← Back
BuildNYC
Condo, commercial tower (mixed-use) [derived]
Hotel Indigo LES
180 ORCHARD STREET · Lower East Side · BIN 1090121
💬 Discuss this project
2008Year Built
24Stories
RCBuilding Class
C4-4AZoning
199,408 sfGross Floor Area
6Units
LL97 CoveredRent Stabilized2 Active Violations 3 old, status unconfirmed ▸FISP: SAFE
Condo, commercial tower (mixed-use) [derived] · 15,611 sf lot · 12.77 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 124 filings
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 112 filings
Mezzanine6 filings
Cellar3 filings
Sub-Cellar1 filing
Site & exterior1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
180 Orchard Owner6603/21/2026
Tusk Holdings1307/08/2026
Les Realty Group703/21/2026
Greystone Owner303/21/2026
Les Realty303/21/2026
First York Associates203/21/2026
180 Orchard Retail203/21/2026
Bobblehaus103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kreska Architecture611/18/2025
Spar Unlimited104/25/2024
Friedman Engineering710/27/2023
Shaaban Engineering102/13/2023
Stantec101/09/2023
ABS Engineering310/17/2022
Tes Engineering206/07/2022
Heitler Houstoun Architects502/28/2022
Nathan Rich, RA202/15/2022
J.T. Nakaoka Associates Architects102/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants1503/21/2026
Milrose Consultants1403/21/2026
MK Associates1003/21/2026
National Maintenance203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hirsch ConstructionGeneral Contractor1307/08/2026
Donald R Borg ConstructionGeneral Contractor307/08/2026
Henry Myers P & HPlumbing307/08/2026
KG SprinklerFire Protection307/08/2026
Building ConceptsGeneral Contractor207/08/2026
SLNY ManagementGeneral Contractor107/08/2026
National MaintenanceSign hanger107/08/2026
Fulton Plumbing & HeatingPlumbing107/08/2026
The Big ICFire Protection107/08/2026
Inter Connection ElectricElectrical103/21/2026
The Big ICPlumbing107/08/2026
Lume ElectricElectrical103/22/2026
Robin ElectricalElectrical103/22/2026
Inter Connection EletricGeneral Contractor103/22/2026
Katarzyna SlizGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Integrity Consulting Service666411/18/2025
ABS Engineering4835310/17/2022
Ace Structural Engineering496905/26/2022
Richard H. Balser Engineering3028202/08/2022
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
11/09/2026
Boiler inspection report filed
Initial · no defects · Accepted
07/15/2026
Elevator Category 1 inspection report filed
06/29/2026
Elevator Category 1 inspection report filed
05/08/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
284 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Cerina General Contracting—
DOB NOW—Building Concepts—
DOB NOW—Building Concepts—
DOB NOW—The Big IC—
DOB NOW—The Big IC—
DOB NOW—SLNY Management—
DOB NOW—National Maintenance—
DOB NOW—Fulton Plumbing & Heating—
DOB NOW—Hirsch Construction—
DOB NOW—Donald R Borg Construction—
DOB NOW—Donald R Borg Construction—
DOB NOW—H M Sprinkler—
DOB NOW—H M Sprinkler—
DOB NOW—H M Sprinkler—
DOB NOW—Henry Myers P & H—
DOB NOW—Hirsch Construction—
DOB NOW—Hirsch Construction—
DOB NOW—Hirsch Construction—
DOB NOW—Hirsch Construction—
DOB NOW—Hirsch Construction—
DOB NOW—Hirsch Construction—
BIS—Run Rite Mechanical—
BIS—American Car Lift Service—
BIS—The Big IC—
BIS—Bcre Services—
BIS—Bcre Services—
BIS—Pride Builders—
BIS—The Big IC—
BIS—S&E Bridge & Scaffold—
BIS—Bcre Services—
BIS—American Sign & Electrical—
BIS—Rockledge Scaffold—
BIS—Firemasters—
BIS—The Big IC—
BIS—Bcre Services—
BIS—Bcre Services—
BIS—Pete Gonzalez Heating—
BIS—Bcre Services—
BIS—Rka Piping and Heating—
BIS—Bcre Services—
+ 31 more permits on file
Nothing on file for this building.
Nothing on file for this building.
599 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account