← Back
One family attached or semi-detached
18 WOOD COURT
STATEN ISLAND · Arden Heights-Rossville · BIN 5092943
💬 Discuss this project
1986Year Built
2Stories
A5Building Class
R3-2Zoning
1,088 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 1,476 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC102/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272102/12/2024
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
03/15/2024
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00999350-I1
02/16/2024
Permit issued — Solar
S00999350-I1-SL
02/12/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00999350-I1
02/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
02/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
02/01/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
02/01/2024
Special inspection requirement — Final
Walid Abdulla
02/01/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/05/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC02/16/2024
BISOTISSUEDDOUBLE EDGE CONST. INC03/15/2005
1 project · most recent 02/12/2024
FiledStatusContractorScope
02/12/2024CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/01/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
02/01/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
02/01/2024Energy Code Compliance InspectionsWalid Abdullaprogress
02/01/2024FinalWalid Abdullaprogress
02/01/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026S00999350-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026S00999350-I1Open ↗
09/01/2026S00999350-I1Open ↗
09/01/2026S00999350-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S00999350-I1Open ↗
09/01/2026S00999350-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026S00999350-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026S00999350-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S00999350-I1Open ↗