← Back
BuildNYC
Elevator cooperative
180 WEST HOUSTON STREET
MANHATTAN · West Village · BIN 1008380
💬 Discuss this project
1952Year Built
13Stories
D4Building Class
R6Zoning
71,490 sfGross Floor Area
115Units
LL97 CoveredRent Stabilized5 Active Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: Houston Street Owners · 9,012 sf lot · 7.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHouston Street Owners Corp.1p · 1 filing · 8 docs
Floor 14Unit 14A1 filing · 15 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8Unit 8A, Unit 8B, Unit 8H27p · 3 filings · 20 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 11p · 1 filing · 4 docs
Site & exteriorHouston Street Owners Corp.24p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Houston St Owners2703/22/2026
Park River Owners1507/08/2026
West Houston Street Owners503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
David Keane P.E109/08/2026
McMullen Architecture209/07/2026
Bentley Architecture Design Studio208/23/2025
Misra & Associates301/17/2023
Cowley Engineering208/23/2022
Urban Integrations211/09/2021
Kimberly Peck Architect105/12/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Epac Building Consulting403/21/2026
Jenny Flores Expediting303/21/2026
Theresa Voltaggio203/21/2026
Maryclare Nepogoda Expediter103/21/2026
United Safety Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Apollo Plumbing & HeatingPlumbing207/08/2026
A & J Contractors CoGeneral Contractor207/08/2026
NY Best Paintingspecialty_contractor107/08/2026
Everest ScaffoldingScaffold107/08/2026
Orbit Plumbing & HeatingPlumbing107/08/2026
Andamio ScaffoldingScaffold107/08/2026
Beyer ConstructionGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
David Keane PE2835109/08/2026
Ivan Design Engineering6983109/08/2026
Misra & Associates3265301/17/2023
Cowley Engineering186208/23/2022
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
11/04/2026
Signed off — Alteration
Subsequent filing for plumbing works.
M01270979-S1
10/20/2026
Signed off — Alteration
Subsequent filing for plumbing works.
M01270979-I1
10/13/2026
Boiler inspection report filed
Initial · no defects · Accepted
10/07/2026
Elevator Category 1 inspection report filed
205 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offApollo Plumbing & Heating01/30/2026
DOB NOWGeneral ConstructionSigned-offBeyer Construction11/13/2025
DOB NOWPlumbingSigned-offApollo Plumbing & Heating07/18/2022
DOB NOWGeneral ConstructionSigned-offNY Best Painting07/12/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/21/2021
DOB NOWGeneral ConstructionSigned-offA & J Contractors Co09/13/2021
DOB NOWGeneral ConstructionSigned-offA & J Contractors Co08/05/2021
DOB NOWSidewalk ShedSigned-offEverest Scaffolding04/23/2021
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating07/07/2020
BISOTISSUEDUnited Elite Group08/26/2020
BISOTISSUEDUnited Elite Group06/24/2020
BISMHISSUEDR & R Home Repairs05/02/2019
BISPLISSUEDAdriatic Plumbing & Heating03/18/2019
BISOTISSUEDR & R Home Repairs03/01/2019
BISEQISSUEDPowers Bridging & Scaffolding07/21/2017
BISOTISSUEDAccura Rest. & Waterproof06/02/2017
BISOTISSUEDWalker Ridge Construction05/22/2017
BISPLISSUEDBauer Mechancial10/24/2013
BISPLISSUEDBauer Mechanical10/23/2012
BISPLISSUEDP.S.I. Mechanical11/26/2010
BISOTISSUEDVincent Russo11/10/2010
BISEQISSUEDPowers Bridging & Scaffolding06/16/2009
BISPLISSUEDCatman Plumbing01/08/2009
BISOTISSUEDS One 210/23/2008
BISOTISSUEDWilliam Dee Installation03/23/2007
BISOTISSUEDAtlas Restoration02/27/2007
BISEQISSUEDPowers Bridging & Scaffolding01/10/2007
BISPLISSUEDMagnum Plumbing & Heating01/04/2007
BISPLISSUEDAccurate Mechanical12/21/2006
BISOTISSUEDAtlas Restoration12/20/2006
BISOTISSUEDWilliam Dee Installation10/31/2006
BISOTISSUEDAccura Restoration09/12/2006
BISOTISSUEDDaniel J Murphy08/22/2006
BISEQISSUEDPowers Bridging & Scaffolding04/24/2006
BISEQISSUEDPowers Bridging & Scaffolding01/27/2006
BISOTISSUEDAccura Restoration09/21/2005
BISEQISSUEDPowers Bridging & Scaffolding08/18/2005
BISPLISSUEDNew York Standard Mechanical08/11/2005
BISMHISSUEDArete Development11/26/2004
BISOTISSUEDDesign Build05/13/2004
+ 11 more permits on file
2 projects · most recent 09/08/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/08/2026——Gas, Water/Sanitary
08/23/2025Signed-offApollo Plumbing & HeatingGas, Water/Sanitary
9 projects · most recent 02/05/2026
General Wiring
FiledStatusContractorScope
02/05/2026CompleteRidge ElectricGeneral Wiring
08/03/2022CompleteArma ElectricGeneral Wiring
12/21/2021CompleteKings Electric Co—
12/07/2021CompleteBorowide Elect'l Contractors—
04/19/2021CompleteBorowide Elect'l Contractors—
09/24/2020Permit IssuedRobert ChimentiGeneral Wiring
11/18/2019CompleteShuir Electrical ContractorsGeneral Wiring
03/11/2019CompleteShuir Electrical ContractorsGeneral Wiring
12/29/2017CompleteCaputek Electrical Services—
1 project · most recent 09/08/2026
Steel Masonry
FiledStatusContractorScope
09/08/2026——Steel, Masonry
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/24/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/24/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
10/02/2026Interior lighting powerBRETT MCMULLENenergy_progress
10/02/2026Lighting controlsBRETT MCMULLENenergy_progress
10/02/2026Air barrier - visual inspectionBRETT MCMULLENenergy_progress
10/02/2026Fenestration and door U-factor and product ratingsBRETT MCMULLENenergy_progress
09/02/2026Structural Stability – Alterations of existing buildingsDAVID KEANEspecial
09/02/2026MasonryDAVID KEANEspecial
09/02/2026Structural Steel - DetailsDAVID KEANEspecial
09/02/2026Structural Steel - WeldingIvan Lukspecial
09/01/2026FinalDAVID KEANEprogress
08/24/2026Energy Code Compliance InspectionsBRETT MCMULLENprogress
08/24/2026FinalBRETT MCMULLENprogress
01/18/2023Interior lighting powerRohit Misraenergy_progress
01/18/2023Fire-Resistant Penetrations and JointsRohit Misraspecial
01/18/2023FinalRohit Misraprogress
01/18/2023Fire-Resistance Rated ConstructionRohit Misraprogress
01/10/2023Interior lighting powerRohit Misraenergy_progress
01/10/2023Fire-Resistance Rated ConstructionRohit Misraprogress
01/10/2023FinalRohit Misraprogress
01/10/2023Fire-Resistant Penetrations and JointsRohit Misraspecial
08/25/2022MasonryEric Cowleyspecial
08/25/2022FinalEric Cowleyprogress
08/25/2022Structural Stability – Alterations of existing buildingsEric Cowleyspecial
06/22/2022Fire-Resistant Penetrations and JointsRohit Misraspecial
11/10/2021FinalDANNY TRUJILLOprogress
224 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account