180 BURGHER AVENUE
STATEN ISLAND · BIN 5172198
💬 Discuss this project
2023Year Built
2Stories
P5Building Class
R3XZoning
17,221 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Community center · 16,152 sf lot · 1.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMAS Muslim American Society, Mas Statenisland Center +143p · 4 filings · 20 docs
BulkheadMuslim American Society - Staten Island Center1p · 1 filing · 5 docs
Floor 2MAS Muslim American Society, Mas Statenisland Center +143p · 4 filings · 20 docs
Floor 1MAS Muslim American Society, Mas Statenisland Center +149p · 9 filings · 20 docs
CellarMAS Muslim American Society, Mas Statenisland Center38p · 5 filings · 20 docs
Sub-BasementGas line installation to HVAC unit1p · 1 filing · 4 docs
Site & exteriorMAS Muslim American Society55p · 7 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Epac Building Consulting2403/21/2026
Mab Consulting Services203/21/2026
Green Studio403/21/2026
HRF Services203/21/2026
S M Expediting1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HM Build and UpliftScaffold704/09/2026
HM Build and UpliftGeneral Contractor607/08/2026
Ace Group NYScaffold404/09/2026
Katan P & HPlumbing309/24/2026
AJ Mechanical Collectivesspecialty_contractor203/21/2026
A + SprinklerFire Protection206/28/2026
Perciballi IndustriesGeneral Contractor203/21/2026
We R DecorGeneral Contractor104/09/2026
Titan ContractingGeneral Contractor107/08/2026
SNB Electrical ContngElectrical103/22/2026
Triangle Enterprise NYC IScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins1803908/21/2026
Geiger Engineering689104/30/2024
TL Engineering1222102/01/2020
Building Lifecycle
All (176)Filed (25)Permit Issued (23)Signed Off (7)Violation (9)Inspection (2)Objection (80)Special Inspection (30)
09/23/2026
Permit issued — Plumbing
S01117546-I1-PL
09/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/21/2026
Filed — Alteration
INSTALLATION OF NEW HVAC UNITS AND DUCT WORKS FOR PHASE 2 PORTION IN CONJUNCTION WITH NB# 510115858.
S01202386-P2
07/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
07/31/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
07/31/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
07/31/2026
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
07/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
07/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
07/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
07/30/2026
Special inspection requirement — Shutoff dampers
SAMI HAJJAR P.E
07/30/2026
Special inspection requirement — Smoke Control Systems Testing
SAMI HAJJAR P.E
07/30/2026
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
07/30/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
07/30/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
07/30/2026
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
07/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
07/30/2026
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
07/23/2026
Objection resolved — Addressed
07/21/2026
Objection raised — Other
07/13/2026
Filed — Alteration
File plumbing work for phase 2 construction to extend the building.
S01117546-P1
04/16/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
04/16/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
04/16/2026
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
04/16/2026
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
04/16/2026
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
04/16/2026
Special inspection requirement — Smoke Control Systems Testing
SAMI HAJJAR P.E
04/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
04/16/2026
Special inspection requirement — Shutoff dampers
SAMI HAJJAR P.E
04/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
04/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
04/09/2026
Objection resolved — Addressed
04/09/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
04/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
04/09/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
04/09/2026
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
04/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
03/23/2026
Signed off — Alteration
Temporary Construction fence for as shown on plans for Support of Excavation & construction.
S01089811-I1
03/10/2026
Objection raised — Cost
03/03/2026
Filed — Alteration
INSTALLATION OF NEW HVAC UNITS AND DUCT WORKS FOR PHASE 2 PORTION IN CONJUNCTION WITH NB# 510115858.
S01202386-P1
02/12/2026
Filed — Alteration
install sprinkler and standpipe for phase 2 building in conjunction with NB# 510115858.
S01202376-P1
01/29/2026
Signed off — Alteration
S00806172-I1
01/08/2026
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S01160104-I1
01/08/2026
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
S01208114-I1
12/23/2025
Signed off — Alteration
S00271852-I1
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
11/25/2025
Objection resolved — Addressed
11/21/2025
Violation issued (ECB, closed)
Construction
11/21/2025
Violation issued (ECB, closed)
Construction
10/24/2025
Violation issued (ECB, closed)
Construction
10/11/2025
Violation issued (ECB, closed)
Unknown
10/08/2025
Objection raised — Scope
Latest 60 of 176 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedKatan P & H09/23/2026
DOB NOWSidewalk ShedSigned-offHM Build Uplift09/24/2025
DOB NOWConstruction FenceSigned-offHM Build Uplift09/23/2025
DOB NOWMechanical SystemsPermit IssuedAJ Mechanical Collectives09/18/2025
DOB NOWMechanical SystemsPermit IssuedHM Build Uplift09/05/2025
DOB NOWSprinklersSigned-offA + Sprinkler07/08/2025
DOB NOWStandpipePermit IssuedA + Sprinkler07/08/2025
DOB NOWPlumbingPermit IssuedKatan P & H05/14/2025
DOB NOWSupported ScaffoldSigned-offAce Group NY05/07/2025
DOB NOWSidewalk ShedSigned-offAce Group NY05/07/2025
DOB NOWStructuralPermit IssuedHM Build Uplift01/06/2025
DOB NOWSupport of ExcavationSigned-offHM Build Uplift12/04/2024
DOB NOWEarth WorkPermit IssuedHM Build Uplift10/29/2024
DOB NOWSupported ScaffoldSigned-offHM Build Uplift10/04/2024
DOB NOWSupport of ExcavationSigned-offHM Build Uplift09/05/2024
DOB NOWConstruction FenceSigned-offHM Build Uplift09/05/2024
DOB NOWFull DemolitionSigned-offPerciballi Industries06/28/2024
DOB NOWConstruction FenceSigned-offHM Build Uplift06/04/2024
DOB NOWSidewalk ShedSigned-offHM Build Uplift03/05/2024
DOB NOWSupported ScaffoldSigned-offTriangle Enterprise NYC I01/31/2023
DOB NOWGeneral ConstructionPermit IssuedTitan Contracting04/09/2021
DOB NOWMechanical SystemsSigned-offWe R Decor08/25/2020
DOB NOWPlumbingPermit IssuedKatan P & H08/10/2020
BIS—ISSUEDHM Build and Uplift09/02/2025
BIS—ISSUEDHM Build and Uplift07/14/2025
BIS—ISSUEDHM Build and Uplift04/25/2025
BIS—ISSUEDHM Build and Uplift03/05/2024
BIS—ISSUEDHM Build and Uplift06/16/2023
BIS—ISSUEDTitan Contracting03/02/2023
BIS—ISSUEDAK Premier Contracting08/03/2022
BIS—ISSUEDAK Premier Contracting01/24/2022
1 project · most recent 08/21/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/21/2026Permit IssuedAJ Mechanical CollectivesHeating and Air Conditioning Systems
Heat / Cool
Captiveaire CAS-HVAC4-I.400-30-25T 8,000 CFM · Rooftop Unit ×2
CAS-HVAC4-I.500-36-30T 9,600 CFM · Rooftop Unit ×2
Mitsubishi Electric MXZ-SM48NAM2-U1 48,000 BTU · Heat Pump Outdoor ×2
2 projects · most recent 02/12/2026
FiledStatusContractorScope
02/12/2026Signed-offA + Sprinkler—
03/18/2025——132 heads, 3 outlets
2 projects · most recent 07/13/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/13/2026Permit IssuedKatan P & HGas, Storm, Water/Sanitary
02/01/2020Permit IssuedKatan P & HGas
5 projects · most recent 05/29/2025
General Wiring
FiledStatusContractorScope
05/29/2025CompleteSeong Jin ElectricGeneral Wiring
11/03/2021CompleteSNB Electrical ContngGeneral Wiring
09/27/2020CompleteInara ElectricGeneral Wiring
09/02/2019CompleteInara Electric1 meters, 1 new_meters
10/05/2018CompleteApex Electric—
1 project · most recent 09/26/2024
FiledStatusContractorScope
09/26/2024Permit IssuedHM Build and Uplift1 scope_items
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
07/31/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
07/31/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
07/31/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
07/31/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
07/31/2026Post-installed AnchorsSAMI HAJJAR P.Especial
07/30/2026Smoke Control Systems TestingSAMI HAJJAR P.Especial
07/30/2026Post-installed AnchorsSAMI HAJJAR P.Especial
07/30/2026Mechanical SystemsSAMI HAJJAR P.Especial
07/30/2026Heating SystemsSAMI HAJJAR P.Especial
07/30/2026Shutoff dampersSAMI HAJJAR P.Eenergy_progress
07/30/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
07/30/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
07/30/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
07/30/2026FinalSAMI HAJJAR P.Eprogress
07/30/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
04/16/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
04/16/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
04/16/2026Shutoff dampersSAMI HAJJAR P.Eenergy_progress
04/16/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
04/16/2026Mechanical SystemsSAMI HAJJAR P.Especial
04/16/2026Heating SystemsSAMI HAJJAR P.Especial
04/16/2026Post-installed AnchorsSAMI HAJJAR P.Especial
04/16/2026FinalSAMI HAJJAR P.Eprogress
04/16/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
04/16/2026Smoke Control Systems TestingSAMI HAJJAR P.Especial
Latest 25 of 67.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
MAS Muslim American SocietyReligiousCellar, Floors 1, 2, Roof
Project S01202376 Alteration · Permit Entire · 04/02/2025
Project S01114249 Alteration · Permit Entire · 09/26/2024
Project S01117546 Alteration · Permit Entire · 09/26/2024
Mas Statenisland CenterReligiousCellar, Floors 1, 2, Roof
Project S01202386 Alteration · Permit Entire · 04/02/2025
Muslim American Society - Staten Island CenterReligiousFloors 1, 2, Roof
Project S01117547 Alteration · Permit Entire · 09/30/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 279 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch21
08/25/2026S00496612-I1Request digital key ↗
08/23/2026S00806172-I1Request digital key ↗
08/21/2026S01031266-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/18/2026S01256939-I1Request digital key ↗
08/18/2026S01256922-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026S00271852-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/26/2026S00271250-I1Request digital key ↗
▸Applications & Permits30
▸BISPLAN / WORK APPROVAL APPLICATION22
02/25/2026520465103Open ↗
11/05/2025510115858Open ↗
05/29/2025540195803Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION4
09/02/2025510115858Open ↗
06/16/2023510115858Open ↗
03/02/2023510115858Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
12/17/2024510115858Open ↗
12/17/2024510115858Open ↗
12/17/2024510115858Open ↗
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb1
06/02/2022540195803Open ↗
▸Zoning, Tax Lot & Property Records12
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP2
04/15/2024510115858Open ↗
04/05/2021520450468Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
03/18/2025510115858Open ↗
07/21/2021510115858Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
04/15/2024510115858Open ↗
05/14/2021510115858Open ↗
▸BISZONING DIAGRAM2
03/18/2025510115858Open ↗
07/21/2021510115858Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/14/2021510115858Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
05/09/2024510115858Open ↗
▸BISZONING EXHIBIT V: CERTIFICATION1
07/21/2021510115858Open ↗
▸BISVERIFY TAX LOT1
04/05/2024510115858Open ↗
▸Seals & Professional Certifications53
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/25/2026S00496612-I1Open ↗
08/21/2026S01031266-I1Open ↗
08/21/2026S01031266-S1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/23/2026S01202386-P2Open ↗
09/23/2026S01202386-P2Open ↗
09/02/2026S01202386-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026S01202386-P2Open ↗
09/02/2026S01031266-I1Open ↗
09/02/2026S01031266-I1Open ↗
Showing 3 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/28/2021540195803Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/28/2021540195803Open ↗
▸Trade Schedules & Equipment9
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
05/14/2021510115858Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/07/2024510115858Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
05/07/2024510115858Open ↗
▸BISPLUMBING (PL) SIGNOFF1
05/14/2024510115858Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
11/08/2024510115858Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026S01031266-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026S01031266-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026S01031266-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026S01031266-I1Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST5
07/22/2021510115858Open ↗
07/21/2021510115858Open ↗
04/27/2021510115858Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/05/2021510115858Open ↗
▸BISSTREET TREE SIGNOFF1
04/17/2024510115858Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026S01031266-I1Open ↗
08/21/2026S01031266-S1Open ↗
08/13/2026S00271250-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRodent Control1
08/13/2026S01031266-I1Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
03/11/2025510115858Open ↗
05/09/2024510115858Open ↗
11/05/2021510115858Open ↗
Showing 3 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER1
11/06/2024510115858Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/06/2024510115858Open ↗
▸BISFENESTRATION AREAS1
11/06/2024510115858Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
11/06/2024510115858Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/06/2024510115858Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/06/2024510115858Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/09/2024510115858Open ↗
▸BISLIGHTING CONTROLS1
11/06/2024510115858Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY9
03/11/2025510115858Open ↗
05/15/2024510115858Open ↗
05/09/2024510115858Open ↗
Showing 3 of 9 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/09/2024510115858Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/06/2024510115858Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
11/06/2024510115858Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
11/06/2024510115858Open ↗
▸BISSOIL REPORT1
05/14/2021510115858Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01114249-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S01114249-I1Open ↗
▸Approvals, Objections & Sign-offs46
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter23
08/21/2026S01031266-I1Open ↗
08/21/2026S01031266-S1Open ↗
08/20/2026S01186774-I1Open ↗
Showing 3 of 23 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE13
03/07/2025510115858Open ↗
02/24/2025510115858Open ↗
12/18/2024510115858Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
08/15/2025510115858Open ↗
06/02/2022540195803Open ↗
01/24/2022510115858Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER2
09/02/2025510115858Open ↗
06/16/2023510115858Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL2
02/21/2025510115858Open ↗
04/27/2021510115858Open ↗
▸BISPED RAMP UNIT APPROVAL1
06/02/2022540195803Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/28/2020520450468Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE3
09/02/2025510115858Open ↗
03/02/2023510115858Open ↗
01/20/2022510115858Open ↗
▸BISCOST AFFIDAVIT1
02/28/2020520450468Open ↗
▸BISINSURANCE: LIABILITY1
01/20/2022510115858Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION7
07/29/2025540195803Open ↗
04/18/2025510115858Open ↗
08/30/2024510115858Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET3
03/03/2022520465103Open ↗
07/30/2021510115858Open ↗
02/28/2020520450468Open ↗
▸BISBOROUGH INTAKE FORM3
09/02/2025510115858Open ↗
06/16/2023510115858Open ↗
03/03/2022520465103Open ↗
▸Other Documents24
▸BISBPP - SUPPORTING DOCUMENTATION6
12/17/2024510115858Open ↗
12/17/2024510115858Open ↗
12/17/2024510115858Open ↗
Showing 3 of 6 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
12/17/2024510115858Open ↗
12/11/2024510115858Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026S01114249-I1Open ↗
08/13/2026S01032689-I1Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
05/14/2021510115858Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
06/02/2022540195803Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
05/13/2022540195803Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
11/06/2024510115858Open ↗
▸BISVESTIBULES1
11/06/2024510115858Open ↗
▸BISMAINTENANCE INFORMATION1
11/06/2024510115858Open ↗
▸BISPERMANENT CERTIFICATE1
11/06/2024510115858Open ↗
▸BISTCO - Supporting Documents1
12/17/2024510115858Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
05/09/2024510115858Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026S01031266-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/21/2026S01031266-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026S01031266-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026S01031266-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S01114249-I1Open ↗