← Back
Two stories - detached, small or mid-size
180-11 TUDOR ROAD
QUEENS · BIN 4155690
💬 Discuss this project
1935Year Built
2Stories
A1Building Class
R1-2Zoning
1,760 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 7,650 sf lot · 0.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof11p · 1 filing · 20 docs
Floor 227p · 1 filing · 20 docs
Floor 126p · 1 filing · 20 docs
Cellar26p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RECORD GROUP503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/23/2024$1.5M—18 TUDOR LLC → Private party$852/sf building
08/25/2021$1.4M—— → —$795/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS411/05/2025
RAS PE CONSULTING ENGINEERS404/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.803/21/2026
GERALD J CALIENDO R A P C803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RECORD GROUP INCGeneral Contractor707/08/2026
IMPACT BUILDERS CORPGeneral Contractor104/09/2026
FOUR POINTS P & H CORPPlumbing107/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323711/05/2025
Building Lifecycle
All (77)Filed (8)Permit Issued (7)Violation (6)Inspection (2)Objection (24)Special Inspection (30)
05/14/2026
Violation issued (ECB, closed)
Construction
12/30/2025
Special inspection requirement — Maintenance information
William Alicea
12/30/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
William Alicea
12/30/2025
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
12/30/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
William Alicea
12/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
William Alicea
12/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
William Alicea
12/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
12/30/2025
Special inspection requirement — Permanent certificate
William Alicea
12/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
William Alicea
12/19/2025
Objection resolved — Addressed
12/07/2025
Objection raised — Zoning
11/05/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Herewith filing this application for Structure for the proposed alteration as per the GC drawings.
Q01151038-P2
11/05/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
William Alicea
11/05/2025
Special inspection requirement — Maintenance information
William Alicea
11/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
William Alicea
11/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
William Alicea
11/05/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
William Alicea
11/05/2025
Special inspection requirement — Permanent certificate
William Alicea
11/05/2025
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
11/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
William Alicea
11/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
10/30/2025
Permit issued — General Construction
Q01151038-I1-GC-CX
10/29/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/30/2025
Permit issued — Plumbing
Q01151038-S5-PL
05/14/2025
Violation issued (ECB, closed)
Unknown
05/09/2025
Objection resolved — Addressed
05/08/2025
Violation issued (ECB, closed)
Unknown
05/08/2025
Violation issued (ECB, closed)
Construction
05/08/2025
Violation issued (ECB, closed)
Construction
05/08/2025
Violation issued (ECB, closed)
Construction
05/08/2025
Objection raised — Cost
04/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
04/28/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
04/28/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
William Alicea
04/23/2025
Objection resolved — Addressed
04/18/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Herewith filing this application for Structure for the proposed alteration as per the GC drawings.
Q01151038-P1
04/16/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
William Alicea
04/16/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
04/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
04/15/2025
Objection resolved — Addressed
04/08/2025
Permit issued — Foundation
Q01151038-S3-FO-EA
04/03/2025
Permit issued — Support of Excavation
Q01151038-S2-SE
04/02/2025
Permit issued — Mechanical Systems
Q01151038-I1-GC-CX
04/02/2025
Permit issued — Construction Fence
Q01151038-S1-FN
04/02/2025
Permit issued — Structural
Q01151038-S4-ST
03/11/2025
Objection resolved — Addressed
03/04/2025
Objection raised — Admin
03/03/2025
Objection raised — Inspections
03/03/2025
Objection raised — Energy
02/27/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Herewith filing this application for Structure for the proposed alteration as per the GC drawings.
Q01151038-S2
02/27/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Herewith filing this application for Structure for the proposed alteration as per the GC drawings.
Q01151038-S3
02/27/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Herewith filing this application for Structure for the proposed alteration as per the GC drawings.
Q01151038-S4
02/27/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
02/27/2025
Special inspection requirement — Structural Steel - Welding
William Alicea
02/27/2025
Special inspection requirement — Structural Steel - High Strength Bolting
William Alicea
02/27/2025
Special inspection requirement — Structural Steel - Details
William Alicea
02/27/2025
Special inspection requirement — Concrete - Cast-In-Place
William Alicea
02/27/2025
Special inspection requirement — Masonry
William Alicea
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRECORD GROUP INC10/30/2025
DOB NOWPlumbingPermit IssuedFOUR POINTS P & H CORP07/30/2025
DOB NOWFoundationPermit IssuedRECORD GROUP INC04/08/2025
DOB NOWSupport of ExcavationPermit IssuedRECORD GROUP INC04/03/2025
DOB NOWMechanical SystemsPermit IssuedRECORD GROUP INC04/02/2025
DOB NOWConstruction FencePermit IssuedIMPACT BUILDERS CORP04/02/2025
DOB NOWStructuralPermit IssuedRECORD GROUP INC04/02/2025
1 project · most recent 11/05/2025
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/05/2025Permit IssuedRECORD GROUP INCHeating Systems, Ventilation Systems
Cooling
Mitsubishi Electric M4H36W06060615-B 36,000 BTU ×3
Heating
Mitsubishi Electric M4H36W06060615-B 36,000 BTU ×3
Ventilation
Mitsubishi Electric M4H36W06060615-B 38,000 BTU ×3
1 project · most recent 11/05/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/05/2025Permit IssuedFOUR POINTS P & H CORPGas, Storm, Water/Sanitary
1 project · most recent 03/25/2026
General Wiring
FiledStatusContractorScope
03/25/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
1 project · most recent 11/05/2025
Steel
FiledStatusContractorScope
11/05/2025Permit IssuedRECORD GROUP INCSteel
1 project · most recent 11/05/2025
Fence
FiledStatusContractorScope
11/05/2025Permit IssuedRECORD GROUP INCFence
1 project · most recent 11/05/2025
Earthwork
FiledStatusContractorScope
11/05/2025Permit IssuedRECORD GROUP INCEarthwork
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/29/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/07/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
12/30/2025HVAC-R and service water heating equipmentWilliam Aliceaenergy_progress
12/30/2025HVAC-R and service water piping design and insulationWilliam Aliceaenergy_progress
12/30/2025HVAC-R and service water heating system controlsWilliam Aliceaenergy_progress
12/30/2025Permanent certificateWilliam Aliceaenergy_progress
12/30/2025Maintenance informationWilliam Aliceaenergy_progress
12/30/2025Energy Code Compliance InspectionsWilliam Aliceaprogress
12/30/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWilliam Aliceaspecial
12/30/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
12/30/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesWilliam Aliceaspecial
11/05/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
11/05/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWilliam Aliceaspecial
11/05/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesWilliam Aliceaspecial
11/05/2025Energy Code Compliance InspectionsWilliam Aliceaprogress
11/05/2025HVAC-R and service water heating system controlsWilliam Aliceaenergy_progress
11/05/2025Maintenance informationWilliam Aliceaenergy_progress
11/05/2025HVAC-R and service water heating equipmentWilliam Aliceaenergy_progress
11/05/2025HVAC-R and service water piping design and insulationWilliam Aliceaenergy_progress
11/05/2025Permanent certificateWilliam Aliceaenergy_progress
04/28/2025Excavations - Sheeting, Shoring, and BracingWilliam Aliceaspecial
04/28/2025Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
04/28/2025Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
04/16/2025Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
04/16/2025Excavations - Sheeting, Shoring, and BracingWilliam Aliceaspecial
04/16/2025Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
02/27/2025Structural Steel - WeldingWilliam Aliceaspecial
Latest 25 of 67.
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/20/2026Q01151038-S1Request digital key ↗
08/20/2026Q01151038-S4Request digital key ↗
08/20/2026Q01151038-S3Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01151038-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01151038-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01151038-I1Open ↗
▸Seals & Professional Certifications30
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026Q01151038-S5Open ↗
09/01/2026Q01151038-S5Open ↗
08/28/2026Q01151038-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/20/2026Q01151038-S4Open ↗
08/20/2026Q01151038-S3Open ↗
08/20/2026Q01151038-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026Q01151038-S5Open ↗
09/01/2026Q01151038-S5Open ↗
08/28/2026Q01151038-P2Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/20/2026Q01151038-S4Open ↗
08/20/2026Q01151038-S3Open ↗
08/20/2026Q01151038-S2Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT4
08/13/2026Q01151038-S3Open ↗
08/13/2026Q01151038-I1Open ↗
08/13/2026Q01151038-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026Q01151038-S2Open ↗
08/13/2026Q01151038-S3Open ↗
08/13/2026Q01151038-I1Open ↗
▸Other Documents6
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q01151038-S3Open ↗
08/13/2026Q01151038-S2Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01151038-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01151038-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/20/2026Q01151038-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q01151038-S4Open ↗