← Back
BuildNYC
Miscellaneous two family
18 SHERADEN AVENUE
STATEN ISLAND · BIN 5018753
💬 Discuss this project
1978Year Built
2Stories
B9Building Class
R3-1Zoning
1,280 sfGross Floor Area
2Units
0 Active Violations
Miscellaneous two family · 2,500 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
ElectricalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation4p · 1 filing · 9 docs
Floor 11 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering110/07/2025
Steven R. Savino Architect106/08/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunrun Solar ElectlElectrical203/22/2026
Premier Electrical ContractorsElectrical103/22/2026
Sunrun Installation ServiceGeneral Contractor107/08/2026
Fine MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272110/07/2025
Building Lifecycle
12/05/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01296356-I1
10/10/2025
Permit issued — Solar
S01296356-I1-SL
10/07/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01296356-I1
10/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
12 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service10/10/2025
DOB NOWPlumbingSigned-offFine Mechanical06/26/2020
BISOTISSUEDJVN Restoration Environmental03/17/2020
2 projects · most recent 10/07/2025
General Wiring
FiledStatusContractorScope
10/07/2025CompleteSunrun Solar ElectlGeneral Wiring
08/13/2020CompletePremier Electrical ContractorsGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/01/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/01/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/01/2025Energy Code Compliance InspectionsWalid Abdullaprogress
10/01/2025FinalWalid Abdullaprogress
10/01/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
37 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account