← Back
BuildNYC
Elevator apt, miscellaneous
Johnson (NYCHA)
1809 LEXINGTON AVENUE · BIN 1089898
💬 Discuss this project
1947Year Built
14Stories
D9Building Class
R7-2Zoning
502,522 sfGross Floor Area
595Units
LL97 Covered14 Active Violations 9 unresolved · 5 paperwork only ▸
Elevator apt, miscellaneous · Owner of record: NYC Housing Authority · 194,545 sf lot · 2.58 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNYCHA Johnson Houses Building 7 scaffoldUnder Construction68p · 1 filing · 20 docs
Floor 13New York City Housing Authority1p · 1 filing · 16 docs
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2New York City Housing Authority3p · 1 filing · 16 docs
Floor 1New York City Housing Authority4p · 1 filing · 16 docs
CellarNew York City Housing AuthorityUnder Construction85p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority6207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Lakhani & Jordan307/22/2025
Dseny Engineering Services108/28/2024
Rand Engineering & Architecture, DP808/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rand Engineering & Arch1603/21/2026
LWL Associates603/21/2026
Dseny Engineering Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kordun ConstructionGeneral Contractor1907/08/2026
Kordun ConstructionPlumbing807/08/2026
Kordun ConstructionScaffold207/08/2026
RNW ElectricElectrical103/21/2026
Blasko Elect'l ContractorsElectrical103/21/2026
Skountzos Plumbing & HeatingPlumbing107/08/2026
Prospect Electric ServiceElectrical103/21/2026
Trinity Metro ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106608/28/2024
Building Lifecycle
10/22/2026
Elevator Category 1 inspection report filed
09/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/18/2026
Permit expired, never signed off — Supported Scaffold
The city's record still shows this permit as issued, with no sign-off on its filing
M00484458-S1-SF
07/16/2026
Permit expired, never signed off — Structural
The city's record still shows this permit as issued, with no sign-off on its filing
M00484458-I1-MS
06/22/2026
Permit renewed — Structural
Renewed without changes
M00484458-I1-ST
114 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedKordun Construction06/22/2026
DOB NOWPlumbingPermit IssuedKordun Construction05/11/2026
DOB NOWStructuralPermit IssuedKordun Construction05/11/2026
DOB NOWBoiler EquipmentSigned-offKordun Construction11/20/2025
DOB NOWPlumbingSigned-offSkountzos Plumbing & Heating08/25/2025
DOB NOWSupported ScaffoldPermit IssuedKordun Construction07/18/2025
DOB NOWStructuralPermit IssuedKordun Construction07/16/2025
DOB NOWMechanical SystemsPermit IssuedKordun Construction06/12/2025
DOB NOWPlumbingPermit IssuedKordun Construction05/08/2025
DOB NOWGeneral ConstructionPermit IssuedKordun Construction04/29/2025
DOB NOWBoiler EquipmentSigned-offKordun Construction11/20/2024
DOB NOWSupported ScaffoldPermit IssuedKordun Construction09/06/2024
DOB NOWGeneral ConstructionPermit IssuedKordun Construction07/18/2024
DOB NOWMechanical SystemsPermit IssuedKordun Construction05/03/2024
DOB NOWPlumbingPermit IssuedKordun Construction05/01/2024
DOB NOWStructuralPermit IssuedKordun Construction04/17/2024
DOB NOWStructuralPermit IssuedKordun Construction04/05/2024
DOB NOWGeneral ConstructionPermit IssuedKordun Construction11/20/2023
DOB NOWBoiler EquipmentSigned-offKordun Construction11/20/2023
DOB NOWStructuralPermit IssuedKordun Construction04/22/2023
DOB NOWGeneral ConstructionPermit IssuedKordun Construction04/22/2023
DOB NOWMechanical SystemsPermit IssuedKordun Construction04/21/2023
DOB NOWBoiler EquipmentSigned-offKordun Construction04/20/2023
DOB NOWPlumbingPermit IssuedKordun Construction04/18/2023
BISOTISSUEDTycoon Construction02/19/2016
BISOTISSUEDTycoon Construction04/14/2015
BISPLISSUEDG & L Plumbing Co01/03/2013
BISEQISSUEDAdvanced Construction Equipment04/25/2012
BISEQISSUEDNavtech Construction03/30/2012
BISEQISSUEDNavtech Construction03/30/2012
BISOTISSUEDBeys Specialty12/28/2011
BISOTISSUEDBeys Specialty12/28/2011
BISPLISSUEDG & L Plumbing Co07/27/2011
BISEQISSUEDNavtech Construction03/24/2011
BISOTRE-ISSUEDBeys Specialty12/10/2010
BISEQISSUEDNavtech Construction06/29/2010
BISOTISSUEDBeys Specialty05/14/2010
BISEQISSUEDNavtech Construction04/21/2010
BISOTISSUEDNavillus Tile09/02/2008
BISOTISSUEDUtb-United Technology06/12/2008
+ 10 more permits on file
1 project · most recent 08/28/2024
Ventilation Systems
FiledStatusContractorScope
08/28/2024Permit IssuedKordun ConstructionVentilation Systems
2 projects · most recent 07/22/2025
Gas Water/Sanitary
FiledStatusContractorScope
07/22/2025Signed-offSkountzos Plumbing & HeatingGas
09/23/2021Permit IssuedKordun ConstructionGas, Water/Sanitary
5 projects · most recent 12/05/2025
General Wiring
FiledStatusContractorScope
12/05/2025CompleteTrinity Metro ElectricalGeneral Wiring
07/24/2024CompleteRNW ElectricGeneral Wiring
10/05/2021CompleteGilston Electrical ContngGeneral Wiring
04/06/2021CompleteTri-State Electrical & Mechanical IGeneral Wiring
11/24/2020Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
1 project · most recent 08/28/2024
Concrete
FiledStatusContractorScope
08/28/2024Permit IssuedKordun ConstructionConcrete
1 project · most recent 08/28/2024
Scaffold
FiledStatusContractorScope
08/28/2024Permit IssuedKordun ConstructionScaffold
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/21/2026Pass-Final Boiler Equipment InspectionPassView ↗
03/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/07/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
05/06/2025Pass-Final PL - UndergroundPassView ↗
11/08/2024Fail-Final Boiler Equipment InspectionFailView ↗
09/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/20/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
08/14/2023Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
11/29/2021HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
11/29/2021HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
11/29/2021Maintenance informationGEORGE GHEBRYALenergy_progress
11/29/2021Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
11/29/2021Heating SystemsGEORGE GHEBRYALspecial
09/22/2021Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
09/22/2021Chimneys and ventsGEORGE GHEBRYALspecial
09/22/2021Heating SystemsGEORGE GHEBRYALspecial
09/22/2021Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
09/22/2021Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
09/22/2021Post-installed AnchorsGEORGE GHEBRYALspecial
09/22/2021Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
09/22/2021Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
09/22/2021Mechanical SystemsGEORGE GHEBRYALspecial
09/22/2021Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
09/22/2021FinalGEORGE GHEBRYALprogress
09/22/2021Air barrier - visual inspectionGEORGE GHEBRYALenergy_progress
09/22/2021HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
09/22/2021Electrical motors and elevatorsGEORGE GHEBRYALenergy_progress
09/22/2021Interior lighting powerGEORGE GHEBRYALenergy_progress
09/22/2021HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
09/22/2021HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
09/22/2021Maintenance informationGEORGE GHEBRYALenergy_progress
09/22/2021Structural Steel - DetailsGEORGE GHEBRYALspecial
Latest 25 of 60.
206 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account