ECB09/15/2010WORK W/O A PERMIT,HAVING INSTALLED A DRIVEWAY(PAVERS)W/O A PERMIT.DRIVEWAY LEADING FROM SIDEWALK UP TO SIDEYARD W/THE REMOVAL OF EARTH & VEGITATION IN A "NATURAL AREA" WITH A GRADE CHANGE.REMEDY:OBTAIN ALL NECENothing owed — awaiting certificate of correction
ECB04/02/2002WORK WITHOUT A PERMIT. WORK NOTED: IN THAT A NEW CONCRETE DRIVEWAY HAD BEEN INSTALLED ON LEFT SIDE OF BUILDING WITHOUT APPROVALS AND PERMITS. REMEDY: OBTAIN APPROVALS AND PERMITS IF FEASIBLE OR REMOVE ILLEGAL DNothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 0.18 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.