← Back
BuildNYC
Two stories - detached, small or mid-size
181-45 MIDLAND PARKWAY
QUEENS · BIN 4155868
💬 Discuss this project
1932Year Built
2Stories
A1Building Class
R1-2Zoning
3,840 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 28,900 sf lot · 0.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 28p · 1 filing · 20 docs
Floor 19p · 1 filing · 20 docs
Cellar11p · 1 filing · 20 docs
Site & exteriorConstruction fence installation9p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/06/2019$2.0M—Private party → Private party$521/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nasir J, Khanzada907/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nasir J. Khanzada1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
New York Resident GroupScaffold303/21/2026
New York Resident GroupGeneral Contractor203/21/2026
Plumbing P & HPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Nasir J. Khanzada1527807/06/2023
Triangle Inspection & Tes7495807/06/2023
Building Lifecycle
03/23/2026
Elevator Category 1 inspection report filed
04/16/2025
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
10/07/2024
Signed off — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH ALT 1 APPLICATION#421754818
Q00305167-I1
10/07/2024
Signed off — Alteration
Q00314461-I1
09/11/2023
Elevator Category 5 inspection report filed
47 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPlumbing P & H07/13/2022
DOB NOWPlumbingSigned-offPlumbing P & H01/07/2021
DOB NOWConstruction FenceSigned-offNew York Resident Group09/30/2020
BIS—ISSUEDNew York Resident Group01/03/2022
BIS—ISSUEDNew York Resident Group02/03/2021
BIS—ISSUEDNew York Resident Group11/02/2020
BIS—ISSUEDNew York Resident Group10/09/2020
2 projects · most recent 09/19/2024
General Wiring
FiledStatusContractorScope
09/19/2024CompleteCentrum ElectricGeneral Wiring
11/10/2020CompleteCentrum Electric—
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
06/27/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
06/27/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
06/27/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNasir Khanzadaspecial
06/27/2023Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
03/22/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNasir Khanzadaspecial
03/22/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
03/22/2023Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
03/22/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
02/10/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
02/10/2023Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
02/10/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNasir Khanzadaspecial
02/10/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
01/13/2023Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
01/13/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
01/13/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
01/13/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNasir Khanzadaspecial
03/19/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNasir Khanzadaspecial
03/19/2021Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
03/19/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
03/19/2021Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
133 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account