HPD11/16/2017§ 27-2142 ADM CODE - THE PREMISES OR APTS. HAVE BEEN VACATED BY THE DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR THE ENTIRE CELLAR AS-PER VACATE# ( 141162 ) DATED ON NOVEMBER 16TH. 2017.
HPD10/16/2017§ 27-2087 ADM CODE - DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES WHERE ILLEGAL AND PROPERLY SEAL PIPE CONNECTIONS CONSISTING OF WATER CLOSET, WASH BASIN AND SHOWER STALL AT CELLAR
ECB12/02/2017OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDING DEPARTMENT RECORDS. CELLAR USE CHANGED FROM STORAGE AND ORDINARY USE TO AN APARTMENT. PARTITIONS ERECTED WITH KITCHEN AND BATHROOMNothing owed — awaiting certificate of correction
ECB11/22/2016GAS BEING SUPPLIED TO BLDG W/O INSPECTION & CERTIFICATION BY DOB. AT TIME OF INSPECTION 12:20PM I OBSERVED NEW GAS PIPING TO BOILER IN BASEMENT. BOILER WAS ON & IN USE. NO TESTING ON FILE FOR GAS FIRED BOILERNothing owed — awaiting certificate of correction
ECB11/22/2016WORK W/O A PERMIT. AT TIME OF INSPECTION I OBSERVED NEW GAS FIRED BOILER IN BASEMENT W/NEW GAS PIPING. NO PERMIT FOR BOILER INSTALLATION ON FILE W/DOB. PIC TAKEN. TIME OF INSPECTION 12:20PM UTILITY COMPANY CALLNothing owed — awaiting certificate of correction
ECB11/22/2016FAILURE TO MAIMTAIN BLDG IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION 12:20PM I OBSERVED PROHIBITED MATERIALS(UNION,TEE FOR FUTURE CONNECTION)IN GAS ROUGH. LOCATED IN BOILER ROOM. REMEDY: REPAIR &/OR REPLACENothing owed — awaiting certificate of correction
ECB11/22/2016FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTEN. AT TIME OF INSPECTION 12PM I OBSERVED NEW GAS PIPING TO BOILER. NEW BOILER COMPLETE W/WATER & FLUE PIPING. NO PERMIT ON DOB FILE. UTILITY COMPANY CALLED TONothing owed — awaiting certificate of correction
One story - permanent living quarter · 4,000 sf lot · 0.27 FAR built · Flood zone X500