← Back
Police Department
181 UNION STREET
BROOKLYN · BIN 3004301
💬 Discuss this project
1961Year Built
2Stories
Y2Building Class
R6BZoning
14,984 sfGross Floor Area
0Units
9 Open Violations 8 unresolved · 1 paperwork only ▸FDNY Report ↗
Police Department · Owner of record: NYC POLICE DEPARTMENT · 15,450 sf lot · 0.97 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYPD607/08/2026
NYC DESIGN CONSTRUCTION503/21/2026
DEPT OF GENERAL SERVICES103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LIRO ENGINEERS, INC.212/19/2024
HIGH POINT ENGINEERING205/17/2024
HERBERT KUNSTADT ASSOCIATES, PC312/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
P WOLFE CONSULTANTS403/21/2026
HIGH POINT ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METRO ENVIRONMENTAL SRVCSGeneral Contractor404/08/2026
VARSITY PLBG AND HTG INCPlumbing207/08/2026
HUNTER ELECTRIC, INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106212/19/2024
HIGH POINT ENGINEERING1151205/17/2024
CROSSCHECK INSPECTION SER544312/13/2023
Building Lifecycle
All (69)Filed (7)Permit Issued (4)Signed Off (2)Violation (39)Inspection (3)Objection (2)Special Inspection (12)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/02/2025
Signed off — Alteration
REPLACEMENT OF 1 EXISTING BOILER WITH 2 NEW BOILERS. REPLACEMENT OF ASSOCIATED GAS PIPING FOR 2 NEW BOILERS.
B00791958-S2
05/12/2025
Signed off — Alteration
REPLACEMENT OF 1 EXISTING BOILER WITH 2 NEW BOILERS. REPLACEMENT OF ASSOCIATED GAS PIPING FOR 2 NEW BOILERS.
B00791958-I1
01/06/2025
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
01/06/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
01/06/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
01/06/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
12/19/2024
Filed — Alteration
REPLACEMENT OF 1 EXISTING BOILER WITH 2 NEW BOILERS. REPLACEMENT OF ASSOCIATED GAS PIPING FOR 2 NEW BOILERS.
B00791958-P4
12/09/2024
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
12/09/2024
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
12/09/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
12/09/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
11/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/29/2024
Permit issued — Plumbing
B00791958-S1-PL
05/23/2024
Violation issued (ECB, open)
Construction
05/20/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Lawrence O'Brien
05/17/2024
Filed — Alteration
REPLACEMENT OF 1 EXISTING BOILER WITH 2 NEW BOILERS. REPLACEMENT OF ASSOCIATED GAS PIPING FOR 2 NEW BOILERS.
B00791958-P3
05/02/2024
Permit issued — Support of Excavation
B00791958-S2-PM-SE
05/01/2024
Permit issued — General Construction
B00791958-I1-GC-CX
12/25/2023
Filed — Alteration
REPLACEMENT OF 1 EXISTING BOILER WITH 2 NEW BOILERS. REPLACEMENT OF ASSOCIATED GAS PIPING FOR 2 NEW BOILERS.
B00791958-S2
12/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
12/13/2023
Filed — Alteration
REPLACEMENT OF 1 EXISTING BOILER WITH 2 NEW BOILERS. REPLACEMENT OF ASSOCIATED GAS PIPING FOR 2 NEW BOILERS.
B00791958-P2
12/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
11/17/2023
Filed — Alteration
REPLACEMENT OF 1 EXISTING BOILER WITH 2 NEW BOILERS. REPLACEMENT OF ASSOCIATED GAS PIPING FOR 2 NEW BOILERS.
B00791958-P1
11/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
10/30/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/27/2023
Permit issued — Plumbing
B00791958-S1-PL
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/30/2023
Filed — Alteration
REPLACEMENT OF 1 EXISTING BOILER WITH 2 NEW BOILERS. REPLACEMENT OF ASSOCIATED GAS PIPING FOR 2 NEW BOILERS.
B00791958-S1
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/22/2022
Objection raised — Other
09/22/2022
Objection resolved — Addressed
09/20/2022
Filed — Alteration
REPLACEMENT OF 1 EXISTING BOILER WITH 2 NEW BOILERS. REPLACEMENT OF ASSOCIATED GAS PIPING FOR 2 NEW BOILERS.
B00791958-I1
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC07/29/2024
DOB NOWSupport of ExcavationSigned-offMETRO ENVIRONMENTAL SRVCS05/02/2024
DOB NOWGeneral ConstructionSigned-offMETRO ENVIRONMENTAL SRVCS05/01/2024
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC07/27/2023
BISMHISSUEDC. D. E. AIR-CONDITIONING05/01/2024
BISBLISSUEDWASOFF PLBG. & UTL.CO INC12/05/2023
BISBLISSUEDWASOFF PLBG. & UTL.CO INC08/30/2023
BISMHISSUEDC. D. E. AIR-CONDITIONING08/22/2023
BISBLISSUEDC. D. E. AIR-CONDITIONING01/20/2023
BISMHISSUEDC. D. E. AIR-CONDITIONING01/06/2023
BISOTISSUEDGEMSTAR CONSTRUCTION CORP.03/31/2014
BISFPISSUEDFIRE GUARD OF L. I. INC02/12/2014
BISOTISSUEDGEMSTAR CONSTRUCTION CORP.06/14/2013
BISMHISSUEDMARIC PLUMBING & HEATING03/02/2006
BISOTISSUEDMARIC PLUMBING & HEATING03/02/2006
BISPLISSUEDQUEENS, THE MECHANICAL CORP05/26/2004
BISPLISSUEDTHE PLUMBER CO INC04/14/2003
BISOTISSUEDTHE PLUMBER CO INC04/14/2003
BISPLISSUEDPIPESTYLISTS, INC11/22/2000
BISPLISSUEDPIPESTYLISTS, INC10/25/1999
BISFSISSUEDNICHOLAS A. CANTATORE08/25/1999
BISOTISSUEDLARRY E. TYREE, INC.08/24/1999
BISMHISSUEDCOASTAL MECHANICAL COSP05/28/1999
BISPLISSUEDAARON PLBG AND MECH SYST10/29/1998
BISOTISSUEDJV APPLEBAUM CONSTRUCTION CORP10/02/1998
BISOTISSUEDLARRY E TYREE CO. INC.04/22/1996
1 project · most recent 12/19/2024
Gas
FiledStatusContractorScope
12/19/2024Signed-offVARSITY PLBG AND HTG INCGas
3 projects · most recent 06/26/2024
General Wiring Lighting
FiledStatusContractorScope
06/26/2024CompleteHUNTER ELECTRIC, INC.General Wiring
02/07/2024Permit IssuedABSOLUTE ELEC'L CONTRG OFLighting
12/06/2022Permit IssuedLEVEST ELECTRIC CORP.General Wiring
1 project · most recent 12/19/2024
Concrete
FiledStatusContractorScope
12/19/2024Signed-offVARSITY PLBG AND HTG INCConcrete
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/30/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
01/06/2025Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
01/06/2025Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
01/06/2025Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
01/06/2025FinalGEORGE GHEBRYALprogress
12/09/2024Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
12/09/2024Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
12/09/2024Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
12/09/2024FinalGEORGE GHEBRYALprogress
05/20/2024Excavations - Sheeting, Shoring, and BracingLawrence O'Brienspecial
12/20/2023Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
12/01/2023Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
11/12/2023Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
▾Documents — 108 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/28/2026B00791958-P4Request digital key ↗
08/28/2026B00791958-P3Request digital key ↗
08/28/2026B00791958-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits12
▸BISWORK PERMIT APPLICATION8
12/06/2023340495306Open ↗
08/30/2023340495306Open ↗
08/25/2023340495306Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
02/05/2019340659521Open ↗
05/04/2017340495306Open ↗
11/29/2012320546780Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026B00791958-P2Open ↗
08/28/2026B00791958-P4Open ↗
08/28/2026B00791958-P3Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
05/27/2014320546771Open ↗
06/26/2013320546780Open ↗
06/26/2013320546780Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/26/2026B00791958-P4Open ↗
09/01/2026B00791958-P1Open ↗
08/31/2026B00791958-S1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
02/05/2019340659521Open ↗
05/04/2017340495306Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/26/2026B00791958-P4Open ↗
08/24/2026B00791958-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/29/2012320546780Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/29/2012320546780Open ↗
▸Trade Schedules & Equipment5
▸BISHEATING SYSTEMS1
09/23/2025340495306Open ↗
▸BISSCHEDULE B - PLUMBING1
02/05/2019340659521Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
09/23/2025340495306Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
09/23/2025340495306Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/04/2017340495306Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
07/19/2017340495306Open ↗
11/29/2012320546780Open ↗
11/21/2012320546771Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026B00791958-P4Open ↗
08/14/2026B00791958-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/28/2026B00791958-S1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
08/28/2025340495306Open ↗
01/06/2023340495306Open ↗
02/08/2019340495306Open ↗
Showing 3 of 5 on file for this type
▸BIS* HVAC INSULATION AND SEALING1
09/23/2025340495306Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/03/2012320546780Open ↗
▸BIS* DUCT LEAKAGE TESTING1
09/23/2025340495306Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/28/2025340495306Open ↗
01/06/2023340495306Open ↗
06/28/2018340495306Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION1
09/23/2025340495306Open ↗
▸BISMECHANICAL SYSTEMS1
09/23/2025340495306Open ↗
▸Approvals, Objections & Sign-offs21
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/13/2026B00791958-S1Open ↗
08/13/2026B00791958-I1Open ↗
08/13/2026B00791958-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)4
08/13/2026B00791958-S2Open ↗
08/13/2026B00791958-P4Open ↗
08/13/2026B00791958-I1Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
06/13/2014320546771Open ↗
06/13/2014320546771Open ↗
12/03/2012320546780Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST3
11/20/2014320546771Open ↗
06/13/2014320546771Open ↗
06/13/2014320546771Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
11/29/2012320546780Open ↗
11/21/2012320546771Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B00791958-I1Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B00791958-S1Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
02/08/2019340495306Open ↗
02/05/2019340659521Open ↗
05/04/2017340495306Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION6
02/15/2019340495306Open ↗
02/13/2019340659521Open ↗
02/08/2019340495306Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
02/05/2019340659521Open ↗
05/04/2017340495306Open ↗
▸Other Documents4
▸BISECCCNYS ANALYSIS1
02/08/2019340495306Open ↗
▸BISCHIMNEYS AND VENTS1
09/23/2025340495306Open ↗
▸BISSMOKE CONTROL SYSTEMS1
09/23/2025340495306Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00791958-S2Open ↗