← Back
Public elementary, junior or senior high
P.S. 282 Park Slope
180 6 AVENUE · Park Slope · BIN 3019597
💬 Discuss this project
1931Year Built
3Stories
W1Building Class
R6BZoning
156,180 sfGross Floor Area
1Units
LL97 Covered28 Open Violations 5 unresolved · 23 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 70,000 sf lot · 2.23 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof12p · 1 filing · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 32p · 1 filing · 20 docs
Floor 2
Floor 12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY2807/08/2026
NYC DEPARTMENT OF PARKS AND RECREATION103/22/2026
NYC DOE 0103/22/2026
DEPARTMENT OF EDUCATION703/22/2026
DOE 0401003/22/2026
D.O.E. P.S.282 0403/22/2026
DEPT OF EDUCATION PS2821003/22/2026
D.O.E. P.S. 282 PARK SLOP203/22/2026
PS 282 (K282) DOE2603/22/2026
PS 282 DOE 0303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KERI ENGINEERING, P.C.311/26/2025
MASSA MULTIMEDIA ARCHITECTS108/20/2025
NYMS CONSULTING, LLC409/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARIC PLUMBING & HEATINGGeneral Contractor2707/08/2026
FRANCIS RICHARDSElectrical503/21/2026
NAUM VAYNERMANElectrical203/21/2026
CHARAN ELEC'L ENTERP'S INElectrical203/22/2026
GIOVANNI DITURIElectrical103/21/2026
STEVE EOElectrical103/21/2026
FALCON ELECL CONTRG COR 002408General Contractor103/22/2026
JOSEPH MANGIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FUTURE TECH CONSULTANTS O589209/23/2021
Building Lifecycle
All (113)Filed (8)Permit Issued (19)Violation (60)Inspection (3)Objection (8)Special Inspection (15)
04/09/2026
Violation issued (ECB, open)
Construction
04/09/2026
Violation issued (ECB, open)
Construction
04/09/2026
Violation issued (ECB, open)
Construction
04/09/2026
Violation issued (ECB, open)
Construction
04/09/2026
Violation issued (ECB, open)
Construction
02/18/2026
Violation issued (FDNY_NOV, closed)
02/18/2026
Violation issued (FDNY_NOV, closed)
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/05/2025
Special inspection requirement — Masonry
12/05/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
12/05/2025
Special inspection requirement — Post-installed Anchors
12/03/2025
Objection raised — Other
11/26/2025
Filed — Alteration
Replacement of rooftop exhaust fan units and reinstallation of existing roof ventilator and AC condenser unit (ACCU) on 24 high curbs ,including refrigerant handling and pipe portal installation. No change in use, egress or occupancy with this filing.
B01267766-S3
11/24/2025
Objection resolved — Addressed
11/24/2025
Objection resolved — Addressed
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/08/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
08/28/2025
Objection raised — Other
08/28/2025
Objection raised — Other
08/27/2025
Objection raised — Other
08/25/2025
Filed — Alteration
Replacement of rooftop exhaust fan units and reinstallation of existing roof ventilator and AC condenser unit (ACCU) on 24 high curbs ,including refrigerant handling and pipe portal installation. No change in use, egress or occupancy with this filing.
B01267766-S1
08/22/2025
Filed — Alteration
Replacement of rooftop exhaust fan units and reinstallation of existing roof ventilator and AC condenser unit (ACCU) on 24 high curbs ,including refrigerant handling and pipe portal installation. No change in use, egress or occupancy with this filing.
B01267766-S2
08/20/2025
Filed — Alteration
Replacement of rooftop exhaust fan units and reinstallation of existing roof ventilator and AC condenser unit (ACCU) on 24 high curbs ,including refrigerant handling and pipe portal installation. No change in use, egress or occupancy with this filing.
B01267766-I1
08/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/18/2025
Special inspection requirement — Post-installed Anchors
08/13/2025
Special inspection requirement — Final
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/13/2025
Special inspection requirement — Mechanical Systems
07/21/2025
Violation issued (FDNY_ORDER, closed)
05/22/2025
Violation issued (ECB, open)
Construction
05/22/2025
Violation issued (ECB, open)
Construction
04/22/2025
Violation issued (ECB, open)
Construction
03/10/2025
Permit issued — Construction Fence
B00584062-I1-FN
03/10/2025
Permit issued — Sidewalk Shed
B00584062-S1-SH
03/10/2025
Permit issued — Mechanical Systems
B00584062-S3-MS
03/06/2025
Permit issued — Sidewalk Shed
B00584062-S1-SH
03/06/2025
Permit issued — Construction Fence
B00584062-I1-FN
03/06/2025
Permit issued — Mechanical Systems
B00584062-S3-MS
01/10/2025
Violation issued (FDNY_ORDER, closed)
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/09/2024
Permit issued — Sidewalk Shed
B00584062-S1-SH
08/09/2024
Permit issued — Mechanical Systems
B00584062-S3-MS
08/09/2024
Permit issued — Construction Fence
B00584062-I1-FN
07/02/2024
Violation issued (ECB, open)
Construction
07/02/2024
Violation issued (ECB, open)
Construction
07/02/2024
Violation issued (ECB, closed)
Construction
03/27/2024
Violation issued (FDNY_NOV, closed)
02/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/20/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/15/2023
Permit issued — Sidewalk Shed
B00584062-S1-SH
09/12/2023
Permit issued — Construction Fence
B00584062-I1-FN
09/12/2023
Permit issued — Mechanical Systems
B00584062-S3-MS
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/07/2023
Violation issued (ECB, open)
Construction
03/07/2023
Violation issued (ECB, closed)
Construction
03/07/2023
Violation issued (ECB, open)
Construction
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING03/10/2025
DOB NOWSidewalk ShedPermit IssuedMARIC PLUMBING & HEATING03/10/2025
DOB NOWMechanical SystemsPermit IssuedMARIC PLUMBING & HEATING03/10/2025
DOB NOWSidewalk ShedPermit IssuedMARIC PLUMBING & HEATING03/06/2025
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING03/06/2025
DOB NOWMechanical SystemsPermit IssuedMARIC PLUMBING & HEATING03/06/2025
DOB NOWSidewalk ShedPermit IssuedMARIC PLUMBING & HEATING08/09/2024
DOB NOWMechanical SystemsPermit IssuedMARIC PLUMBING & HEATING08/09/2024
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING08/09/2024
DOB NOWSidewalk ShedPermit IssuedMARIC PLUMBING & HEATING09/15/2023
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING09/12/2023
DOB NOWMechanical SystemsPermit IssuedMARIC PLUMBING & HEATING09/12/2023
DOB NOWSidewalk ShedPermit IssuedMARIC PLUMBING & HEATING09/28/2022
DOB NOWMechanical SystemsPermit IssuedMARIC PLUMBING & HEATING09/26/2022
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING09/26/2022
DOB NOWBoiler EquipmentSigned-offMARIC PLBG & HTG INC10/14/2021
DOB NOWMechanical SystemsPermit IssuedMARIC PLUMBING & HEATING10/13/2021
DOB NOWSidewalk ShedPermit IssuedMARIC PLUMBING & HEATING10/08/2021
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING10/05/2021
BISMHISSUEDMARIC PLUMBING & HEATING03/17/2026
BISPLISSUEDMARIC PLBG & HTG INC03/17/2026
BISOTISSUEDMARIC PLUMBING & HEATING03/17/2026
BISOTISSUEDMARIC PLUMBING & HEATING03/17/2026
BISOTISSUEDMARIC PLUMBING & HEATING03/17/2026
BISOTISSUEDMARIC PLUMBING & HEATING08/09/2024
BISPLISSUEDMARIC PLBG & HTG INC08/09/2024
BISOTISSUEDMARIC PLUMBING & HEATING08/09/2024
BISOTISSUEDMARIC PLUMBING & HEATING08/09/2024
BISFBISSUEDMARIC PLBG & HTG INC08/09/2024
BISBLISSUEDMARIC PLBG & HTG INC08/09/2024
BISFBISSUEDMARIC PLBG & HTG INC08/15/2023
BISOTISSUEDMARIC PLUMBING & HEATING08/15/2023
BISPLISSUEDMARIC PLBG & HTG INC08/15/2023
BISBLISSUEDMARIC PLBG & HTG INC08/15/2023
BISOTISSUEDMARIC PLUMBING & HEATING08/15/2023
BISOTISSUEDMARIC PLUMBING & HEATING08/15/2023
BISFBISSUEDMARIC PLBG & HTG INC08/16/2022
BISMHISSUEDMARIC PLUMBING & HEATING08/16/2022
BISOTISSUEDMARIC PLUMBING & HEATING08/16/2022
BISOTISSUEDMARIC PLUMBING & HEATING08/16/2022
+ 21 more permits on file
1 project · most recent 11/26/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/26/2025——Ventilation Systems
Ventilation
Loren Cook 100C17DH(VF) 300 CFM · Exhaust Fan ×1
165CB 1,200 CFM · Exhaust Fan ×1
245C6B 3,470 CFM · Exhaust Fan ×1
245C7B 3,775 CFM · Exhaust Fan ×1
300C7B 5,050 CFM · Exhaust Fan ×1
365C8B 6,325 CFM · Exhaust Fan ×1
365C9B 7,800 CFM · Exhaust Fan ×1
1 project · most recent 11/26/2025
Storm
FiledStatusContractorScope
11/26/2025——Storm
12 projects · most recent 05/06/2026
General Wiring
FiledStatusContractorScope
05/06/2026CompleteLUNA NYC ELECTRIC CORPGeneral Wiring
04/17/2024CompleteFALCON ELEC'L CONTR'G CORGeneral Wiring
10/22/2023CompleteCORE ELECTRIC MEP INDS LLGeneral Wiring
10/28/2022CompleteCHARAN ELEC'L ENTERP'S IN—
01/13/2022CompleteFALCON ELEC'L CONTR'G COR—
10/07/2021CompleteFALCON ELEC'L CONTR'G COR—
09/24/2021CompleteABM ELECTRIC, INCGeneral Wiring
08/16/2019CompleteCHARAN ELEC'L ENTERP'S IN—
07/14/2019CompleteJK ELECTRICAL INCGeneral Wiring
03/15/2019CompleteCHARAN ELEC'L ENTERP'S IN—
05/18/2018CompleteCHARAN ELEC'L ENTERP'S IN—
02/26/2018CompleteLASER ELEC'L CONSTR'G INC—
1 project · most recent 09/23/2021
Fence Sidewalk Shed
FiledStatusContractorScope
09/23/2021Permit IssuedMARIC PLUMBING & HEATINGFence, Sidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/22/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/20/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/02/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
12/05/2025Masonry—special
12/05/2025Wall Panels, Curtain Walls, and Veneers—special
12/05/2025Post-installed Anchors—special
10/08/2025Fuel-Oil Storage and Fuel-Oil Piping Systems—special
08/18/2025Fire-Resistant Penetrations and Joints—special
08/18/2025Post-installed Anchors—special
08/13/2025Final—progress
08/13/2025Fire-Resistant Penetrations and Joints—special
08/13/2025Mechanical Systems—special
09/01/2021HVAC-R and service water piping design and insulationMichael Marcheseenergy_progress
09/01/2021FinalMichael Marcheseprogress
09/01/2021Post-installed AnchorsNoel Tolentinospecial
09/01/2021Chimneys and ventsNoel Tolentinospecial
09/01/2021Mechanical SystemsNoel Tolentinospecial
09/01/2021Fuel-Oil Storage and Fuel-Oil Piping SystemsNoel Tolentinospecial
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/01/2026B00584062-S3Request digital key ↗
09/01/2026B00584062-I1Request digital key ↗
09/01/2026B00584062-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026B00584062-I1Open ↗
09/01/2026B00584062-S1Open ↗
09/01/2026B00584062-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B00584062-S2Open ↗
08/25/2026B00584062-S3Open ↗
08/25/2026B00584062-S3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B00584062-S3Open ↗
08/25/2026B00584062-S3Open ↗
▸Safety & Tenant Protection2
▸DOB NOWNYCSCA - Approved Site Safety Plans2
08/13/2026B00584062-S1Open ↗
08/13/2026B00584062-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/01/2026B00584062-S3Open ↗
▸Approvals, Objections & Sign-offs16
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/15/2026B01267766-S3Open ↗
08/15/2026B01267766-S1Open ↗
08/15/2026B01267766-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)8
08/13/2026B01267766-I1Open ↗
08/13/2026B00584062-S1Open ↗
08/13/2026B01267766-S2Open ↗
Showing 3 of 8 on file for this type
▸Other Documents10
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal8
08/13/2026B00584062-S1Open ↗
08/13/2026B00584062-I1Open ↗
08/13/2026B00584062-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWNYCSCA Exhibit 21
08/13/2026B00584062-S2Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026B01267766-I1Open ↗