Four families
181 BALTIC STREET
BROOKLYN · BIN 3003381
💬 Discuss this project
1839Year Built
3Stories
C3Building Class
R6Zoning
3,375 sfGross Floor Area
4Units
Rent Stabilized2 Open Violations ▸
Four families · Owner of record: 181 BALTIC LLC · 2,496 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction23p · 1 filing · 20 docs
Floor 3Under Construction44p · 2 filings · 20 docs
Floor 2Under Construction42p · 2 filings · 20 docs
Floor 1Under Construction43p · 2 filings · 20 docs
CellarUnder Construction45p · 2 filings · 20 docs
BasementUnder Construction42p · 2 filings · 20 docs
Sub-BasementUnder Construction4p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
181 BALTIC LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/11/2025$5.0M—— → —$1,481/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.1508/19/2026
MCHENERY TESTING LAB108/18/2026
YANG ENGINEERING LLC302/23/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRL SKYLINE INCGeneral Contractor707/08/2026
RRP PLUMBING CORPFire Protection107/08/2026
EMPIRE CITY CONSTRUCTIONGeneral Contractor108/20/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
RRP PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC56131308/19/2026
Building Lifecycle
All (143)Filed (17)Permit Issued (11)Signed Off (2)Violation (8)Inspection (6)Objection (69)Special Inspection (30)
09/14/2026
Signed off — Alteration CO
PROPOSED NEW SPRINKLER HEADS, SERVICES, DISTRIBUTION, DOMESTIC WATER AND FIRE SERVICE WITH BACKFLOW PREVENTERS, AND FDNY CONNECTION DISTRIBUTION.
B01200272-S2
09/14/2026
Signed off — Alteration
Submit temporary construction fence work at open space, in conjunction with Alt-CO application job#B01200272, no change in use, egress or occupancy.
B01219371-I1
08/28/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/19/2026
Filed — Alteration CO
PROPOSED NEW SPRINKLER HEADS, SERVICES, DISTRIBUTION, DOMESTIC WATER AND FIRE SERVICE WITH BACKFLOW PREVENTERS, AND FDNY CONNECTION DISTRIBUTION.
B01200272-P6
08/19/2026
Permit issued — Supported Scaffold
B01440508-I1-SF
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
08/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
08/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
08/18/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01440508-I1
07/24/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/13/2026
Objection resolved — Addressed
07/09/2026
Objection raised — Other
06/30/2026
Permit issued — General Construction
B01200272-I1-GC
06/26/2026
Filed — Alteration CO
PROPOSED NEW SPRINKLER HEADS, SERVICES, DISTRIBUTION, DOMESTIC WATER AND FIRE SERVICE WITH BACKFLOW PREVENTERS, AND FDNY CONNECTION DISTRIBUTION.
B01200272-P5
06/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
06/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
06/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
06/23/2026
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
05/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/01/2026
Violation issued (HPD, open)
A
04/27/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/17/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/15/2026
Permit issued — Construction Fence
B01219371-I1-FN
04/14/2026
Permit issued — Plumbing
B01200272-S3-PL
04/03/2026
Special inspection requirement — Structural Cold-Formed Steel
Fran Huang
04/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
04/03/2026
Special inspection requirement — Concrete - Cast-In-Place
Fran Huang
04/03/2026
Special inspection requirement — Masonry
Fran Huang
04/03/2026
Special inspection requirement — Final
Fran Huang
04/03/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Fran Huang
04/03/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Fran Huang
04/03/2026
Special inspection requirement — Structural Steel - Welding
Fran Huang
04/03/2026
Special inspection requirement — Structural Steel - Details
Fran Huang
03/20/2026
Filed — Alteration CO
PROPOSED NEW SPRINKLER HEADS, SERVICES, DISTRIBUTION, DOMESTIC WATER AND FIRE SERVICE WITH BACKFLOW PREVENTERS, AND FDNY CONNECTION DISTRIBUTION.
B01200272-P4
02/25/2026
Permit issued — Sprinklers
B01200272-S5-EW-SP
02/23/2026
Filed — Alteration CO
PROPOSED NEW SPRINKLER HEADS, SERVICES, DISTRIBUTION, DOMESTIC WATER AND FIRE SERVICE WITH BACKFLOW PREVENTERS, AND FDNY CONNECTION DISTRIBUTION.
B01200272-S3
02/20/2026
Filed — Alteration CO
PROPOSED NEW SPRINKLER HEADS, SERVICES, DISTRIBUTION, DOMESTIC WATER AND FIRE SERVICE WITH BACKFLOW PREVENTERS, AND FDNY CONNECTION DISTRIBUTION.
B01200272-S5
02/20/2026
Special inspection requirement — Post-installed Anchors
Fran Huang
02/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
02/20/2026
Special inspection requirement — Sprinkler Systems
Fran Huang
02/18/2026
Permit issued — Mechanical Systems
B01200272-S4-MS
02/12/2026
Filed — Alteration CO
PROPOSED NEW SPRINKLER HEADS, SERVICES, DISTRIBUTION, DOMESTIC WATER AND FIRE SERVICE WITH BACKFLOW PREVENTERS, AND FDNY CONNECTION DISTRIBUTION.
B01200272-S4
11/20/2025
Filed — Alteration CO
PROPOSED NEW SPRINKLER HEADS, SERVICES, DISTRIBUTION, DOMESTIC WATER AND FIRE SERVICE WITH BACKFLOW PREVENTERS, AND FDNY CONNECTION DISTRIBUTION.
B01200272-P3
11/18/2025
Violation issued (HPD, open)
I
11/04/2025
Special inspection requirement — Concrete - Cast-In-Place
Fran Huang
11/04/2025
Special inspection requirement — Masonry
Fran Huang
11/04/2025
Special inspection requirement — Structural Cold-Formed Steel
Fran Huang
11/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
11/04/2025
Special inspection requirement — Structural Steel - Details
Fran Huang
11/04/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Fran Huang
11/04/2025
Special inspection requirement — Structural Steel - Welding
Fran Huang
11/04/2025
Special inspection requirement — Final
Fran Huang
11/04/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Fran Huang
10/16/2025
Special inspection requirement — Concrete - Cast-In-Place
Fran Huang
10/08/2025
Filed — Alteration CO
PROPOSED NEW SPRINKLER HEADS, SERVICES, DISTRIBUTION, DOMESTIC WATER AND FIRE SERVICE WITH BACKFLOW PREVENTERS, AND FDNY CONNECTION DISTRIBUTION.
B01200272-P2
10/06/2025
Objection resolved — Addressed
10/06/2025
Objection resolved — Addressed
10/06/2025
Objection resolved — Addressed
Latest 60 of 143 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedEMPIRE CITY CONSTRUCTION08/19/2026
DOB NOWGeneral ConstructionPermit IssuedJRL SKYLINE INC06/30/2026
DOB NOWConstruction FenceSigned-offJRL SKYLINE INC04/15/2026
DOB NOWPlumbingPermit IssuedRRP PLUMBING CORP04/14/2026
DOB NOWSprinklersPermit IssuedRALPH W. LANDOLFI JR.02/25/2026
DOB NOWMechanical SystemsPermit IssuedJRL SKYLINE02/18/2026
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.09/09/2025
DOB NOWFoundationSigned-offJRL SKYLINE08/08/2025
DOB NOWStructuralSigned-offJRL SKYLINE08/05/2025
DOB NOWGeneral ConstructionPermit IssuedJRL SKYLINE07/22/2025
DOB NOWConstruction FenceSigned-offJRL SKYLINE05/07/2025
BISPLISSUEDVIGILANTA_CONTRACTOR08/26/1991
BIS—ISSUEDCOMINS INC.08/09/1991
1 project · most recent 08/19/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
08/19/2026Permit IssuedJRL SKYLINE INCHeating and Air Conditioning Systems, Ventilation Systems
2 projects · most recent 08/19/2026
Sprinkler System
FiledStatusContractorScope
08/19/2026Permit IssuedRRP PLUMBING CORPSprinkler System
05/29/2025——49 heads
1 project · most recent 05/11/2026
General Wiring
FiledStatusContractorScope
05/11/2026Permit IssuedCL ELECTRICAL CORPGeneral Wiring
2 projects · most recent 08/19/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/19/2026Permit IssuedJRL SKYLINE INCSteel, Concrete, Masonry
———1 scope_items
2 projects · most recent 08/18/2026
Scaffold Fence
FiledStatusContractorScope
08/18/2026Permit IssuedEMPIRE CITY CONSTRUCTIONScaffold
05/02/2025Signed-offJRL SKYLINE INCFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/28/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/24/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/27/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/17/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
08/19/2026Fire-Resistant Penetrations and JointsFran Huangspecial
08/19/2026Structural Stability – Alterations of existing buildingsFran Huangspecial
08/19/2026Energy Code Compliance InspectionsFran Huangprogress
08/19/2026Fire-Resistance Rated ConstructionFran Huangprogress
06/23/2026Fire-Resistance Rated ConstructionFran Huangprogress
06/23/2026Fire-Resistant Penetrations and JointsFran Huangspecial
06/23/2026Structural Stability – Alterations of existing buildingsFran Huangspecial
06/23/2026Energy Code Compliance InspectionsFran Huangprogress
04/03/2026Structural Cold-Formed SteelFran Huangspecial
04/03/2026Structural Stability – Alterations of existing buildingsFran Huangspecial
04/03/2026Concrete - Cast-In-PlaceFran Huangspecial
04/03/2026MasonryFran Huangspecial
04/03/2026FinalFran Huangprogress
04/03/2026Construction Operations Influencing Adjacent StructuresFran Huangspecial
04/03/2026Structural Steel - High Strength BoltingFran Huangspecial
04/03/2026Structural Steel - WeldingFran Huangspecial
04/03/2026Structural Steel - DetailsFran Huangspecial
02/20/2026Post-installed AnchorsFran Huangspecial
02/20/2026Fire-Resistant Penetrations and JointsFran Huangspecial
02/20/2026Sprinkler SystemsFran Huangspecial
11/04/2025Concrete - Cast-In-PlaceFran Huangspecial
11/04/2025MasonryFran Huangspecial
11/04/2025Structural Cold-Formed SteelFran Huangspecial
11/04/2025Structural Stability – Alterations of existing buildingsFran Huangspecial
11/04/2025Structural Steel - DetailsFran Huangspecial
Latest 25 of 36.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/22/2026B01203449-I1Request digital key ↗
08/22/2026B01200272-P6Request digital key ↗
08/22/2026B01200272-P4Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits13
▸DOB NOWLPC Approval/Permit13
08/22/2026B01200272-P4Open ↗
08/22/2026B01200272-S3Open ↗
08/21/2026B01200272-P6Open ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZoning Exhibit form (1-5)4
08/21/2026B01200272-P6Open ↗
08/15/2026B01200272-P5Open ↗
08/13/2026B01200272-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/22/2026B01203449-I1Open ↗
08/22/2026B01200272-S2Open ↗
08/22/2026B01200272-P5Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/12/2026B01200272-S5Open ↗
08/31/2026B01200272-S2Open ↗
08/29/2026B01200272-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026B01200272-S2Open ↗
08/29/2026B01200272-P3Open ↗
08/27/2026B01200272-P5Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/21/2026B01200272-P6Open ↗
08/15/2026B01200272-P1Open ↗
08/15/2026B01200272-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/22/2026B01200272-P4Open ↗
08/22/2026B01200272-S5Open ↗
08/22/2026B01200272-S4Open ↗
Showing 3 of 14 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWLandmark Approval1
08/13/2026B01200272-S3Open ↗
▸Other Documents10
▸DOB NOWProof of Historic Building6
08/21/2026B01200272-P6Open ↗
08/15/2026B01200272-P5Open ↗
08/13/2026B01203449-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification4
08/21/2026B01200272-P6Open ↗
08/15/2026B01200272-P1Open ↗
08/15/2026B01200272-I1Open ↗
Showing 3 of 4 on file for this type