← Back
BuildNYC
Two stories - detached, small or mid-size
180 HAGAMAN PLACE
STATEN ISLAND · Port Richmond · BIN 5025195
💬 Discuss this project
1970Year Built
2Stories
A1Building Class
R3AZoning
2,032 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,185 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Fire damage repair and partition addition5p · 2 filings · 20 docs
Floor 1Fire damage repair and partition addition5p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Steven R. Savino Architect505/17/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Gregory's Home ImprovemtGeneral Contractor303/21/2026
M.A.C. PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Steven R. Savino1216205/17/2023
Building Lifecycle
05/18/2023
Signed off — Alteration
REPAIR CEILING JOISTS & ROOF RAFTERS DUE TO FIRE DAMAGE, ADD NON LOAD BEARING PARTITIONS ON THE SECOND FLOOR
S08017135-I1
05/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Steven Savino
05/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
05/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
Steven Savino
05/18/2023
Special inspection requirement — Final
Steven Savino
33 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGregory's Home Improvemt12/22/2022
DOB NOWPlumbingSigned-offM.A.C. Plumbing11/07/2022
2 projects · most recent 02/03/2025
General Wiring
FiledStatusContractorScope
02/03/2025Permit IssuedJ.P.E. Electrical Contractors—
10/24/2022CompleteKwong Ming ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/30/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
05/18/2023Structural Stability – Alterations of existing buildingsSteven Savinospecial
05/18/2023Fire-Resistant Penetrations and JointsSteven Savinospecial
05/18/2023Fire-Resistance Rated ConstructionSteven Savinoprogress
05/18/2023FinalSteven Savinoprogress
05/18/2023Air barrier - visual inspectionSteven Savinoenergy_progress
05/18/2023Fenestration and door U-factor and product ratingsSteven Savinoenergy_progress
05/18/2023Fenestration air leakageSteven Savinoenergy_progress
05/18/2023Fenestration areasSteven Savinoenergy_progress
05/18/2023Lighting in dwelling unitsSteven Savinoenergy_progress
04/18/2023Fire-Resistant Penetrations and JointsSteven Savinospecial
04/18/2023Structural Stability – Alterations of existing buildingsSteven Savinospecial
04/18/2023FinalSteven Savinoprogress
04/18/2023Fire-Resistance Rated ConstructionSteven Savinoprogress
04/18/2023Fenestration and door U-factor and product ratingsSteven Savinoenergy_progress
04/18/2023Fenestration areasSteven Savinoenergy_progress
04/18/2023Lighting in dwelling unitsSteven Savinoenergy_progress
04/18/2023Air barrier - visual inspectionSteven Savinoenergy_progress
04/18/2023Fenestration air leakageSteven Savinoenergy_progress
28 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account