ECB04/27/2026VIOLATION FOR ZONING RESOLUTION -FRONT YARD PLANTING : AT TIME OF INSPECTION ,OBSERVED PLANTING FROM THE ENTIRE FRONT YARD AT 183 BEECHWOOD AVE WAS REMOVED AND REPLACED WITH CONCRETE ,THIS IS AN R3A RESIDENTIALHearing held — result not yet published
ECB09/19/2014FAILURE TO MAINTAIN THE REQUIRED PERCENTAGE OF PLANTING AREA OF FRONT YARD BY INSTALLING A TWO CAR CONCRETE PARKING PAD. RMDY: MAINTAIN REQUIRED PERCENTAGE.Nothing owed — awaiting certificate of correction
Two family frame · 0.64 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.