← Back
Two stories - detached, small or mid-size
181 HOPE AVENUE
STATEN ISLAND · Rosebank-Shore Acres-Park Hill · BIN 5044300
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R3AZoning
1,700 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 6,200 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Floor 219p · 1 filing · 20 docs
Floor 121p · 1 filing · 20 docs
Sub-Basement18p · 1 filing · 20 docs
Site & exterior23p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Z N J CONSTRUCTION303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RONALD D.VICTORIO R.A.610/23/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Z N J CONSTRUCTION INCGeneral Contractor607/08/2026
R. MCGLYNN PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738410/23/2025
Building Lifecycle
All (62)Filed (6)Permit Issued (7)Violation (3)Inspection (3)Objection (13)Special Inspection (30)
11/19/2025
Objection raised — Scope
10/23/2025
Filed — Alteration
Installation of PL fixtures, drain lines, water supply lines at BAS, 01 & 02 levels for kitchen enlargement & renovation of 2nd fl existing 3 fixture bathroom. Existing gas meter to provide new gas lines to stove & dryer at 1st fl level.
S01043783-P2
10/09/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
anthony santoro
10/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
10/09/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
10/09/2025
Special inspection requirement — Heating Systems
anthony santoro
10/09/2025
Special inspection requirement — Mechanical Systems
anthony santoro
10/09/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
10/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
anthony santoro
10/09/2025
Special inspection requirement — Subgrade Inspections
anthony santoro
10/09/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
10/09/2025
Special inspection requirement — Final
anthony santoro
10/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
10/09/2025
Special inspection requirement — Footing and Foundation
anthony santoro
10/09/2025
Special inspection requirement — Structural Wood Frame
anthony santoro
10/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
10/09/2025
Special inspection requirement — Maintenance information
anthony santoro
10/09/2025
Special inspection requirement — Air barrier - visual inspection
anthony santoro
10/09/2025
Special inspection requirement — Fenestration areas
anthony santoro
10/09/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
10/09/2025
Special inspection requirement — Permanent certificate
anthony santoro
10/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
10/09/2025
Special inspection requirement — Lighting in dwelling units
anthony santoro
10/09/2025
Special inspection requirement — Ventilation and air distribution system
anthony santoro
10/09/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
10/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
10/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
10/06/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
10/06/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
10/06/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
10/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
10/03/2025
Filed — Alteration
Installation of PL fixtures, drain lines, water supply lines at BAS, 01 & 02 levels for kitchen enlargement & renovation of 2nd fl existing 3 fixture bathroom. Existing gas meter to provide new gas lines to stove & dryer at 1st fl level.
S01043783-P1
09/18/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/30/2025
Violation issued (ECB, closed)
Unknown
05/30/2025
Violation issued (ECB, closed)
Construction
05/30/2025
Violation issued (ECB, closed)
Construction
05/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/03/2025
Permit issued — Plumbing
S01043783-S1-PL
02/18/2025
Permit issued — General Construction
S01043783-I1-FO
02/18/2025
Permit issued — General Construction
S01043783-I1-GC
02/18/2025
Permit issued — Earth Work
S01043783-I1-MS
02/18/2025
Permit issued — Mechanical Systems
S01043783-I1-EA
02/18/2025
Permit issued — Foundation
S01043783-I1-ST
02/14/2025
Permit issued — Construction Fence
S01043783-S3-FN
09/17/2024
Filed — Alteration
Installation of PL fixtures, drain lines, water supply lines at BAS, 01 & 02 levels for kitchen enlargement & renovation of 2nd fl existing 3 fixture bathroom. Existing gas meter to provide new gas lines to stove & dryer at 1st fl level.
S01043783-S3
09/17/2024
Filed — Alteration
Installation of PL fixtures, drain lines, water supply lines at BAS, 01 & 02 levels for kitchen enlargement & renovation of 2nd fl existing 3 fixture bathroom. Existing gas meter to provide new gas lines to stove & dryer at 1st fl level.
S01043783-S2
09/12/2024
Filed — Alteration
Installation of PL fixtures, drain lines, water supply lines at BAS, 01 & 02 levels for kitchen enlargement & renovation of 2nd fl existing 3 fixture bathroom. Existing gas meter to provide new gas lines to stove & dryer at 1st fl level.
S01043783-S1
09/04/2024
Objection resolved — Addressed
09/04/2024
Objection resolved — Addressed
08/13/2024
Objection resolved — Addressed
08/13/2024
Objection resolved — Addressed
08/13/2024
Objection resolved — Addressed
08/13/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Zoning
06/12/2024
Objection raised — Fire_Protection
06/12/2024
Objection raised — Scope
06/12/2024
Objection raised — Zoning
06/12/2024
Objection raised — Zoning
06/12/2024
Objection raised — Zoning
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offR. MCGLYNN PLUMBING CORP04/03/2025
DOB NOWGeneral ConstructionPermit IssuedZ N J CONSTRUCTION INC02/18/2025
DOB NOWGeneral ConstructionPermit IssuedZ N J CONSTRUCTION INC02/18/2025
DOB NOWEarth WorkPermit IssuedZ N J CONSTRUCTION INC02/18/2025
DOB NOWMechanical SystemsPermit IssuedZ N J CONSTRUCTION INC02/18/2025
DOB NOWFoundationPermit IssuedZ N J CONSTRUCTION INC02/18/2025
DOB NOWConstruction FencePermit IssuedZ N J CONSTRUCTION INC02/14/2025
1 project · most recent 10/23/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/23/2025Signed-offR. MCGLYNN PLUMBING CORPGas, Storm, Water/Sanitary
1 project · most recent 06/08/2025
General Wiring
FiledStatusContractorScope
06/08/2025CompleteRICHMOND ELEC'L CONTR'SGeneral Wiring
1 project · most recent 10/23/2025
Wood
FiledStatusContractorScope
10/23/2025Signed-offR. MCGLYNN PLUMBING CORPWood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/18/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
10/09/2025Exhaust and Vent Systems in Plenums and Ductsanthony santorospecial
10/09/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
10/09/2025Concrete - Cast-In-Placeanthony santorospecial
10/09/2025Heating Systemsanthony santorospecial
10/09/2025Mechanical Systemsanthony santorospecial
10/09/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
10/09/2025Structural Stability – Alterations of existing buildingsanthony santorospecial
10/09/2025Subgrade Inspectionsanthony santorospecial
10/09/2025Energy Code Compliance Inspectionsanthony santoroprogress
10/09/2025Finalanthony santoroprogress
10/09/2025Fire-Resistance Rated Constructionanthony santoroprogress
10/09/2025Footing and Foundationanthony santoroprogress
10/09/2025Structural Wood Frameanthony santoroprogress
10/09/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
10/09/2025Maintenance informationanthony santoroenergy_progress
10/09/2025Air barrier - visual inspectionanthony santoroenergy_progress
10/09/2025Fenestration areasanthony santoroenergy_progress
10/09/2025Insulation placement and R valuesanthony santoroenergy_progress
10/09/2025Permanent certificateanthony santoroenergy_progress
10/09/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
10/09/2025Lighting in dwelling unitsanthony santoroenergy_progress
10/09/2025Ventilation and air distribution systemanthony santoroenergy_progress
10/09/2025Fenestration air leakageanthony santoroenergy_progress
10/09/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
10/09/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
Latest 25 of 54.
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/18/2026S01043783-P2Request digital key ↗
08/18/2026S01043783-P1Request digital key ↗
08/18/2026S01043783-S3Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/18/2026S01043783-I1Open ↗
08/13/2026S01043783-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/18/2026S01043783-I1Open ↗
08/13/2026S01043783-P2Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/18/2026S01043783-S1Open ↗
08/13/2026S01043783-S3Open ↗
08/13/2026S01043783-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026S01043783-S1Open ↗
09/01/2026S01043783-S1Open ↗
08/25/2026S01043783-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026S01043783-S1Open ↗
08/25/2026S01043783-P2Open ↗
08/25/2026S01043783-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026S01043783-S1Open ↗
08/13/2026S01043783-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/18/2026S01043783-I1Open ↗
08/13/2026S01043783-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/18/2026S01043783-I1Open ↗
08/13/2026S01043783-P2Open ↗
▸DOB NOWPlot Diagram2
08/18/2026S01043783-I1Open ↗
08/13/2026S01043783-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S01043783-I1Open ↗