← Back
Two stories - detached, small or mid-size
180 IRWIN STREET
BROOKLYN · BIN 3246495
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R3-1Zoning
3,424 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.86 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction39p · 1 filing · 20 docs
Floor 1Under Construction38p · 1 filing · 20 docs
CellarUnder Construction12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ABECO CONSTRUCTION303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/21/2024$1.4M—— → —$409/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRICOLAGE DESIGNS602/25/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRICOLAGE DESIGNS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOHN EVAN CONTRACTING CORGeneral Contractor204/09/2026
YAFE MEOD CORPGeneral Contractor204/09/2026
FORSYTHE PLBG & HTG CORPPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519502/25/2026
Building Lifecycle
All (59)Filed (6)Permit Issued (5)Violation (4)Objection (20)Special Inspection (24)
02/25/2026
Filed — Alteration
FIRST AND SECOND STORY, REAR ENLARGEMENT TO AN EXISTING RESIDENTIAL BUILDING
B01176360-P3
02/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
02/25/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
02/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
02/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
02/25/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
02/25/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
02/09/2026
Objection resolved — Addressed
01/30/2026
Permit issued — Construction Fence
B01176360-S1-FN
01/29/2026
Permit issued — Structural
B01176360-I1-GC-CX
01/27/2026
Objection resolved — Addressed
01/27/2026
Objection resolved — Addressed
01/26/2026
Objection resolved — Addressed
01/13/2026
Objection resolved — Addressed
01/13/2026
Objection resolved — Addressed
01/13/2026
Objection resolved — Addressed
01/06/2026
Violation issued (ECB, closed)
Unknown
01/06/2026
Violation issued (ECB, closed)
Construction
01/06/2026
Violation issued (ECB, closed)
Construction
12/30/2025
Objection raised — Structural
12/30/2025
Objection raised — Structural
12/30/2025
Objection raised — Zoning
12/30/2025
Objection raised — Code
12/30/2025
Objection raised — Scope
12/30/2025
Objection raised — Zoning
12/30/2025
Objection raised — Mechanical
12/18/2025
Filed — Alteration
FIRST AND SECOND STORY, REAR ENLARGEMENT TO AN EXISTING RESIDENTIAL BUILDING
B01176360-P2
12/18/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
12/18/2025
Special inspection requirement — Air barrier — testing
Younes Abouyaala
12/18/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
12/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
12/18/2025
Special inspection requirement — Final
NAVEEN KUMAR
12/18/2025
Special inspection requirement — Lowest Floor Elevation
Younes Abouyaala
12/18/2025
Special inspection requirement — Interior lighting power
Younes Abouyaala
12/18/2025
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
12/18/2025
Special inspection requirement — Fenestration areas
Younes Abouyaala
07/18/2025
Permit issued — Plumbing
B01176360-S2-PL
07/02/2025
Permit issued — Construction Fence
B01176360-S1-FN
06/16/2025
Filed — Alteration
FIRST AND SECOND STORY, REAR ENLARGEMENT TO AN EXISTING RESIDENTIAL BUILDING
B01176360-P1
06/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
06/16/2025
Special inspection requirement — Final
NAVEEN KUMAR
06/16/2025
Special inspection requirement — Lowest Floor Elevation
Younes Abouyaala
06/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
06/16/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
06/16/2025
Special inspection requirement — Air barrier — testing
Younes Abouyaala
06/16/2025
Special inspection requirement — Interior lighting power
Younes Abouyaala
06/16/2025
Special inspection requirement — Fenestration areas
Younes Abouyaala
06/16/2025
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
06/04/2025
Objection resolved — Addressed
06/03/2025
Objection resolved — Addressed
05/23/2025
Objection raised — Admin
05/23/2025
Objection resolved — Addressed
05/22/2025
Objection raised — Scope
05/22/2025
Objection raised — Cost
05/14/2025
Filed — Alteration
FIRST AND SECOND STORY, REAR ENLARGEMENT TO AN EXISTING RESIDENTIAL BUILDING
B01176360-S2
05/13/2025
Filed — Alteration
FIRST AND SECOND STORY, REAR ENLARGEMENT TO AN EXISTING RESIDENTIAL BUILDING
B01176360-S1
05/05/2025
Permit issued — General Construction
B01176360-I1-GC-CX
02/20/2025
Violation issued (ECB, closed)
Construction
02/05/2025
Filed — Alteration
FIRST AND SECOND STORY, REAR ENLARGEMENT TO AN EXISTING RESIDENTIAL BUILDING
B01176360-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedYAFE MEOD CORP01/30/2026
DOB NOWStructuralPermit IssuedYAFE MEOD CORP01/29/2026
DOB NOWPlumbingPermit IssuedFORSYTHE PLBG & HTG CORP07/18/2025
DOB NOWConstruction FencePermit IssuedJOHN EVAN CONTRACTING COR07/02/2025
DOB NOWGeneral ConstructionPermit IssuedJOHN EVAN CONTRACTING COR05/05/2025
1 project · most recent 02/25/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/25/2026Permit IssuedFORSYTHE PLBG & HTG CORPGas, Storm, Water/Sanitary
1 project · most recent 06/01/2026
General Wiring
FiledStatusContractorScope
06/01/2026Permit IssuedR. STRANGIS ELECL CONTRSGeneral Wiring
1 project · most recent 02/25/2026
Wood
FiledStatusContractorScope
02/25/2026Permit IssuedYAFE MEOD CORPWood
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
02/25/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
02/25/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
02/25/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
02/25/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
02/25/2026Maintenance informationYounes Abouyaalaenergy_progress
02/25/2026Permanent certificateYounes Abouyaalaenergy_progress
12/18/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
12/18/2025Air barrier — testing Younes Abouyaalaenergy_progress
12/18/2025Fenestration air leakageYounes Abouyaalaenergy_progress
12/18/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
12/18/2025FinalNAVEEN KUMARprogress
12/18/2025Lowest Floor ElevationYounes Abouyaalaprogress
12/18/2025Interior lighting powerYounes Abouyaalaenergy_progress
12/18/2025Air barrier - visual inspectionYounes Abouyaalaenergy_progress
12/18/2025Fenestration areasYounes Abouyaalaenergy_progress
06/16/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
06/16/2025FinalNAVEEN KUMARprogress
06/16/2025Lowest Floor ElevationYounes Abouyaalaprogress
06/16/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
06/16/2025Fenestration air leakageYounes Abouyaalaenergy_progress
06/16/2025Air barrier — testing Younes Abouyaalaenergy_progress
06/16/2025Interior lighting powerYounes Abouyaalaenergy_progress
06/16/2025Fenestration areasYounes Abouyaalaenergy_progress
06/16/2025Air barrier - visual inspectionYounes Abouyaalaenergy_progress
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026B01176360-P1Request digital key ↗
08/21/2026B01176360-P4Request digital key ↗
08/21/2026B01176360-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/21/2026B01176360-P1Open ↗
08/21/2026B01176360-I1Open ↗
08/13/2026B01176360-P2Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature8
08/26/2026B01176360-P3Open ↗
08/26/2026B01176360-P3Open ↗
08/25/2026B01176360-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026B01176360-P4Open ↗
08/21/2026B01176360-S2Open ↗
08/21/2026B01176360-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026B01176360-P3Open ↗
08/25/2026B01176360-P2Open ↗
08/25/2026B01176360-P1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026B01176360-P4Open ↗
08/21/2026B01176360-P1Open ↗
08/21/2026B01176360-I1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents9
▸DOB NOWSite Survey: Initial3
08/21/2026B01176360-P1Open ↗
08/21/2026B01176360-I1Open ↗
08/13/2026B01176360-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/21/2026B01176360-P1Open ↗
08/21/2026B01176360-I1Open ↗
08/13/2026B01176360-P2Open ↗
▸DOB NOWPlot Diagram3
08/21/2026B01176360-P1Open ↗
08/21/2026B01176360-I1Open ↗
08/13/2026B01176360-P2Open ↗