← Back
Two stories - detached, small or mid-size
18 THERESA PLACE
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5015200
💬 Discuss this project
1915Year Built
2.5Stories
A1Building Class
R1-2Zoning
1,624 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 4,000 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
PlumbingCivil
Floor 11p · 1 filing · 9 docs
Basement1p · 1 filing · 9 docs
Sub-Basement1p · 1 filing · 9 docs
Site & exterior1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CPMG CUSTOM HOME BUILDERS203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALFRED V SAULO, ARCHITECT PC307/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VSS CONSULTANTS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CPMG CUSTOM HOME BUILDERSGeneral Contractor403/21/2026
FINE MECHANICAL CORPPlumbing107/08/2026
Building Lifecycle
All (18)Filed (3)Permit Issued (3)Signed Off (2)Violation (2)Inspection (5)Special Inspection (3)
09/28/2022
Signed off — Alteration
application filed to indicate pl fixtures
S00542456-I1
03/04/2022
Signed off — Alteration
application filed to obtain fence permit for the fence installation in conjunction with alt 1 app #: 540189044.
S00501201-I1
11/03/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/12/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/06/2021
Permit issued — Construction Fence
S00501201-I1-FN
09/09/2021
Violation issued (ECB, closed)
Construction
09/09/2021
Violation issued (ECB, closed)
Construction
08/13/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/10/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/20/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/14/2021
Special inspection requirement — Maintenance information
ALFRED SAULO
07/13/2021
Filed — Alteration
application filed to indicate pl fixtures
S00542456-P1
07/13/2021
Permit issued — Plumbing
S00542456-I1-PL
07/13/2021
Special inspection requirement — Maintenance information
ALFRED SAULO
07/09/2021
Filed — Alteration
application filed to indicate pl fixtures
S00542456-I1
05/28/2021
Permit issued — Construction Fence
S00501201-I1-FN
04/12/2021
Filed — Alteration
application filed to obtain fence permit for the fence installation in conjunction with alt 1 app #: 540189044.
S00501201-I1
04/09/2021
Special inspection requirement — Final
ALFRED SAULO
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offCPMG CUSTOM HOME BUILDERS10/06/2021
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP07/13/2021
DOB NOWConstruction FenceSigned-offCPMG CUSTOM HOME BUILDERS05/28/2021
1 project · most recent 06/12/2021
General Wiring
FiledStatusContractorScope
06/12/2021CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/03/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/12/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/13/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/10/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/20/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
07/14/2021Maintenance informationALFRED SAULOenergy_progress
07/13/2021Maintenance informationALFRED SAULOenergy_progress
04/09/2021FinalALFRED SAULOprogress
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026S00501201-I1Request digital key ↗
08/25/2026S00542456-I1Request digital key ↗
08/25/2026S00542456-P1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION6
01/31/2022540189044Open ↗
01/18/2022540189044Open ↗
04/02/2021540189044Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
03/04/2021540189044Open ↗
03/04/2021540189044Open ↗
▸BISWORK PERMIT APPLICATION1
06/02/2021540189044Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/04/2021540189044Open ↗
▸BISZONING DIAGRAM1
04/05/2021540189044Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026S00501201-I1Open ↗
08/25/2026S00542456-I1Open ↗
08/13/2026S00542456-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026S00542456-P1Open ↗
08/24/2026S00501201-I1Open ↗
08/23/2026S00542456-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/02/2021540189044Open ↗
01/29/2021540189044Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/30/2020540189044Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/30/2020540189044Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/30/2020540189044Open ↗
▸Trade Schedules & Equipment1
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/28/2022540189044Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
03/25/2021540189044Open ↗
10/30/2020540189044Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026S00542456-I1Open ↗
08/13/2026S00542456-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/30/2020540189044Open ↗
▸Energy Compliance11
▸BISEXTERIOR LIGHTING POWER1
09/28/2022540189044Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
09/28/2022540189044Open ↗
▸BISINTERIOR LIGHTING POWER1
09/28/2022540189044Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
09/28/2022540189044Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
09/28/2022540189044Open ↗
▸BISLIGHTING IN DWELLING UNITS1
09/28/2022540189044Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/28/2022540189044Open ↗
▸BISLIGHTING CONTROLS1
09/28/2022540189044Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/28/2022540189044Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/30/2020540189044Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00542456-I1Open ↗
▸Inspections & Test Reports10
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
09/28/2022540189044Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
09/28/2022540189044Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
09/28/2022540189044Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
09/09/2022540189044Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/28/2022540189044Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
09/28/2022540189044Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/02/2021540189044Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
09/28/2022540189044Open ↗
▸BISSOIL REPORT1
10/30/2020540189044Open ↗
▸BISMECHANICAL SYSTEMS1
09/28/2022540189044Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/29/2022540189044Open ↗
▸BISFINAL1
09/28/2022540189044Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
10/30/2020540189044Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/28/2022540189044Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION4
09/29/2022540189044Open ↗
10/30/2020540189044Open ↗
10/30/2020540189044Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
10/30/2020540189044Open ↗
▸Other Documents3
▸BISPRELIMINARY1
09/28/2022540189044Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
10/30/2020540189044Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
09/28/2022540189044Open ↗