← Back
Two stories - detached, small or mid-size
181-52 ABERDEEN ROAD
QUEENS · BIN 4155860
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R1-2Zoning
5,480 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 181-52 ABERDEEN ROAD LLC · 5,029 sf lot · 1.09 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 23p · 2 filings · 20 docs
Floor 14p · 2 filings · 20 docs
Cellar3p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/08/2022$1.6M—— → —$299/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KING DAVID ARCHITECTURE PC305/30/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STELLAR INDUSTRIES INCGeneral Contractor107/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519205/30/2023
Building Lifecycle
All (54)Filed (3)Permit Issued (2)Violation (4)Inspection (8)Objection (18)Special Inspection (19)
09/02/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/23/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/14/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/06/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
06/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
06/06/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
06/06/2023
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
06/06/2023
Special inspection requirement — Fenestration areas
Younes Abouyaala
06/06/2023
Special inspection requirement — Interior lighting power
Younes Abouyaala
05/30/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATION TO AN EXISTING 1 FAMILY 2.5 STORY BUILDING.
Q08020411-P1
05/24/2023
Special inspection requirement — Fenestration areas
Younes Abouyaala
05/24/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
05/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
05/24/2023
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
05/24/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
05/24/2023
Special inspection requirement — Interior lighting power
Younes Abouyaala
05/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/19/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/16/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/07/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/22/2023
Permit issued — Plumbing
Q08020443-I1-PL
02/05/2023
Objection raised — Scope
02/05/2023
Objection resolved — Addressed
02/05/2023
Objection raised — Scope
02/05/2023
Objection resolved — Addressed
02/01/2023
Filed — Alteration
FLING PLUMBING WORK ON CELLAR, 1ST TO 2ND FLOOR, AND ATTIC IN CONJUNCTION WITH DOB JOB#Q08020411-I1. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q08020443-I1
01/31/2023
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
01/31/2023
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
01/31/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
01/31/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
01/31/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
12/15/2022
Permit issued — General Construction
Q08020411-I1-GC
11/30/2022
Objection resolved — Addressed
11/29/2022
Objection raised — Energy
11/22/2022
Objection resolved — Addressed
11/22/2022
Objection resolved — Addressed
11/22/2022
Objection resolved — Addressed
11/08/2022
Objection resolved — Addressed
11/08/2022
Objection resolved — Addressed
11/08/2022
Objection resolved — Addressed
11/02/2022
Objection raised — Admin
10/24/2022
Objection raised — Mechanical
10/24/2022
Objection raised — Mechanical
10/24/2022
Objection raised — Scope
10/24/2022
Objection raised — Scope
10/24/2022
Objection raised — Zoning
10/13/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION TO AN EXISTING 1 FAMILY 2.5 STORY BUILDING.
Q08020411-I1
08/14/2002
Violation issued (ECB, closed)
Construction
01/11/2002
Violation issued (ECB, closed)
Construction
01/11/2002
Violation issued (ECB, closed)
Construction
01/10/2002
Violation issued (ECB, closed)
Plumbing
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC02/22/2023
DOB NOWGeneral ConstructionPermit IssuedSTELLAR INDUSTRIES INC12/15/2022
BISPLISSUEDJODOM MECHANICAL, INC12/21/2004
BISOTISSUEDM.B.CONTRACTING08/28/2002
BISPLISSUEDRESPONSE PLG AND HEATING02/28/2002
BISOTISSUEDM.B.CONTRACTING09/17/2001
1 project · most recent 02/01/2023
Gas Water/Sanitary
FiledStatusContractorScope
02/01/2023Permit IssuedALL PRO PLBG & HTG INCGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/02/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/23/2023Fail-Final General Construction Non-Directive 14FailView ↗
06/14/2023Fail-Final General Construction Non-Directive 14FailView ↗
05/19/2023Fail-Final General Construction Non-Directive 14FailView ↗
05/16/2023Fail-Final General Construction Non-Directive 14FailView ↗
03/07/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/07/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
06/06/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
06/06/2023Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
06/06/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
06/06/2023Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
06/06/2023Fenestration air leakageYounes Abouyaalaenergy_progress
06/06/2023Fenestration areasYounes Abouyaalaenergy_progress
06/06/2023Interior lighting powerYounes Abouyaalaenergy_progress
05/24/2023Fenestration areasYounes Abouyaalaenergy_progress
05/24/2023Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
05/24/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
05/24/2023Fenestration air leakageYounes Abouyaalaenergy_progress
05/24/2023Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
05/24/2023Interior lighting powerYounes Abouyaalaenergy_progress
05/24/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
01/31/2023HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
01/31/2023HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
01/31/2023Maintenance informationYounes Abouyaalaenergy_progress
01/31/2023HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
01/31/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026Q08020411-P1Request digital key ↗
08/15/2026Q08020411-I1Request digital key ↗
08/14/2026Q08020443-I1Request digital key ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature15
08/29/2026Q08020411-I1Open ↗
08/29/2026Q08020411-I1Open ↗
08/29/2026Q08020411-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026Q08020411-I1Open ↗
08/29/2026Q08020411-I1Open ↗
08/22/2026Q08020411-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026Q08020411-I1Open ↗
08/25/2026Q08020411-P1Open ↗
08/13/2026Q08020443-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026Q08020411-P1Open ↗
08/15/2026Q08020411-I1Open ↗
08/13/2026Q08020443-I1Open ↗