Four families
181 MESEROLE AVENUE
BROOKLYN · BIN 3065434
💬 Discuss this project
1930Year Built
2Stories
C3Building Class
R6BZoning
3,573 sfGross Floor Area
4Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Four families · Owner of record: 181 MESEROLE AVENUE LLC · 2,627 sf lot · 1.36 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivilGeneral
Floor 28p · 2 filings · 20 docs
Floor 17p · 1 filing · 17 docs
Cellar8p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLANK PROPERTY GROUP803/22/2026
181 MESEROLE AVENUE LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/20/2021$2.0M—Private party → 181 MESEROLE AVENUE LLC$560/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DIEGO AGUILERA ARCHITECTS P.C.408/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JULIAN ALBERTO GOMEZ403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMM GEN'L CONTRACTING INCPlumbing807/08/2026
AL-ARSH CONSTRUCTION CORPGeneral Contractor503/22/2026
LEONID SIMKINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252408/24/2022
Building Lifecycle
All (67)Filed (4)Permit Issued (3)Signed Off (2)Violation (16)Inspection (8)Objection (4)Special Inspection (30)
02/10/2026
Violation issued (HPD, closed)
C
05/15/2025
Violation issued (HPD, closed)
B
02/16/2025
Violation issued (HPD, closed)
C
02/16/2025
Violation issued (HPD, closed)
C
01/20/2025
Violation issued (HPD, closed)
C
01/20/2025
Violation issued (HPD, closed)
A
01/20/2025
Violation issued (HPD, closed)
A
01/20/2025
Violation issued (HPD, closed)
A
01/20/2025
Violation issued (HPD, closed)
A
01/20/2025
Violation issued (HPD, closed)
A
01/20/2025
Violation issued (HPD, closed)
C
06/29/2023
Violation issued (HPD, closed)
C
06/29/2023
Violation issued (HPD, closed)
A
05/01/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/24/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/24/2023
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
03/24/2023
Violation issued (HPD, closed)
A
11/28/2022
Signed off — Alteration
Interior renovation at 1st & 2nd Floor. Kitchen relocation and new bathrooms, new HVAC system. No changes in Use, Egress or Occupancy.
B00602979-I1
11/04/2022
Permit issued — Mechanical Systems
B00602979-I1-MS
10/31/2022
Signed off — Alteration
No Gas Job, Cap/Remove, all equipment-disconnected & remain in place: (Gas Boiler, Gas Meters). Renovate 4 existing bathrooms, relocate 4 kitchens. New 4 bathrooms, 4 new Wash & Dryer equipment. 4 new Water Heater at Cellar.
B00602435-I1
10/19/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/19/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/18/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/23/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/20/2022
Special inspection requirement — Heating Systems
INDARDEO PARBHUNATH
09/20/2022
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
09/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
09/20/2022
Special inspection requirement — Final
NAVEEN KUMAR
09/20/2022
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
09/20/2022
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
09/20/2022
Special inspection requirement — Interior lighting power
DIEGO AGUILERA
09/20/2022
Special inspection requirement — Lighting in dwelling units
DIEGO AGUILERA
09/20/2022
Special inspection requirement — HVAC-R and service water heating equipment
DIEGO AGUILERA
09/20/2022
Special inspection requirement — Exterior lighting power
DIEGO AGUILERA
09/20/2022
Special inspection requirement — Lighting controls
DIEGO AGUILERA
09/20/2022
Special inspection requirement — Fenestration areas
DIEGO AGUILERA
09/20/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
DIEGO AGUILERA
09/20/2022
Special inspection requirement — HVAC-R and service water heating system controls
DIEGO AGUILERA
09/20/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
DIEGO AGUILERA
09/19/2022
Objection resolved — Addressed
09/01/2022
Objection raised — Scope
08/24/2022
Filed — Alteration
Interior renovation at 1st & 2nd Floor. Kitchen relocation and new bathrooms, new HVAC system. No changes in Use, Egress or Occupancy.
B00602979-P1
08/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
08/24/2022
Special inspection requirement — Heating Systems
INDARDEO PARBHUNATH
08/24/2022
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
08/24/2022
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
08/24/2022
Special inspection requirement — Final
NAVEEN KUMAR
08/24/2022
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
08/24/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
DIEGO AGUILERA
08/24/2022
Special inspection requirement — HVAC-R and service water heating equipment
DIEGO AGUILERA
08/24/2022
Special inspection requirement — Interior lighting power
DIEGO AGUILERA
08/24/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
DIEGO AGUILERA
08/24/2022
Special inspection requirement — HVAC-R and service water heating system controls
DIEGO AGUILERA
08/24/2022
Special inspection requirement — Fenestration areas
DIEGO AGUILERA
08/24/2022
Special inspection requirement — Lighting controls
DIEGO AGUILERA
08/24/2022
Special inspection requirement — Lighting in dwelling units
DIEGO AGUILERA
08/24/2022
Special inspection requirement — Exterior lighting power
DIEGO AGUILERA
06/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/08/2022
Objection raised — Scope
06/08/2022
Objection resolved — Addressed
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedAL-ARSH CONSTRUCTION CORP11/04/2022
DOB NOWPlumbingSigned-offAMM GEN'L CONTRACTING INC04/20/2022
DOB NOWMechanical SystemsSigned-offAL-ARSH CONSTRUCTION CORP02/28/2022
1 project · most recent 09/08/2023
General Wiring
FiledStatusContractorScope
09/08/2023Permit IssuedLENS ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/01/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/24/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/24/2023Certified Sprinkler - SP - RoughingCertifiedView ↗
10/19/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/18/2022Pass-Final General Construction Non-Directive 14PassView ↗
09/23/2022Fail-Final General Construction Non-Directive 14FailView ↗
06/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
09/20/2022Heating SystemsINDARDEO PARBHUNATHspecial
09/20/2022Mechanical SystemsINDARDEO PARBHUNATHspecial
09/20/2022Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
09/20/2022FinalNAVEEN KUMARprogress
09/20/2022Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
09/20/2022Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
09/20/2022Interior lighting powerDIEGO AGUILERAenergy_progress
09/20/2022Lighting in dwelling unitsDIEGO AGUILERAenergy_progress
09/20/2022HVAC-R and service water heating equipmentDIEGO AGUILERAenergy_progress
09/20/2022Exterior lighting powerDIEGO AGUILERAenergy_progress
09/20/2022Lighting controlsDIEGO AGUILERAenergy_progress
09/20/2022Fenestration areasDIEGO AGUILERAenergy_progress
09/20/2022Fenestration and door U-factor and product ratingsDIEGO AGUILERAenergy_progress
09/20/2022HVAC-R and service water heating system controlsDIEGO AGUILERAenergy_progress
09/20/2022HVAC-R and service water piping design and insulationDIEGO AGUILERAenergy_progress
08/24/2022Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
08/24/2022Heating SystemsINDARDEO PARBHUNATHspecial
08/24/2022Mechanical SystemsINDARDEO PARBHUNATHspecial
08/24/2022Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
08/24/2022FinalNAVEEN KUMARprogress
08/24/2022Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
08/24/2022Fenestration and door U-factor and product ratingsDIEGO AGUILERAenergy_progress
08/24/2022HVAC-R and service water heating equipmentDIEGO AGUILERAenergy_progress
08/24/2022Interior lighting powerDIEGO AGUILERAenergy_progress
08/24/2022HVAC-R and service water piping design and insulationDIEGO AGUILERAenergy_progress
Latest 25 of 33.
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/31/2026B00602435-I1Request digital key ↗
08/28/2026B00602979-I1Request digital key ↗
08/15/2026B00602979-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature10
08/31/2026B00602979-P1Open ↗
08/31/2026B00602979-P1Open ↗
08/31/2026B00602979-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026B00602435-I1Open ↗
08/31/2026B00602435-P1Open ↗
08/28/2026B00602979-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026B00602979-P1Open ↗
08/28/2026B00602979-I1Open ↗
08/28/2026B00602435-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026B00602435-I1Open ↗
08/28/2026B00602979-I1Open ↗
08/15/2026B00602979-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00602979-I1Open ↗
08/13/2026B00602435-I1Open ↗