ECB08/02/2017PC-1101.2 FAILURE TO COMPLY W/STORM/RAIN WATER DRAINAGE REQUIREMENT FOR ROOF PAVE AREA OR YARD. ROOF LEADER OR DOWN SPOUT NOT CONNECTED TOANY DRAINAGE SYSTEM.UPPER GUTTER FROM ROOF NOT CONNECTED TO ANY DOWNNothing owed — awaiting certificate of correction
ECB08/02/2017FAILURE TO MAINTAIN BLDG WALLS (OR) APPURTENANCES: OBSERVED AT EXP3 (REAR OF BLDG) EXPOSED BRICKWORK AND MISSING MORTAR EXTENDING ABOUT 3'DOWN FORM ROOF AND APPRX 10'-12'. EXPOSED LENTEL ABOVE UPPER WINDOW ATNothing owed — awaiting certificate of correction
Two family converted from one family · 1,539 sf lot · 1.47 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.