← Back
Elevator apt, fireproof without stores
Starrett City
180 BETHEL LOOP · BIN 3343583
💬 Discuss this project
1970Year Built
20Stories
D3Building Class
R5Zoning
1,688,760 sfGross Floor Area
2,926Units
LL97 CoveredRent Stabilized27 Open Violations 23 unresolved · 4 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: BSC HOUSING COMPANY, INC. · 1,073,857 sf lot · 1.57 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BSC HOUSING COMPANY803/22/2026
GRENDAIER REALTY CORP103/22/2026
GRENADIER REALTY803/22/2026
GREMADIER REALTY203/22/2026
GENADIER REALTY103/22/2026
STARRETT CITY ASSOCS.203/22/2026
GRENADIRE REALTY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION403/21/2026
THERESA VOLTAGGIO103/21/2026
CORE CONSULTANTS NYC103/21/2026
NEW YORK ENGINEERING ASSOCIATES P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.B. DEMOLITION, INCGeneral Contractor303/21/2026
PROTO RESTORATION CONSTRUCTIONGeneral Contractor303/21/2026
ADVANCED PLUMBING MECHGeneral Contractor203/22/2026
ASANKOMAH, KOFIElectrical103/21/2026
PNA CONTRACTING CORPGeneral Contractor107/08/2026
ADVANCED PLUMBING MECHPlumbing107/08/2026
SPIELER, RONALDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851110/18/2024
SANDEEP GUNNALA ENGINEERI8482109/13/2023
COWLEY ENGINEERING186104/03/2021
Building Lifecycle
All (93)Filed (5)Permit Issued (4)Signed Off (4)Facade (FISP) (12)Violation (60)Inspection (3)Special Inspection (5)
06/30/2026
Violation issued (HPD, closed)
C
06/21/2026
Violation issued (HPD, closed)
C
07/28/2025
Signed off — Alteration
REMOVAL OF EXISTING CONCRETE SIDEWALK AND ASPHALT DRIVEWAY, POURING OF NEW CONCRETE WALKWAY & ASPHALT DRIVEWAY, INSTALLATION OF NEW CURB, REINSTALLEXISTING LIGHTING ON NEW CONCRETE FOOTING, INSTALL GUARDRAIL, PERMEABLE PAVERS, BOLLARDS
B00921807-I1
05/08/2025
Permit issued — General Construction
B00921807-I1-GC
01/30/2025
Signed off — Alteration
REGISTER GAS DRYERS (BUILDING NO. D2).
B01094806-I1
12/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/05/2024
Violation issued (HPD, closed)
C
12/05/2024
Violation issued (HPD, closed)
C
11/18/2024
Permit issued — Plumbing
B01094806-I1-PL
10/18/2024
Filed — Alteration
REGISTER GAS DRYERS (BUILDING NO. D2).
B01094806-I1
08/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2023
Violation issued (HPD, closed)
C
11/08/2023
Violation issued (HPD, closed)
C
10/09/2023
Violation issued (HPD, closed)
A
10/09/2023
Violation issued (HPD, closed)
B
10/09/2023
Violation issued (HPD, closed)
B
09/13/2023
Filed — Alteration
REMOVAL OF EXISTING CONCRETE SIDEWALK AND ASPHALT DRIVEWAY, POURING OF NEW CONCRETE WALKWAY & ASPHALT DRIVEWAY, INSTALLATION OF NEW CURB, REINSTALLEXISTING LIGHTING ON NEW CONCRETE FOOTING, INSTALL GUARDRAIL, PERMEABLE PAVERS, BOLLARDS
B00921807-I1
09/06/2023
Special inspection requirement — Tenant Protection Plan Compliance
Sandeep Gunnala
08/29/2023
Special inspection requirement — Concrete - Cast-In-Place
Sandeep Gunnala
08/29/2023
Special inspection requirement — Post-installed Anchors
Sandeep Gunnala
08/18/2023
Special inspection requirement — Final
Sandeep Gunnala
05/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/14/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00501068-I1
06/06/2022
Cycle 9 facade report submitted
06/06/2022
Cycle 9 facade report signed — SAFE
04/12/2022
Cycle 9 facade inspection completed
12/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/12/2021
Violation issued (HPD, closed)
B
12/12/2021
Violation issued (HPD, closed)
A
12/12/2021
Violation issued (HPD, closed)
B
12/12/2021
Violation issued (HPD, closed)
C
12/12/2021
Violation issued (HPD, closed)
C
12/12/2021
Violation issued (HPD, closed)
C
12/12/2021
Violation issued (HPD, closed)
B
12/12/2021
Violation issued (HPD, closed)
B
12/12/2021
Violation issued (HPD, closed)
B
12/12/2021
Violation issued (HPD, closed)
B
12/12/2021
Violation issued (HPD, closed)
C
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/26/2021
Violation issued (HPD, closed)
B
10/26/2021
Violation issued (HPD, closed)
B
10/26/2021
Violation issued (HPD, closed)
B
10/19/2021
Violation issued (HPD, closed)
B
10/19/2021
Violation issued (HPD, closed)
C
10/13/2021
Violation issued (HPD, closed)
A
10/13/2021
Violation issued (HPD, closed)
B
10/13/2021
Violation issued (HPD, closed)
C
10/13/2021
Violation issued (HPD, closed)
C
09/02/2021
Signed off — Alteration
B00494922-I1
06/30/2021
Special inspection requirement — Final
Paul Perdek
06/25/2021
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00501068-P1
06/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/12/2021
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00501068-I1
05/12/2021
Permit issued — Sidewalk Shed
B00501068-I1-SH
05/07/2021
Permit issued — General Construction
B00494922-I1-GC
04/15/2021
Violation issued (HPD, closed)
A
04/08/2021
Violation issued (ECB, open)
Elevators
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offD.B. DEMOLITION, INC05/08/2025
DOB NOWPlumbingSigned-offADVANCED PLUMBING MECH11/18/2024
DOB NOWSidewalk ShedSigned-offPROTO RESTORATION CONSTRU05/12/2021
DOB NOWGeneral ConstructionSigned-offPNA CONTRACTING CORP05/07/2021
BISOTISSUEDALLSTATE RESTORATION CORP.03/21/2012
BISEQISSUEDROCK SCAFFOLDING CORP03/19/2012
BISOTISSUEDNJK CONTRACTING CORP04/17/2002
BISOTISSUEDNJK CONTRACTING CORP11/01/2001
BISOTISSUEDNJK CONTR INC03/20/2000
1 project · most recent 05/19/2021
FiledStatusContractorScope
05/19/2021Permit IssuedTOP SHELF ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/06/2023Tenant Protection Plan ComplianceSandeep Gunnalaspecial
08/29/2023Concrete - Cast-In-PlaceSandeep Gunnalaspecial
08/29/2023Post-installed AnchorsSandeep Gunnalaspecial
08/18/2023FinalSandeep Gunnalaprogress
06/30/2021FinalPaul Perdekprogress
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00494922-I1Request digital key ↗
09/01/2026B00501068-I1Request digital key ↗
09/01/2026B00501068-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
03/22/2012320438013Open ↗
09/02/2011320341073Open ↗
12/01/2009320085180Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
03/22/2012320438013Open ↗
03/22/2012320341073Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00494922-I1Open ↗
09/01/2026B00501068-I1Open ↗
09/01/2026B00501068-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
05/24/2012320341073Open ↗
03/22/2012320438013Open ↗
09/02/2011320341073Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026B00501068-I1Open ↗
08/22/2026B00921807-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/22/2012320438013Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/22/2012320438013Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026B00921807-I1Open ↗
▸Environmental & Asbestos3
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/02/2011320341073Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/19/2009320085180Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/01/2026B00494922-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY1
10/26/2011320341073Open ↗
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
09/01/2026B00494922-I1Open ↗
09/01/2026B00501068-I1Open ↗
09/01/2026B00501068-P1Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
03/22/2012320438013Open ↗
07/29/2011320341073Open ↗
10/19/2009320085180Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST1
05/09/2014320438013Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/09/2014320438013Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/24/2012320341073Open ↗
09/02/2011320341073Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
03/22/2012320438013Open ↗
09/02/2011320341073Open ↗
10/19/2009320085180Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
12/10/2009320085180Open ↗