← Back
City university
Receiving Building
181 HALL OF FAME TERRACE · University Heights (North)-Fordham · BIN 2119433
💬 Discuss this project
1939Year Built
—Stories
W5Building Class
R5Zoning
15,654 sfGross Floor Area
1Units
1 Open Violation ▸
City university · 123,225 sf lot · 0.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Floor 17p · 3 filings · 20 docs
Site & exterior6p · 2 filings · 20 docs
Filed — no permit issued11p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DASNY607/08/2026
DORMITORY AUTHORITY STATE OF NY503/21/2026
CUNY503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES1103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VAHID HOTElectrical103/21/2026
NATIONWIDE MECHANICAL INCFire Protection107/08/2026
KING FREEZE MECHANICAL COGeneral Contractor107/08/2026
MAC FELDER INCPlumbing107/08/2026
Z-CAR-DScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106512/02/2021
Building Lifecycle
All (29)Filed (7)Permit Issued (4)Signed Off (4)Violation (1)Special Inspection (13)
06/11/2026
Filed — Alteration
FILING FOR INSTALLATION OF NEW HOT WATER FLOW METER AS PER PLANS. WORK INCLUDES PROVIDING A BTU METER TO MEASURE SUPPLY AND RETURN TEMPERATURE & TO RE-INSTALLED ALL DISTURBED PIPING, ASSOCIATED SUPPORT AND RE-INSULATE DISTURBED PIPING AS PER SPECIFICATION
X01250729-I1
11/13/2025
Filed — Alteration
INSTALLATION OF GAS BOOSTER PUMP IN OSP AS PER PLANS
X01282340-S1
11/06/2025
Filed — Alteration
INSTALLATION OF GAS BOOSTER PUMP IN OSP AS PER PLANS
X01282340-I1
09/04/2025
Special inspection requirement — Final
07/02/2025
Special inspection requirement — Metering
07/02/2025
Special inspection requirement — Energy Code Compliance Inspections
07/02/2025
Special inspection requirement — Final
07/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/02/2025
Special inspection requirement — Mechanical Systems
05/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/03/2023
Signed off — Alteration
MECHANICAL RELATED WORK AS PER DRAWINGS.
X00196048-I1
03/16/2023
Signed off — Alteration
X00603251-I1
01/26/2023
Signed off — Alteration
PLUMBING RELATED WORK FOR RENOVATION OF EXISTING BUILDING INCLUDING NEW FIRE SERVICE WITH DOMESTIC TAKEOFF, ELECTRIC HOT WATER HEATER, GAS SERVICE, AND ASSOCIATED PIPING DISTRIBUTION.
X00196156-I1
01/26/2023
Signed off — Alteration
FILING HEREWITH SPRINKLER LAYOUT FOR RENOVATION OF EXISTING BUILDING
X00196193-I1
12/06/2022
Permit issued — Sign
X00603251-I1-SG
09/13/2022
Permit issued — Plumbing
X00196156-I1-PL
08/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDUARDO LIEVANO
05/21/2022
Permit issued — Mechanical Systems
X00196048-I1-MS
12/02/2021
Filed — Alteration
X00603251-I1
09/30/2021
Special inspection requirement — Final
GEORGE GHEBRYAL
09/30/2021
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
09/30/2021
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
09/30/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
05/18/2021
Permit issued — Sprinklers
X00196193-I1-EW-SP
06/24/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDUARDO LIEVANO
06/24/2020
Special inspection requirement — Sprinkler Systems
EDUARDO LIEVANO
01/09/2020
Filed — Alteration
MECHANICAL RELATED WORK AS PER DRAWINGS.
X00196048-I1
01/09/2020
Filed — Alteration
PLUMBING RELATED WORK FOR RENOVATION OF EXISTING BUILDING INCLUDING NEW FIRE SERVICE WITH DOMESTIC TAKEOFF, ELECTRIC HOT WATER HEATER, GAS SERVICE, AND ASSOCIATED PIPING DISTRIBUTION.
X00196156-I1
01/09/2020
Filed — Alteration
FILING HEREWITH SPRINKLER LAYOUT FOR RENOVATION OF EXISTING BUILDING
X00196193-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offZ-CAR-D CORP12/06/2022
DOB NOWPlumbingSigned-offMAC FELDER INC09/13/2022
DOB NOWMechanical SystemsSigned-offKING FREEZE MECHANICAL CO05/21/2022
DOB NOWSprinklersSigned-offNATIONWIDE MECHANICAL INC05/18/2021
BIS—ISSUEDCONSTRUCTOMICS LLC04/05/2024
BIS—ISSUEDCONSTRUCTOMICS LLC04/05/2024
BISOTISSUEDCONSTRUCTOMICS LLC08/07/2020
BISEQISSUEDEMPIRE CONTROL ABATEMENT08/15/2013
BIS—ISSUEDAMG ENVIRONMENTL REST LLC05/14/2013
BISEQISSUEDAMG ENVIRONMENTL REST LLC05/10/2013
BISEQISSUEDAMG ENVIRONMENTL REST LLC02/05/2013
1 project · most recent 11/13/2025
Gas
FiledStatusContractorScope
11/13/2025——Gas
1 project · most recent 11/13/2023
General Wiring
FiledStatusContractorScope
11/13/2023CompleteCORZO ELECTL SYS CORPGeneral Wiring
1 project · most recent 11/13/2025
Concrete
FiledStatusContractorScope
11/13/2025——Concrete
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
09/04/2025Final—progress
07/02/2025Metering—energy_progress
07/02/2025Energy Code Compliance Inspections—progress
07/02/2025Final—progress
07/02/2025Fire-Resistant Penetrations and Joints—special
07/02/2025Mechanical Systems—special
08/02/2022Fire-Resistant Penetrations and JointsEDUARDO LIEVANOspecial
09/30/2021FinalGEORGE GHEBRYALprogress
09/30/2021Structural Steel - WeldingGEORGE GHEBRYALspecial
09/30/2021Structural Steel - DetailsGEORGE GHEBRYALspecial
09/30/2021Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
06/24/2020Fire-Resistant Penetrations and JointsEDUARDO LIEVANOspecial
06/24/2020Sprinkler SystemsEDUARDO LIEVANOspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
CUNY - Bronx Community CollegeEducation—
Project X00603251 Alteration · LOC Issued · 12/02/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 141 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch4
08/25/2026X00603251-I1Request digital key ↗
08/17/2026X01282340-S1Request digital key ↗
08/17/2026X01282340-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/26/2026X00196048-I1Request digital key ↗
08/15/2026X00196048-P2Request digital key ↗
08/14/2026X00196048-P1Request digital key ↗
▸Applications & Permits21
▸BISPLAN / WORK APPROVAL APPLICATION13
11/21/2023220712129Open ↗
12/13/2022220712129Open ↗
07/23/2020220725758Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION7
04/16/2024220712129Open ↗
08/07/2020220725758Open ↗
05/04/2020220712129Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/01/2021220712129Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISFINAL - TOPO STAMP TO VERIFY ADDRESS OF PROPERTY1
05/20/2024220712129Open ↗
▸Seals & Professional Certifications16
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
03/18/2020220712129Open ↗
03/11/2020220725758Open ↗
01/14/2020220712129Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/16/2026X01250729-I1Open ↗
08/13/2026X01282340-S1Open ↗
08/13/2026X00603251-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/23/2026X00603251-I1Open ↗
08/23/2026X00603251-I1Open ↗
08/23/2026X00603251-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026X00603251-I1Open ↗
▸Trade Schedules & Equipment1
▸BISELECTRIC CUT-OFF1
05/14/2013220255097Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST1
02/11/2020220712129Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
05/14/2013220255097Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/14/2013220255097Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
03/01/2013220255097Open ↗
▸Environmental & Asbestos12
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
08/07/2020220725758Open ↗
07/14/2020220725758Open ↗
04/06/2020220712129Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/16/2026X01250729-I1Open ↗
08/13/2026X00196156-P2Open ↗
08/13/2026X01282340-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS INSPECTION REPORT3
03/01/2013220255097Open ↗
03/01/2013220255097Open ↗
03/01/2013220255097Open ↗
▸BISRODENT CONTROL1
05/14/2013220255097Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/18/2020220712129Open ↗
03/09/2020220712129Open ↗
01/14/2020220712129Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/31/2022220712129Open ↗
▸BISLIGHTING CONTROLS1
12/15/2023220712129Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/15/2023220712129Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/31/2022220712129Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY16
03/03/2023220725758Open ↗
03/03/2023220725758Open ↗
03/03/2023220725758Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
07/30/2020220712129Open ↗
07/30/2020220712129Open ↗
07/30/2020220712129Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
04/11/2023220725758Open ↗
▸Approvals, Objections & Sign-offs26
▸BISLETTERS - SUPPORTING DOCUMENTATION8
05/04/2020220712129Open ↗
03/11/2020220725758Open ↗
08/08/2019220712129Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/16/2026X01250729-I1Open ↗
08/14/2026X00196156-P1Open ↗
08/13/2026X00196156-P2Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
03/01/2013220255097Open ↗
01/31/2013220249737Open ↗
05/21/2012220205864Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
12/13/2022220712129Open ↗
08/08/2019220712129Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/28/2023220249737Open ↗
04/11/2023220725758Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
05/14/2013220255097Open ↗
▸BISFINAL - FINAL CONSTRUCTION SIGNOFF DATED 12/09/2021 HAD EXPIRED ON 6/09/2023....NEED TO UPDATE FINAL CONSTRUCTION SIGNOFF1
—220712129Open ↗
▸BISFINAL ELECTRICAL SIGNOFF1
02/08/2024220712129Open ↗
▸BISFINAL - 2ND REQUEST FOR UPDATED FINAL CONSTRUCTION SIGNOFF THAT HAD EXPIRED ON 6/09/2024...NEED TO UPDATE FINAL CONSTRUCTION SIGNOFF1
05/28/2024220712129Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT8
03/03/2023220725758Open ↗
03/03/2023220725758Open ↗
02/10/2023220725758Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/15/2023220712129Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
07/14/2020220725758Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/14/2013220255097Open ↗
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET6
03/11/2020220725758Open ↗
08/08/2019220712129Open ↗
03/01/2013220255097Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION5
02/08/2024220712129Open ↗
07/14/2020220725758Open ↗
07/14/2020220725758Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸BISFINAL - NEED TO SUBMIT FINAL SURVEY. SURVEY SUBMITTED IS NOT THE FINAL SURVEY....ALSO SUBMIT AI-1 FORM TO GO ALONG WITH FINAL SURVEY1
05/28/2024220712129Open ↗
▸BISFINAL - SURVEY SUBMITTED SHOWS1
05/28/2024220712129Open ↗
▸BISFINAL - TAX MAP TO VERIFY BLOCK AND LOT OF PROPERTY1
05/20/2024220712129Open ↗