← Back
BuildNYC
Elevator cooperative
Rosedale Gardens I
1810 BRUCKNER BOULEVARD · BIN 2092766
💬 Discuss this project
1958Year Built
15Stories
D4Building Class
R6Zoning
361,452 sfGross Floor Area
408Units
LL97 CoveredRent Stabilized39 Active Violations 37 unresolved · 2 paperwork only 1 likely answered ▸FISP: UNSAFE
Elevator cooperative · 350,840 sf lot · 1.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1Heavy duty sidewalk shed installation5p · 1 filing · 2 docs
Site & exteriorHeavy duty sidewalk shed for facade workUnder Construction6p · 1 filing · 4 docs
Filed — no permit issuedRosedale Gardens INC.10p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rosedale Gardens Co-Ops803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Queens312/02/2025
Devon Architects101/17/2024
Mje Professional Services112/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Xinos Construction403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Xinos ConstructionScaffold509/15/2026
Tower ElectricElectrical103/21/2026
Reliable EnterprisesScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Devon Architects356101/17/2024
Building Lifecycle
All (100)Filed (5)Permit Issued (6)Signed Off (1)Facade (FISP) (15)Violation (60)Objection (8)Special Inspection (5)
09/14/2026
Permit issued — Sidewalk Shed
X01034936-I1-SH
06/15/2026
Permit issued — Sidewalk Shed
X01034936-I1-SH
06/01/2026
Violation issued (HPD, open)
A
06/01/2026
Violation issued (HPD, closed)
B
03/16/2026
Permit issued — Sidewalk Shed
X01034936-I1-SH
01/23/2026
Cycle 9 facade report submitted
01/16/2026
Cycle 9 facade report signed — UNSAFE
01/09/2026
Cycle 9 facade inspection completed
12/02/2025
Filed — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01034936-P1
10/15/2025
Permit issued — Sidewalk Shed
X01034936-I1-SH
08/12/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00980413-I1
05/28/2025
Violation issued (ECB, open)
Elevators
02/20/2025
Violation issued (HPD, closed)
B
02/20/2025
Violation issued (HPD, closed)
B
02/20/2025
Violation issued (HPD, closed)
B
02/20/2025
Violation issued (HPD, closed)
A
02/20/2025
Violation issued (HPD, open)
C
02/20/2025
Violation issued (HPD, open)
A
02/20/2025
Violation issued (HPD, open)
A
02/20/2025
Violation issued (HPD, open)
A
02/20/2025
Violation issued (HPD, open)
B
02/20/2025
Violation issued (HPD, open)
C
02/20/2025
Violation issued (HPD, open)
C
02/20/2025
Violation issued (HPD, open)
C
02/20/2025
Violation issued (HPD, open)
C
02/20/2025
Violation issued (HPD, open)
C
02/20/2025
Violation issued (HPD, closed)
B
02/20/2025
Violation issued (HPD, closed)
B
05/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/22/2024
Objection raised — Inspections
04/22/2024
Objection raised — Scope
04/22/2024
Objection raised — Structural
04/22/2024
Objection raised — Scope
04/22/2024
Objection raised — Mechanical
04/22/2024
Objection raised — Scope
04/22/2024
Objection raised — Scope
04/22/2024
Objection raised — Fire_Protection
04/12/2024
Filed — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01034936-I1
04/12/2024
Permit issued — Sidewalk Shed
X01034936-I1-SH
04/11/2024
Filed — Alteration
proposed installation of a temporary construction fence as per plans submitted. work shall comply with 2020 building codes, chapter 33. no change in use, egress or occupancy.
X01034597-I1
02/27/2024
Violation issued (ECB, closed)
Construction
01/31/2024
Cycle 9 facade report signed — UNSAFE
01/31/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/30/2024
Cycle 9 facade report submitted
01/23/2024
Cycle 9 facade inspection completed
01/17/2024
Filed — Alteration
Work includes replacement of brick panels at various locations at all facades
X00946883-I1
01/07/2024
Special inspection requirement — Masonry
STEVE LANE
01/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
STEVE LANE
01/07/2024
Special inspection requirement — Tenant Protection Plan Compliance
STEVE LANE
01/07/2024
Special inspection requirement — Energy Code Compliance Inspections
STEVE LANE
01/07/2024
Special inspection requirement — Final
STEVE LANE
12/27/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00980413-I1
12/27/2023
Permit issued — Sidewalk Shed
X00980413-I1-SH
04/16/2021
Violation issued (HPD, closed)
A
07/01/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/01/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/13/2019
Cycle 8 facade report submitted
02/12/2019
Cycle 8 facade report signed — SAFE
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedXinos Construction09/14/2026
DOB NOWSidewalk ShedPermit IssuedXinos Construction06/15/2026
DOB NOWSidewalk ShedPermit IssuedXinos Construction03/16/2026
DOB NOWSidewalk ShedPermit IssuedXinos Construction10/15/2025
DOB NOWSidewalk ShedPermit IssuedXinos Construction04/12/2024
DOB NOWSidewalk ShedSigned-offReliable Enterprises12/27/2023
BISOTISSUEDFutura Builders Group04/27/2009
BISOTISSUEDFutura Builders Group04/27/2009
BISOTISSUEDFutura Builders Group12/17/2008
BISOTISSUEDFutura Builders Group06/01/2006
BISSPISSUEDNew MYSTY Crow Plumbing & Heating10/20/1992
2 projects · most recent 04/12/2024
FiledStatusContractorScope
04/12/2024Permit IssuedTower Electric—
12/27/2023Permit IssuedRichard Neu—
1 project · most recent 12/02/2025
FiledStatusContractorScope
12/02/2025Permit IssuedXinos Construction1 scope_items
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/07/2024MasonrySTEVE LANEspecial
01/07/2024Structural Stability – Alterations of existing buildingsSTEVE LANEspecial
01/07/2024Tenant Protection Plan ComplianceSTEVE LANEspecial
01/07/2024Energy Code Compliance InspectionsSTEVE LANEprogress
01/07/2024FinalSTEVE LANEprogress
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026X00980413-I1Request digital key ↗
08/21/2026X00946883-I1Request digital key ↗
08/21/2026X01034597-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION2
04/27/2009220002930Open ↗
12/17/2008210083452Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
04/21/2009220002930Open ↗
12/15/2008210083452Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026X00980413-I1Open ↗
08/21/2026X00946883-I1Open ↗
08/21/2026X01034597-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
01/05/2010220002930Open ↗
09/02/2009210083452Open ↗
04/21/2009220002930Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026X00946883-I1Open ↗
09/01/2026X00946883-I1Open ↗
09/01/2026X00946883-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/21/2009220002930Open ↗
12/15/2008210083452Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
04/21/2009220002930Open ↗
12/15/2008210083452Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026X00946883-I1Open ↗
09/01/2026X00946883-I1Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
04/21/2009220002930Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
12/15/2008210083452Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026X00946883-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/05/2010220002930Open ↗
09/02/2009210083452Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
04/21/2009220002930Open ↗
12/15/2008210083452Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/02/2009210083452Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
01/05/2010220002930Open ↗
09/02/2009210083452Open ↗
04/21/2009220002930Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
04/21/2009220002930Open ↗
12/15/2008210083452Open ↗