← Back
BuildNYC
Condo, residential unit in 2-10 unit building
181 CARLTON AVENUE
BROOKLYN · Fort Greene · BIN 3058320
💬 Discuss this project
1901Year Built
4Stories
R1Building Class
R6BZoning
8,420 sfGross Floor Area
5Units
Rent Stabilized6 Active Violations ▸FDNY Report ↗
Condo, residential unit in 2-10 unit building · Owner of record: 181 Carlton · 4,267 sf lot · 1.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof22p · 4 filings · 20 docs
Penthouse2p · 1 filing · 3 docs
Floor 429p · 4 filings · 20 docs
Floor 334p · 4 filings · 20 docs
Floor 235p · 4 filings · 20 docs
Floor 134p · 4 filings · 20 docs
Cellar34p · 4 filings · 20 docs
Sub-Basement29p · 4 filings · 20 docs
Site & exterior24p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Lafayette2107/08/2026
181 Carlton703/21/2026
Shape Capital303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Shahrish Shuvo Engineering1002/15/2022
Kindo111/20/2020
AM Architecture103/09/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YBL NY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Crossfield Plumbing & Heatingspecialty_contractor907/08/2026
Borough ConstructionScaffold707/08/2026
Borough ConstructionGeneral Contractor703/22/2026
Borough Constructionspecialty_contractor303/21/2026
Midland ElectricalElectrical103/21/2026
718 Construction GroupGeneral Contractor102/05/2020
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Shahrish Consulting5702702/15/2022
Hudson Peaks Consulting8381106/02/2020
AR-Tech Engineering6659104/08/2020
Building Lifecycle
05/04/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
04/09/2024
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
11/17/2022
Signed off — Alteration
Filing Sprinkler application in conjunction with Alt 1 application 321588135.
B00339007-I1
11/04/2022
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
05/31/2022
Signed off — Alteration
Filing Plumbing application in conjunction with A1 application.
B00339005-I1
81 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating12/06/2021
DOB NOWMechanical SystemsSigned-offBorough Construction07/07/2021
DOB NOWConstruction FenceSigned-offBorough Construction06/08/2021
DOB NOWSprinklersSigned-offCrossfield Plumbing & Heating04/20/2021
DOB NOWSupported ScaffoldSigned-offBorough Construction12/09/2020
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating11/25/2020
DOB NOWStructuralSigned-offBorough Construction07/10/2020
DOB NOWConstruction FenceSigned-offBorough Construction03/10/2020
BIS—ISSUEDBorough Construction03/16/2021
BISOTISSUEDBorough Construction07/22/2020
BIS—ISSUEDBorough Construction06/10/2020
BISOTISSUED718 Construction Group02/05/2020
BISFSISSUEDGeorge Bassolino03/10/1992
BISFBISSUEDNU-Way Fuel Oil Burners02/14/1991
2 projects · most recent 10/25/2022
General Wiring
FiledStatusContractorScope
10/25/2022CompleteMidland ElectricalGeneral Wiring
10/21/2020CompleteKJK ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
02/23/2022Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
02/23/2022HVAC and service water heating equipment ALBERTO ROMANenergy_progress
02/23/2022HVAC and service water heating system controls ALBERTO ROMANenergy_progress
02/23/2022Energy Code Compliance InspectionsALBERTO ROMANprogress
02/23/2022HVAC insulation and sealing ALBERTO ROMANenergy_progress
01/27/2022Energy Code Compliance InspectionsShahrish Shuvoprogress
01/27/2022HVAC and service water heating equipment Shahrish Shuvoenergy_progress
01/27/2022HVAC insulation and sealing Shahrish Shuvoenergy_progress
01/27/2022HVAC and service water heating system controls Shahrish Shuvoenergy_progress
01/27/2022Fire-Resistant Penetrations and JointsShahrish Shuvospecial
10/28/2021Sprinkler SystemsRoni Ahmedspecial
10/28/2021Fire-Resistant Penetrations and JointsRoni Ahmedspecial
10/28/2021Post-installed AnchorsRoni Ahmedspecial
10/08/2021Fire-Resistant Penetrations and JointsShahrish Shuvospecial
10/08/2021Post-installed AnchorsShahrish Shuvospecial
10/08/2021Sprinkler SystemsShahrish Shuvospecial
10/01/2021HVAC and service water heating system controls Shahrish Shuvoenergy_progress
10/01/2021Fire-Resistant Penetrations and JointsShahrish Shuvospecial
10/01/2021Energy Code Compliance InspectionsShahrish Shuvoprogress
10/01/2021HVAC and service water heating equipment Shahrish Shuvoenergy_progress
10/01/2021HVAC insulation and sealing Shahrish Shuvoenergy_progress
02/23/2021HVAC insulation and sealing Shahrish Shuvoenergy_progress
02/23/2021HVAC and service water heating system controls Shahrish Shuvoenergy_progress
02/23/2021HVAC and service water heating equipment Shahrish Shuvoenergy_progress
02/23/2021Energy Code Compliance InspectionsShahrish Shuvoprogress
Latest 25 of 27.
168 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account