← Back
Two family brick
18 WILLOUGHBY AVENUE
BROOKLYN · BIN 3058446
💬 Discuss this project
1864Year Built
3Stories
B1Building Class
R6BZoning
3,688 sfGross Floor Area
2Units
Rent Stabilized14 Open Violations ▸FDNY Report ↗
Two family brick · Owner of record: JARJEN TOWNHOUSE LLC · 2,045 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 13 docs
Floor 32p · 2 filings · 17 docs
Floor 2
Floor 1
Cellar3p · 1 filing · 13 docs
Basement1p · 1 filing · 13 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/09/2018$3.9M—18 WILLOUGHBY HOLDINGS LLC → JARJEN TOWNHOUSE LLC$1,049/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MADE ARCHITECTURE PLLC608/17/2026
AUTOMATED DESIGN ENGINEERING, PLLC203/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HENRY MYERS P & H, INCPlumbing407/08/2026
KG SPRINKLER CORPFire Protection207/08/2026
HENRY MYERS P HGeneral Contractor203/22/2026
BENJAMIN BISCHOFFElectrical103/21/2026
MADE LLCGeneral Contractor107/08/2026
H M SPRINKLERPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WAVIC ENGINEERING PLLC1733203/17/2023
MADE ARCHITECTURE PLLC2427102/16/2021
Building Lifecycle
All (48)Filed (8)Permit Issued (5)Signed Off (3)Violation (18)Objection (8)Special Inspection (6)
08/17/2026
Filed — Alteration
Interior renovation of existing two family dwelling. No change to egress, use, or occupancy.
B01425240-I1
07/07/2026
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/01/2026
Special inspection requirement — Final
05/06/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
06/11/2025
Violation issued (HPD, open)
A
11/25/2024
Violation issued (HPD, open)
I
04/12/2024
Violation issued (HPD, open)
A
11/17/2023
Violation issued (HPD, open)
I
06/28/2023
Signed off — Alteration
Install sprinkler system per the plans filed herewith and in conjunction with A1#340767398. The system is hydraulically calculated. There is no change in use occupancy or egress.
B00427609-I1
05/01/2023
Signed off — Alteration
B00403634-I1
05/01/2023
Signed off — Alteration
FILING HEREWITH MODIFICATION OF PLUMBING FIXTURES AS INDICATED ON THE DRAWINGS. THERE IS NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00403628-I1
03/30/2023
Permit issued — Mechanical Systems
B00403634-I1-MS
03/27/2023
Violation issued (HPD, open)
A
03/17/2023
Filed — Alteration
Install sprinkler system per the plans filed herewith and in conjunction with A1#340767398. The system is hydraulically calculated. There is no change in use occupancy or egress.
B00427609-P1
03/17/2023
Special inspection requirement — Sprinkler Systems
DARIUSZ LUCZAK
02/27/2023
Special inspection requirement — Sprinkler Systems
DARIUSZ LUCZAK
02/08/2023
Objection resolved — Addressed
02/06/2023
Filed — Alteration
FILING HEREWITH MODIFICATION OF PLUMBING FIXTURES AS INDICATED ON THE DRAWINGS. THERE IS NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00403628-P4
02/06/2023
Objection raised — Scope
11/04/2022
Violation issued (HPD, open)
I
09/20/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/21/2022
Filed — Alteration
FILING HEREWITH MODIFICATION OF PLUMBING FIXTURES AS INDICATED ON THE DRAWINGS. THERE IS NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00403628-P3
03/02/2022
Violation issued (HPD, open)
A
03/02/2022
Violation issued (HPD, open)
I
02/10/2022
Violation issued (FDNY_NOV, closed)
09/30/2021
Objection resolved — Addressed
09/30/2021
Objection resolved — Addressed
09/30/2021
Objection resolved — Addressed
09/28/2021
Objection raised — Scope
09/28/2021
Objection raised — Inspections
09/28/2021
Objection raised — Other
09/22/2021
Filed — Alteration
FILING HEREWITH MODIFICATION OF PLUMBING FIXTURES AS INDICATED ON THE DRAWINGS. THERE IS NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00403628-P1
08/26/2021
Permit issued — Sprinklers
B00427609-I1-EW-SP
07/07/2021
Permit issued — Plumbing
B00403628-I1-PL
04/13/2021
Permit issued — Sprinklers
B00427609-I1-EW-SP
04/13/2021
Permit issued — Plumbing
B00403628-I1-PL
04/13/2021
Violation issued (HPD, open)
A
04/13/2021
Violation issued (HPD, open)
I
02/16/2021
Filed — Alteration
B00403634-I1
11/23/2020
Filed — Alteration
Install sprinkler system per the plans filed herewith and in conjunction with A1#340767398. The system is hydraulically calculated. There is no change in use occupancy or egress.
B00427609-I1
10/28/2020
Filed — Alteration
FILING HEREWITH MODIFICATION OF PLUMBING FIXTURES AS INDICATED ON THE DRAWINGS. THERE IS NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00403628-I1
10/31/2019
Violation issued (HPD, open)
I
10/22/2018
Violation issued (HPD, open)
I
11/30/2017
Violation issued (HPD, closed)
I
10/14/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBARTONI CAPENTRY CORP03/30/2023
DOB NOWSprinklersSigned-offH M SPRINKLER INC08/26/2021
DOB NOWPlumbingSigned-offHENRY MYERS P & H, INC07/07/2021
DOB NOWSprinklersSigned-offH M SPRINKLER INC04/13/2021
DOB NOWPlumbingSigned-offHENRY MYERS P & H, INC04/13/2021
BIS—ISSUEDMADE LLC02/02/2023
BIS—ISSUEDMADE LLC02/07/2022
BIS—ISSUEDMADE LLC03/31/2021
BISOTISSUEDYES WE DO07/24/2001
1 project · most recent 06/23/2021
General Wiring
FiledStatusContractorScope
06/23/2021CompleteA.DAVINO ELEC'L CONT'G COGeneral Wiring
1 project · most recent 08/17/2026
Wood
FiledStatusContractorScope
08/17/2026——Wood
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
07/07/2026Construction Utilizing CLT or SCL, Type IV—special
07/07/2026Fire-Resistant Penetrations and Joints—special
07/07/2026Fire-Resistance Rated Construction—progress
07/01/2026Final—progress
03/17/2023Sprinkler SystemsDARIUSZ LUCZAKspecial
02/27/2023Sprinkler SystemsDARIUSZ LUCZAKspecial
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00403628-I1Request digital key ↗
09/02/2026B00403628-P3Request digital key ↗
08/15/2026B00403628-P4Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00427609-I1Request digital key ↗
09/02/2026B00427609-P1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/18/2026B01425240-I1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION6
10/17/2023340767398Open ↗
09/26/2023340767398Open ↗
09/20/2023340767398Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLPC Approval/Permit5
08/18/2026B01425240-I1Open ↗
08/13/2026B00403628-P3Open ↗
08/13/2026B00403628-I1Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/25/2022340767398Open ↗
▸BISWORK PERMIT APPLICATION1
03/31/2021340767398Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
11/16/2023340767398Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/16/2023340767398Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/02/2026B00427609-P1Open ↗
09/02/2026B00427609-I1Open ↗
08/18/2026B01425240-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B00427609-P1Open ↗
08/22/2026B00427609-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/01/2020340767398Open ↗
▸Safety & Tenant Protection5
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
11/13/2020340767398Open ↗
11/13/2020340767398Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/22/2021340767398Open ↗
▸BISSTREET TREE CHECKLIST1
11/13/2020340767398Open ↗
▸BISSTREET TREE SIGNOFF1
01/05/2023340767398Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/02/2026B00427609-I1Open ↗
08/13/2026B00403634-I1Open ↗
08/13/2026B00403628-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026B01425240-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/05/2021340767398Open ↗
01/26/2021340767398Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/13/2022340767398Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00403634-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/31/2021340767398Open ↗
01/26/2021340767398Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/13/2022340767398Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/13/2022340767398Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE4
10/17/2023340767398Open ↗
09/26/2023340767398Open ↗
09/20/2023340767398Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS APPROVAL1
02/24/2021340767398Open ↗
▸BISLANDMARKS SIGNOFF1
01/09/2023340767398Open ↗
▸DOB NOWLandmark Approval1
08/13/2026B00403634-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
01/26/2021340767398Open ↗
01/26/2021340767398Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/28/2023340767398Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
03/05/2021340767398Open ↗
11/13/2020340767398Open ↗
▸BISEFILING COVER SHEET1
10/01/2020340767398Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/18/2020340767398Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
11/13/2020340767398Open ↗