Roof7p · 2 filings · 20 docs
DMMechanicalStructural
Repair of half-timber bearing walls, reinforcement of floor joists, replacement of floor joists, repair of the facades and connecting the facades to the wooden floors, reinforce roof structure, repoint brick front facades, repoint and repair masonry chi
On file for this project
12 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY SHORING & BRACING TO STABILIZE BUILDING AS PER PLANS FILED HEREWITH. HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH THE STABILIZATION AT ADJACENT BUILDING, 20 CHRISTOPHER ST (M00864023).
On file for this project
20 documents · 4 drawing sheets
Floor 431p · 1 filing · 12 docs
Mechanical
INSTALLATION OF MECHANICAL SYSTEM IN CONJUNCTION WITH APPLICATION #M08046036 AND M08017459. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
12 documents · 1 drawing sheet
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 331p · 1 filing · 20 docs
Structural
INSTALLATION OF TEMPORARY SHORING & BRACING TO STABILIZE BUILDING AS PER PLANS FILED HEREWITH. HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH THE STABILIZATION AT ADJACENT BUILDING, 20 CHRISTOPHER ST (M00864023).
On file for this project
20 documents · 1 drawing sheet
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 38p · 5 filings · 20 docs
ArchitectureDMMechanicalStructural
INSTALLATION OF MECHANICAL SYSTEM IN CONJUNCTION WITH APPLICATION #M08046036 AND M08017459. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
12 documents · 2 drawing sheets
Renovate public halls on the 1st- 3rd floors as per plans. No change to bulk or use.
On file for this project
7 documents · 1 drawing sheet
Repair of half-timber bearing walls, reinforcement of floor joists, replacement of floor joists, repair of the facades and connecting the facades to the wooden floors, reinforce roof structure, repoint brick front facades, repoint and repair masonry chi
On file for this project
12 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 25p · 3 filings · 20 docs
ArchitectureMechanicalStructural
INSTALLATION OF MECHANICAL SYSTEM IN CONJUNCTION WITH APPLICATION #M08046036 AND M08017459. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
12 documents · 2 drawing sheets
Minor partition work with general carpentry in apts 14 & 15. No change to use, egress or bulk
On file for this project
5 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY SHORING & BRACING TO STABILIZE BUILDING AS PER PLANS FILED HEREWITH. HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH THE STABILIZATION AT ADJACENT BUILDING, 20 CHRISTOPHER ST (M00864023).
On file for this project
20 documents · 2 drawing sheets
Floor 11p · 1 filing · 12 docs
Mechanical
INSTALLATION OF MECHANICAL SYSTEM IN CONJUNCTION WITH APPLICATION #M08046036 AND M08017459. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
12 documents · 1 drawing sheet
Cellar7p · 5 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
INSTALLATION OF MECHANICAL SYSTEM IN CONJUNCTION WITH APPLICATION #M08046036 AND M08017459. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
12 documents · 1 drawing sheet
INSTALLATION OF PLUMBING SYSTEM FOR 2ND FL APT 14, 15 3RD FL APT12 13 (NO REPLACEMENT NO RELOCATION OF ANY FIXTURES) IN CONJUNCTION WITH APPLICATION# M08046036 AND M08017459. NO CHANGE IN USE EGRESS OR OCCUPANCY.
On file for this project
14 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY SHORING & BRACING TO STABILIZE BUILDING AS PER PLANS FILED HEREWITH. HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH THE STABILIZATION AT ADJACENT BUILDING, 20 CHRISTOPHER ST (M00864023).
On file for this project
20 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Basement3p · 1 filing · 12 docs
DMMechanicalStructural
Repair of half-timber bearing walls, reinforcement of floor joists, replacement of floor joists, repair of the facades and connecting the facades to the wooden floors, reinforce roof structure, repoint brick front facades, repoint and repair masonry chi
On file for this project
12 documents · 3 drawing sheets