← Back
Single or multiple dwelling with stores or offices
180 IRVING AVENUE
BROOKLYN · BIN 3074493
💬 Discuss this project
1931Year Built
3Stories
S9Building Class
R6Zoning
4,875 sfGross Floor Area
6Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: YA JIANG REALTY LLC · 2,500 sf lot · 1.95 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof3p · 2 filings · 20 docs
Floor 42p · 1 filing · 10 docs
Floor 32p · 1 filing · 10 docs
Floor 22p · 1 filing · 10 docs
Floor 12p · 1 filing · 10 docs
Cellar1p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
YA JIANG REALTY1303/22/2026
CHIMV EXPRESS INC C/O MAR103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEON SKVIRSKY PE504/13/2023
COLOMBO ARCHITECTURAL STUDIO PC304/04/2022
KDV DESIGNS ARCHITECTS LLC110/06/2021
BILLAH ENGINEERING PLLC1006/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TBC & ASSOC.203/21/2026
ECDESIGN STUDIO2003/21/2026
BUILDING BROTHERS1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAD SIGNSScaffold407/08/2026
RAGEM CONSTRUCTION CORPGeneral Contractor203/21/2026
CATMAN PLUMBING INCPlumbing207/08/2026
MASTER FIRE MECH CORPGeneral Contractor107/08/2026
R.G.M. SIGNS INCGeneral Contractor107/08/2026
SAMUEL & SONS P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROBERT PAPAZIAN ARCHITECT3491104/13/2023
COLOMBO ARCHITECTURAL STU4930304/04/2022
SY ENGINEERING PLLC5149110/06/2021
Building Lifecycle
All (101)Filed (19)Permit Issued (10)Signed Off (9)Violation (36)Inspection (5)Objection (2)Special Inspection (20)
08/19/2025
Violation issued (ECB, closed)
Construction
06/30/2025
Signed off — Alteration
INSTALL STOREFRONTAWNING WITH NON-ILLUMINATED COPY. COPY TO BE 12 SQ FT OR LESS. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
B00826719-I1
06/17/2025
Signed off — Alteration
INSTALL NON-ILLUMINATED WALL SIGN (NEW YORK LOTTERY)
B00826709-I1
06/17/2025
Signed off — Alteration
B00826539-I1
06/17/2025
Signed off — Alteration
INSTALL NON-ILLUMINATED WALL SIGN (ORGANIC)
B00826657-I1
06/17/2025
Signed off — Alteration
INSTALL ILLUMINATED WALL SIGN (FRESH FOODS MEAT MARKET)
B00826637-I1
06/10/2025
Violation issued (HPD, closed)
A
01/09/2025
Signed off — Alteration
Installation of plumbing fixtures in connection with General Construction Application for the enlargement of exisitng deli into adjacent store.
B00597505-S1
04/10/2024
Violation issued (HPD, closed)
A
02/20/2024
Permit issued — General Construction
B00826719-I1-GC
09/15/2023
Permit issued — Sign
B00826637-I1-SG
09/07/2023
Permit issued — Sign
B00826709-I1-SG
09/07/2023
Permit issued — Sign
B00826657-I1-SG
09/07/2023
Permit issued — Sign
B00826539-I1-SG
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/18/2023
Objection raised — Other
04/18/2023
Objection resolved — Addressed
04/13/2023
Filed — Alteration
INSTALL STOREFRONTAWNING WITH NON-ILLUMINATED COPY. COPY TO BE 12 SQ FT OR LESS. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
B00826719-I1
04/13/2023
Filed — Alteration
INSTALL NON-ILLUMINATED WALL SIGN (NEW YORK LOTTERY)
B00826709-I1
04/13/2023
Filed — Alteration
B00826539-I1
04/13/2023
Filed — Alteration
INSTALL NON-ILLUMINATED WALL SIGN (ORGANIC)
B00826657-I1
04/13/2023
Filed — Alteration
INSTALL ILLUMINATED WALL SIGN (FRESH FOODS MEAT MARKET)
B00826637-I1
04/11/2023
Special inspection requirement — Tenant Protection Plan Compliance
Robert Papazian
03/23/2023
Violation issued (HPD, closed)
A
03/07/2023
Signed off — Alteration
Installation of plumbing fixtures in connection with General Construction Application for the enlargement of exisitng deli into adjacent store.
B00597505-I1
02/09/2023
Special inspection requirement — Final
LEON SKVIRSKY
02/09/2023
Special inspection requirement — Final
LEON SKVIRSKY
12/09/2022
Violation issued (ECB, closed)
Construction
04/06/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yahaira Volquez Colombo
04/04/2022
Filed — Alteration
Installation of plumbing fixtures in connection with General Construction Application for the enlargement of exisitng deli into adjacent store.
B00597505-P1
04/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yahaira Volquez Colombo
04/01/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/29/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/18/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/03/2022
Permit issued — Plumbing
B00597505-S1-PL
02/10/2022
Permit issued — General Construction
B00597505-I1-GC-CX
01/08/2022
Filed — Alteration
Installation of plumbing fixtures in connection with General Construction Application for the enlargement of exisitng deli into adjacent store.
B00597505-S1
12/30/2021
Filed — Alteration
Installation of plumbing fixtures in connection with General Construction Application for the enlargement of exisitng deli into adjacent store.
B00597505-I1
11/17/2021
Permit issued — Mechanical Systems
B00546193-I1-MS
11/08/2021
Special inspection requirement — HVAC-R and service water heating equipment
Yahaira Volquez Colombo
11/08/2021
Special inspection requirement — Lighting controls
Yahaira Volquez Colombo
11/08/2021
Special inspection requirement — Maintenance information
Yahaira Volquez Colombo
11/08/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Yahaira Volquez Colombo
11/08/2021
Special inspection requirement — Interior lighting power
Yahaira Volquez Colombo
11/08/2021
Special inspection requirement — HVAC-R and service water heating system controls
Yahaira Volquez Colombo
11/05/2021
Violation issued (HPD, closed)
B
10/06/2021
Filed — Alteration
INSTALLING NEW COMMERCIAL KITCHEN COOKING VENTILATION SYSTEM. NEW S/S HOOD WITH NEW EXHAUST/MUA DUCTS AND NEW EXHAUST/MUA FANS. NO OTHER WORK TO BE DONE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00546193-I1
09/21/2021
Special inspection requirement — Mechanical Systems
Yahaira Volquez Colombo
09/21/2021
Special inspection requirement — Final
Yahaira Volquez Colombo
08/04/2021
Signed off — Alteration
INSTALL (4) NEW BOILERS FOR EXISTING 4-FAMILY DWELLING ON CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00405069-I1
08/04/2021
Signed off — Alteration
RENOVATION OF EXISTING PARTIAL CELLAR, SECOND AND THIRD FLOOR WITH PLUMBING WORK AS PER PLAN : REPLACE KITCHEN AND RELOCATE BATHROOM FIXTURES; NEW HOT WATER HEATERS ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00405066-I1
06/24/2021
Special inspection requirement — Duct leakage testing, insulation and design
SUNGBOM YI
06/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNGBOM YI
06/24/2021
Special inspection requirement — Mechanical Systems
SUNGBOM YI
06/24/2021
Special inspection requirement — Energy Code Compliance Inspections
DAVIDSON CHRISTMAS
06/24/2021
Special inspection requirement — Electrical motors and elevators
SUNGBOM YI
06/24/2021
Special inspection requirement — Maintenance information
SUNGBOM YI
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offR.G.M. SIGNS INC02/20/2024
DOB NOWSignSigned-offR.G.M. SIGNS INC09/15/2023
DOB NOWSignSigned-offR.G.M. SIGNS INC09/07/2023
DOB NOWSignSigned-offR.G.M. SIGNS INC09/07/2023
DOB NOWSignSigned-offR.G.M. SIGNS INC09/07/2023
DOB NOWPlumbingSigned-offSAMUEL & SONS P & H INC03/03/2022
DOB NOWGeneral ConstructionSigned-offRAGEM CONSTRUCTION02/10/2022
DOB NOWMechanical SystemsPermit IssuedMASTER FIRE MECH CORP11/17/2021
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC10/09/2020
DOB NOWBoiler EquipmentSigned-offCATMAN PLUMBING INC10/09/2020
BISOTISSUEDSPLEN CONSTRUCTION INC04/06/2021
BISOTISSUEDYILIN CONSTRUCTION INC10/08/2020
BISFPISSUEDMASTER FIRE SYSTEMS, INC01/30/2019
BISOTISSUEDSJ EMPIRE CORP01/03/2019
BISPLISSUEDL&J PLG & HTG CO OF NY IN01/03/2019
BISMHISSUEDMASTER FIRE MECH CORP09/12/2018
BISMHISSUEDVENT TECH INC12/16/2010
BISPLISSUEDPAUL COMMDORE & SONS LTD08/25/2003
BISOTISSUEDM & D CONSTRUCTION CO04/03/2003
1 project · most recent 10/06/2021
Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/06/2021Permit IssuedMASTER FIRE MECH CORPAssociated Ducts and Piping, Ventilation Systems
Ventilation
Captiveaire NCA16FA 2,100 CFM · Kitchen Exhaust ×3
Ducts & Piping
Captiveaire MODEL G16FA 1,500 CFM · Makeup Air ×2
4 projects · most recent 05/19/2025
General Wiring
FiledStatusContractorScope
05/19/2025CompleteRAINBOW ELECTRIC CO., INC—
05/19/2025CompleteRAINBOW ELECTRIC CO., INC—
09/05/2024CompleteRAINBOW ELECTRIC CO., INCGeneral Wiring
05/27/2021CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
04/11/2023Tenant Protection Plan ComplianceRobert Papazianspecial
02/09/2023FinalLEON SKVIRSKYprogress
02/09/2023FinalLEON SKVIRSKYprogress
04/05/2022Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
04/04/2022Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
11/08/2021HVAC-R and service water heating equipmentYahaira Volquez Colomboenergy_progress
11/08/2021Lighting controlsYahaira Volquez Colomboenergy_progress
11/08/2021Maintenance informationYahaira Volquez Colomboenergy_progress
11/08/2021HVAC-R and service water piping design and insulationYahaira Volquez Colomboenergy_progress
11/08/2021Interior lighting powerYahaira Volquez Colomboenergy_progress
11/08/2021HVAC-R and service water heating system controlsYahaira Volquez Colomboenergy_progress
09/21/2021Mechanical SystemsYahaira Volquez Colombospecial
09/21/2021FinalYahaira Volquez Colomboprogress
06/24/2021Duct leakage testing, insulation and designSUNGBOM YIenergy_progress
06/24/2021Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
06/24/2021Mechanical SystemsSUNGBOM YIspecial
06/24/2021Energy Code Compliance InspectionsDAVIDSON CHRISTMASprogress
06/24/2021Electrical motors and elevatorsSUNGBOM YIenergy_progress
06/24/2021Maintenance informationSUNGBOM YIenergy_progress
06/24/2021FinalDAVIDSON CHRISTMASprogress
▾Documents — 151 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch9
09/01/2026B00546193-I1Request digital key ↗
08/31/2026B00597505-P1Request digital key ↗
08/31/2026B00597505-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/01/2026B00405066-I1Request digital key ↗
09/01/2026B00405066-P6Request digital key ↗
09/01/2026B00405066-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment5
09/01/2026B00405069-P4Request digital key ↗
09/01/2026B00405069-P2Request digital key ↗
09/01/2026B00405069-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION9
05/06/2021340771258Open ↗
04/29/2021340771258Open ↗
03/23/2021340771258Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION7
04/07/2021340771258Open ↗
10/08/2020340771258Open ↗
01/31/2019321826440Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/01/2026B00405066-P3Open ↗
09/01/2026B00405066-I1Open ↗
09/01/2026B00405066-P6Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/31/2026B00826657-I1Open ↗
08/28/2026B00546193-I1Open ↗
08/28/2026B00546193-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
09/14/2019321817343Open ↗
09/14/2019321817343Open ↗
12/27/2018321661279Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026B00546193-I1Open ↗
08/28/2026B00546193-I1Open ↗
08/26/2026B00826719-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/30/2020340771258Open ↗
09/13/2018321817343Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/27/2018321661279Open ↗
09/13/2018321817343Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/30/2020340771258Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/30/2020340771258Open ↗
▸Trade Schedules & Equipment3
▸BISFA - FDNY APPROVAL : FD-FAA2
07/22/2019321826440Open ↗
08/21/2018321826440Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/27/2018321661279Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
12/27/2018321661279Open ↗
09/13/2018321817343Open ↗
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
09/01/2026B00405066-P3Open ↗
09/01/2026B00405066-P6Open ↗
09/01/2026B00405066-I1Open ↗
Showing 3 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
09/30/2020340771258Open ↗
12/27/2018321661279Open ↗
09/13/2018321817343Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/02/2010320245427Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/09/2021340771258Open ↗
10/08/2020340771258Open ↗
09/30/2020340771258Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/14/2019321817343Open ↗
09/13/2018321817343Open ↗
09/13/2018321817343Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
08/09/2021340771258Open ↗
09/14/2019321817343Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/30/2020340771258Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00597505-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/09/2021340771258Open ↗
10/08/2020340771258Open ↗
09/30/2020340771258Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
08/09/2021340771258Open ↗
10/02/2019321826440Open ↗
09/14/2019321817343Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/21/2018321826440Open ↗
▸BISSUPERSEDING LETTER1
04/07/2021340771258Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/02/2010320245427Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
09/30/2020340771258Open ↗
09/14/2019321817343Open ↗
07/22/2019321826440Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
08/09/2021340771258Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION5
08/09/2021340771258Open ↗
05/06/2021340771258Open ↗
03/23/2021340771258Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
12/26/2018321661279Open ↗
09/13/2018321817343Open ↗
08/21/2018321826440Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM4
04/07/2021340771258Open ↗
10/02/2019321826440Open ↗
09/14/2019321817343Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
09/30/2020340771258Open ↗