18 WILSON AVENUE
BROOKLYN · BIN 3071921
💬 Discuss this project
1899Year Built
2Stories
B2Building Class
R6Zoning
2,500 sfGross Floor Area
2Units
Two family frame · 2,500 sf lot · 1 FAR built · Flood zone X
Locations of Work
Architecture
Penthouse1p · 1 filing · 9 docs
Cellar2p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MTEK403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THOMAS C. TUNG, P.E.101/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH203/21/2026
Building Lifecycle
All (51)Filed (1)Objection (32)Special Inspection (18)
09/11/2026
Objection resolved — Resolved
09/11/2026
Objection resolved — Resolved
09/11/2026
Objection resolved — Resolved
07/07/2025
Special inspection requirement — Fenestration areas
07/07/2025
Special inspection requirement — Lighting controls
07/07/2025
Special inspection requirement — Air barrier - visual inspection
07/07/2025
Special inspection requirement — Fenestration air leakage
07/07/2025
Special inspection requirement — Exterior lighting power
07/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
07/07/2025
Special inspection requirement — Insulation placement and R values
07/07/2025
Special inspection requirement — Interior lighting power
07/07/2025
Special inspection requirement — Air barrier — testing
07/07/2025
Special inspection requirement — Lighting in dwelling units
07/07/2025
Special inspection requirement — Maintenance information
07/07/2025
Special inspection requirement — Metering
07/07/2025
Special inspection requirement — Protection of exposed foundation insulation
03/12/2025
Objection raised — Scope
03/12/2025
Objection resolved — Addressed
02/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/30/2025
Objection raised — Admin
01/30/2025
Objection resolved — Addressed
01/30/2025
Objection raised — Energy
01/30/2025
Objection resolved — Addressed
01/30/2025
Objection raised — Other
01/30/2025
Objection resolved — Addressed
01/30/2025
Objection raised — Cost
01/30/2025
Objection resolved — Addressed
01/30/2025
Objection raised — Scope
01/30/2025
Objection resolved — Addressed
01/30/2025
Objection raised — Other
01/30/2025
Objection raised — Structural
01/30/2025
Objection resolved — Addressed
01/30/2025
Objection raised — Accessibility
01/30/2025
Objection resolved — Addressed
01/30/2025
Objection raised — Other
01/30/2025
Objection resolved — Addressed
01/30/2025
Objection raised — Other
01/30/2025
Objection resolved — Addressed
01/30/2025
Objection raised — Scope
01/30/2025
Objection raised — Scope
01/30/2025
Objection raised — Scope
01/30/2025
Objection resolved — Addressed
01/30/2025
Objection raised — Zoning
01/30/2025
Objection resolved — Addressed
01/30/2025
Objection raised — Other
01/30/2025
Objection resolved — Addressed
01/22/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED VERTICAL AND REAR ENLARGEMENT ON TOP OF THE EXISTING MASONRY FRIST FLOOR. (EXISTING SECOND FLOOR WOOD FRAME TO BE REPLACED WITH NON-COMBUSTIBLE MATERIAL AS PER PLAN.). CONVERT EXISTING 2 DWELLING UNITS INTO 7 DU. OBTAIN A NEW C OF O.
B01167686-I1
01/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/17/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
01/17/2025
Special inspection requirement — Energy Code Compliance Inspections
01/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nothing on file for this building.
1 project · most recent 01/22/2025
FiledStatusContractorScope
01/22/2025——2 scope_items
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
07/07/2025Fenestration areas—energy_progress
07/07/2025Lighting controls—energy_progress
07/07/2025Air barrier - visual inspection—energy_progress
07/07/2025Fenestration air leakage—energy_progress
07/07/2025Exterior lighting power—energy_progress
07/07/2025Fenestration and door U-factor and product ratings—energy_progress
07/07/2025Insulation placement and R values—energy_progress
07/07/2025Interior lighting power—energy_progress
07/07/2025Air barrier — testing —energy_progress
07/07/2025Lighting in dwelling units—energy_progress
07/07/2025Maintenance information—energy_progress
07/07/2025Metering—energy_progress
07/07/2025Protection of exposed foundation insulation—energy_progress
02/27/2025Structural Stability – Alterations of existing buildings—special
01/17/2025Fire-Resistant Penetrations and Joints—special
01/17/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
01/17/2025Energy Code Compliance Inspections—progress
01/17/2025Fire-Resistance Rated Construction—progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01167686-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01167686-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01167686-I1Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial2
08/13/2026B01167686-I1Open ↗
08/13/2026B01167686-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01167686-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01167686-I1Open ↗