANO PLUMBING & HEATIN04/19/2023
DOB NOWSprinklersSigned-offADRIANO PLMBG & HTG CORP03/22/2023
DOB NOWGeneral ConstructionPermit IssuedSHOWCASE DESIGNS CORP03/16/2023
DOB NOWCurb CutSigned-offSHOWCASE DESIGNS CORP06/22/2021
DOB NOWCurb CutSigned-offSHOWCASE DESIGNS CORP06/18/2021
DOB NOWConstruction FenceSigned-offSHOWCASE DESIGNS CORP05/06/2021
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC09/23/2020
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC08/19/2020
DOB NOWConstruction FenceSigned-offSHOWCASE DESIGNS CORP07/09/2020
DOB NOWConstruction FenceSigned-offSHOWCASE DESIGNS CORP10/25/2019
DOB NOWConstruction FenceSigned-offDISANO CONSTRUCTION CO IN06/28/2018
BIS—ISSUEDSHOWCASE DESIGNS CORP08/17/2021
BIS—ISSUEDSHOWCASE DESIGNS CORP06/18/2021
BIS—ISSUEDSHOWCASE DESIGNS CORP08/05/2020
BIS—ISSUEDSHOWCASE DESIGNS CORP07/06/2020
BISPLISSUEDD.D.S. MECH PBG&HTG CORP06/26/2020
BIS—ISSUEDSHOWCASE DESIGNS CORP03/18/2020
BIS—ISSUEDDISANO CONSTRUCTION CO IN08/09/2018
BIS—ISSUEDDISANO CONSTRUCTION CO IN07/13/2018
BIS—ISSUEDDISANO CONSTRUCTION CO IN07/13/2018
7 projects · most recent 01/11/2026
General Wiring
FiledStatusContractorScope
01/11/2026CompleteRONAN ELECTRICAL LLCGeneral Wiring
06/12/2025Permit IssuedG. POULAKIS ELEC'L CONTR'6 meters, 1 new_meters
11/24/2021CompleteG. POULAKIS ELEC'L CONTR'—
12/07/2020CompleteG. POULAKIS ELEC'L CONTR'General Wiring
08/06/2020CompleteILLUMINOUS ELECTRIC CORP.—
06/10/2020CompleteTHYSSENKRUPP ELEVATOR CO—
02/25/2020CompleteG. POULAKIS ELEC'L CONTR'General Wiring
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
01/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/09/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
08/26/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/28/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/22/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/21/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
06/12/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
06/09/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
06/27/2022Fail-Final Curb Cut Non-Directive 14FailView ↗
06/27/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
11/13/2025FinalMatthew Wavroprogress
10/21/2025Finalhon chauprogress
10/21/2025Ventilation and air distribution systemhon chauenergy_progress
10/21/2025Mechanical SystemsMatthew Wavrospecial
08/22/2025Sprinkler SystemsChris Siderisspecial
08/22/2025Fire-Resistant Penetrations and JointsMatthew Wavrospecial
08/05/2025Sprinkler SystemsMatthew Wavrospecial
08/05/2025Fire-Resistant Penetrations and JointsMatthew Wavrospecial
05/14/2025FinalMatthew Wavroprogress
05/14/2025Structural Cold-Formed SteelMatthew Wavrospecial
05/14/2025Structural Steel - DetailsMatthew Wavrospecial
08/16/2023Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
08/16/2023Fire-Resistance Rated ConstructionMICHAEL KARANTINIDIS, P.E.progress
07/28/2023Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
07/28/2023Fire-Resistance Rated ConstructionMICHAEL KARANTINIDIS, P.E.progress
06/20/2023Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
06/20/2023Fire-Resistance Rated ConstructionMICHAEL KARANTINIDIS, P.E.progress
05/12/2023Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
05/12/2023HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
05/12/2023HVAC-R and service water heating equipmentMICHAEL KARANTINIDIS, P.E.energy_progress
05/12/2023Sprinkler SystemsMICHAEL KARANTINIDIS, P.E.special
05/12/2023HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
05/05/2023Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
05/05/2023Fire-Resistance Rated ConstructionMICHAEL KARANTINIDIS, P.E.progress
05/04/2023HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
Latest 25 of 32.
▾Documents — 264 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch21
08/29/2026Q00040885-I1Request digital key ↗
08/24/2026Q00825376-P1Request digital key ↗
08/24/2026Q00825376-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut2
08/28/2026Q00247567-I1Request digital key ↗
08/28/2026Q00247531-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/28/2026Q00381489-I1Request digital key ↗
08/15/2026Q00381489-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/25/2026Q00813795-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00216648-I1Request digital key ↗
▸Applications & Permits30
▸BISPLAN / WORK APPROVAL APPLICATION19
01/06/2022421739293Open ↗
08/05/2021421739293Open ↗
01/07/2021421795418Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION9
09/29/2021421739293Open ↗
06/26/2020421739293Open ↗
06/26/2020421739293Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/16/2021421739293Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
11/07/2019421795418Open ↗
▸Zoning, Tax Lot & Property Records16
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026Q08040139-P5Open ↗
08/13/2026Q08040139-I1Open ↗
08/13/2026Q08040139-P4Open ↗
▸DOB NOWRestrictive Declaration/Easement 23
08/13/2026Q08040139-P5Open ↗
08/13/2026Q08040139-I1Open ↗
08/13/2026Q08040139-P4Open ↗
▸BISZONING DIAGRAM2
01/25/2021421739293Open ↗
08/29/2019421739293Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION2
08/19/2019421739293Open ↗
08/19/2019421739293Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q08040139-I1Open ↗
08/13/2026Q08040139-P5Open ↗
▸BISVERIFY TAX LOT1
10/15/2021421739293Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/15/2021421739293Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
12/19/2019421795418Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08040139-I1Open ↗
▸Seals & Professional Certifications66
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/28/2026Q00216648-I1Open ↗
08/28/2026Q00247531-I1Open ↗
08/28/2026Q00381489-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026Q01145922-P1Open ↗
09/01/2026Q00825376-I1Open ↗
09/01/2026Q00825376-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026Q01145922-P1Open ↗
09/01/2026Q00825376-I1Open ↗
09/01/2026Q08040139-P2Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
11/12/2019421739293Open ↗
11/07/2019421739293Open ↗
11/07/2019421739293Open ↗
Showing 3 of 11 on file for this type
▸Trade Schedules & Equipment10
▸BISELECTRIC CUT-OFF2
09/12/2018421603919Open ↗
08/08/2018421603893Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0212
09/12/2018421603919Open ↗
08/06/2018421603919Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/10/2019421739293Open ↗
06/10/2019421739293Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
11/16/2021421739293Open ↗
▸BISGAS CUT-OFF1
08/08/2018421601252Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
05/24/2022421937337Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
08/19/2019421739293Open ↗
▸Safety & Tenant Protection17
▸DOB NOWStreet Tree Checklist6
08/13/2026Q08040139-I1Open ↗
08/13/2026Q08040139-P4Open ↗
08/13/2026Q08040139-P5Open ↗
Showing 3 of 6 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE4
11/12/2019421739293Open ↗
09/12/2018421603919Open ↗
08/08/2018421601252Open ↗
Showing 3 of 4 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST3
09/12/2018421603919Open ↗
08/08/2018421603893Open ↗
08/08/2018421601252Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
09/12/2018421603919Open ↗
08/08/2018421603893Open ↗
08/08/2018421601252Open ↗
▸BISSTREET TREE CHECKLIST1
12/19/2019421739293Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
09/12/2018421603919Open ↗
08/08/2018421601252Open ↗
08/08/2018421603893Open ↗
▸BISRODENT CONTROL3
09/12/2018421603919Open ↗
08/08/2018421601252Open ↗
08/08/2018421603893Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
11/12/2019421739293Open ↗
11/07/2019421739293Open ↗
11/07/2019421739293Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
10/08/2021421739293Open ↗
10/08/2021421739293Open ↗
10/08/2021421739293Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/15/2021421739293Open ↗
10/08/2021421739293Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
11/05/2021421739293Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY4
10/15/2021421739293Open ↗
10/15/2021421739293Open ↗
10/08/2021421739293Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
11/07/2019421739293Open ↗
11/07/2019421739293Open ↗
11/07/2019421739293Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
10/25/2021421739293Open ↗
11/07/2019421739293Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/19/2019421739293Open ↗
▸BISHYDRO FLOW TEST LETTER1
08/19/2019421739293Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
11/01/2021421739293Open ↗
▸Approvals, Objections & Sign-offs21
▸BISLETTERS - SUPPORTING DOCUMENTATION12
12/19/2019421795418Open ↗
08/30/2019421739293Open ↗
09/12/2018421603919Open ↗
Showing 3 of 12 on file for this type
▸BISLANDMARKS APPROVAL3
09/12/2018421603919Open ↗
08/08/2018421601252Open ↗
08/08/2018421603893Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM2
08/19/2019421739293Open ↗
09/12/2018421603919Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
01/07/2021421739293Open ↗
08/20/2019421739293Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
10/13/2021421795418Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/24/2025421937337Open ↗
▸Cost, Insurance & Ownership10
▸BISPROJECT-SPECIFIC GL INSURANCE4
03/20/2020421739293Open ↗
11/12/2019421739293Open ↗
08/08/2018421603893Open ↗
Showing 3 of 4 on file for this type
▸BISDEPT OF FINANCE VERIFICATION3
09/12/2018421603919Open ↗
08/08/2018421603893Open ↗
08/08/2018421601252Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
09/12/2018421603919Open ↗
▸BISCOST AFFIDAVIT1
06/10/2019421937337Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
05/24/2022421937337Open ↗
▸Filing & Intake Forms21
▸BISEFILING COVER SHEET11
11/07/2019421795418Open ↗
08/21/2019421739293Open ↗
08/21/2019421739293Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION9
06/23/2022421739293Open ↗
06/23/2022421739293Open ↗
06/23/2022421739293Open ↗
Showing 3 of 9 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
11/07/2019421795418Open ↗
▸Other Documents16
▸DOB NOWProperty Ownership Certification6
08/13/2026Q08040139-I1Open ↗
08/13/2026Q08040139-P2Open ↗
08/13/2026Q08040139-P1Open ↗
Showing 3 of 6 on file for this type
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form4
09/14/2021421739293Open ↗
09/14/2021421739293Open ↗
06/09/2021421795418Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM2
10/15/2021421739293Open ↗
08/08/2018421601252Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
05/15/2020421795418Open ↗
08/20/2019421739293Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
09/11/2018421603919Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q08040139-I1Open ↗