← Back
Two stories - detached, small or mid-size
180 HAGAMAN PLACE
STATEN ISLAND · Port Richmond · BIN 5025195
💬 Discuss this project
1970Year Built
2Stories
A1Building Class
R3AZoning
2,032 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,185 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC505/17/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREGORY'S HOME IMPROVEMTGeneral Contractor303/21/2026
M.A.C. PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN R. SAVINO ARCHIT1216205/17/2023
Building Lifecycle
All (33)Filed (5)Permit Issued (2)Signed Off (2)Violation (2)Inspection (4)Special Inspection (18)
05/18/2023
Signed off — Alteration
REPAIR CEILING JOISTS & ROOF RAFTERS DUE TO FIRE DAMAGE, ADD NON LOAD BEARING PARTITIONS ON THE SECOND FLOOR
S08017135-I1
05/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Steven Savino
05/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
05/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
Steven Savino
05/18/2023
Special inspection requirement — Final
Steven Savino
05/18/2023
Special inspection requirement — Air barrier - visual inspection
Steven Savino
05/18/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Steven Savino
05/18/2023
Special inspection requirement — Fenestration air leakage
Steven Savino
05/18/2023
Special inspection requirement — Fenestration areas
Steven Savino
05/18/2023
Special inspection requirement — Lighting in dwelling units
Steven Savino
05/17/2023
Filed — Alteration
REPAIR CEILING JOISTS & ROOF RAFTERS DUE TO FIRE DAMAGE, ADD NON LOAD BEARING PARTITIONS ON THE SECOND FLOOR
S08017135-P1
04/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
04/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Steven Savino
04/18/2023
Special inspection requirement — Final
Steven Savino
04/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
Steven Savino
04/18/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Steven Savino
04/18/2023
Special inspection requirement — Fenestration areas
Steven Savino
04/18/2023
Special inspection requirement — Lighting in dwelling units
Steven Savino
04/18/2023
Special inspection requirement — Air barrier - visual inspection
Steven Savino
04/18/2023
Special inspection requirement — Fenestration air leakage
Steven Savino
02/07/2023
Signed off — Alteration
RECONFIGURE (1) BATHROOM ON FIRST FLOOR AND (1) ON SECOND FLOOR.
S08018912-I1
01/19/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/30/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/28/2022
Filed — Alteration
RECONFIGURE (1) BATHROOM ON FIRST FLOOR AND (1) ON SECOND FLOOR.
S08018912-P2
12/22/2022
Permit issued — General Construction
S08017135-I1-GC
12/19/2022
Filed — Alteration
REPAIR CEILING JOISTS & ROOF RAFTERS DUE TO FIRE DAMAGE, ADD NON LOAD BEARING PARTITIONS ON THE SECOND FLOOR
S08017135-I1
11/23/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/17/2022
Filed — Alteration
RECONFIGURE (1) BATHROOM ON FIRST FLOOR AND (1) ON SECOND FLOOR.
S08018912-P1
11/07/2022
Permit issued — Plumbing
S08018912-I1-PL
11/01/2022
Filed — Alteration
RECONFIGURE (1) BATHROOM ON FIRST FLOOR AND (1) ON SECOND FLOOR.
S08018912-I1
01/06/2021
Violation issued (ECB, closed)
Construction
12/02/2015
Violation issued (ECB, closed)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGREGORY'S HOME IMPROVEMT12/22/2022
DOB NOWPlumbingSigned-offM.A.C. PLUMBING, INC11/07/2022
2 projects · most recent 02/03/2025
General Wiring
FiledStatusContractorScope
02/03/2025Permit IssuedJ.P.E. ELEC'L CONTR'S INC2 meters
10/24/2022CompleteKWONG MING ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/30/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
05/18/2023Structural Stability – Alterations of existing buildingsSteven Savinospecial
05/18/2023Fire-Resistant Penetrations and JointsSteven Savinospecial
05/18/2023Fire-Resistance Rated ConstructionSteven Savinoprogress
05/18/2023FinalSteven Savinoprogress
05/18/2023Air barrier - visual inspectionSteven Savinoenergy_progress
05/18/2023Fenestration and door U-factor and product ratingsSteven Savinoenergy_progress
05/18/2023Fenestration air leakageSteven Savinoenergy_progress
05/18/2023Fenestration areasSteven Savinoenergy_progress
05/18/2023Lighting in dwelling unitsSteven Savinoenergy_progress
04/18/2023Fire-Resistant Penetrations and JointsSteven Savinospecial
04/18/2023Structural Stability – Alterations of existing buildingsSteven Savinospecial
04/18/2023FinalSteven Savinoprogress
04/18/2023Fire-Resistance Rated ConstructionSteven Savinoprogress
04/18/2023Fenestration and door U-factor and product ratingsSteven Savinoenergy_progress
04/18/2023Fenestration areasSteven Savinoenergy_progress
04/18/2023Lighting in dwelling unitsSteven Savinoenergy_progress
04/18/2023Air barrier - visual inspectionSteven Savinoenergy_progress
04/18/2023Fenestration air leakageSteven Savinoenergy_progress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026S08018912-I1Request digital key ↗
08/23/2026S08018912-P1Request digital key ↗
08/23/2026S08018912-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026S08017135-P1Open ↗
09/01/2026S08017135-P1Open ↗
09/01/2026S08017135-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026S08018912-P2Open ↗
08/23/2026S08018912-P1Open ↗
08/23/2026S08018912-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S08017135-P1Open ↗
08/23/2026S08017135-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026S08018912-P2Open ↗
08/23/2026S08018912-P1Open ↗
08/23/2026S08018912-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/23/2026S08017135-I1Open ↗