← Back
Five to six families
1815 WOODBINE STREET
QUEENS · Ridgewood · BIN 4082660
💬 Discuss this project
1906Year Built
3Stories
C2Building Class
R6BZoning
3,922 sfGross Floor Area
6Units
Rent Stabilized0 Open Violations
Five to six families · Owner of record: 1815 WOODBINE LP · 2,925 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof31p · 1 filing · 20 docs
Floor 340p · 1 filing · 20 docs
Floor 241p · 1 filing · 20 docs
Floor 140p · 1 filing · 20 docs
Cellar39p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PATOMA3107/08/2026
1815 WOODBINE LP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/09/2022$1.2M—— → —$306/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SALEH & ASSOCIATES810/31/2024
VERSATILE ENGINEERING, P.C.104/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KUSHNER STUDIOS903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PATOMA INCGeneral Contractor1207/08/2026
ORBIT SPRINKLER CORPFire Protection107/08/2026
ABRAMO LOUISGeneral Contractor103/21/2026
ORBIT PLBG HTGGeneral Contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY-WIDE TESTING INC416910/31/2024
Building Lifecycle
All (100)Filed (9)Permit Issued (7)Signed Off (4)Violation (16)Inspection (4)Objection (30)Special Inspection (30)
05/07/2026
Violation issued (HPD, closed)
A
06/12/2025
Violation issued (HPD, closed)
A
12/03/2024
Special inspection requirement — Fenestration air leakage
ELIAS RASABI
12/03/2024
Special inspection requirement — Metering
ELIAS RASABI
12/03/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ELIAS RASABI
12/03/2024
Special inspection requirement — Fenestration areas
ELIAS RASABI
12/03/2024
Special inspection requirement — Insulation placement and R values
ELIAS RASABI
12/03/2024
Special inspection requirement — Air barrier - visual inspection
ELIAS RASABI
12/03/2024
Special inspection requirement — Lighting in dwelling units
ELIAS RASABI
12/03/2024
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
12/03/2024
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
12/03/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ELIAS RASABI
12/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
12/02/2024
Violation issued (HPD, closed)
I
11/20/2024
Objection resolved — Addressed
11/12/2024
Objection raised — Structural
10/31/2024
Filed — Alteration CO
INSTALLATION OF NEW SPRINKLER SYSTEM AS INDICATED ON THE DRAWINGS FILED HEREIN.
Q00671958-P4
10/23/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ELIAS RASABI
10/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
10/23/2024
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
10/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
10/23/2024
Special inspection requirement — Lighting in dwelling units
ELIAS RASABI
10/23/2024
Special inspection requirement — Fenestration areas
ELIAS RASABI
10/23/2024
Special inspection requirement — Insulation placement and R values
ELIAS RASABI
10/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ELIAS RASABI
10/23/2024
Special inspection requirement — Fenestration air leakage
ELIAS RASABI
10/23/2024
Special inspection requirement — Metering
ELIAS RASABI
10/23/2024
Special inspection requirement — Air barrier - visual inspection
ELIAS RASABI
09/26/2024
Filed — Alteration CO
INSTALLATION OF NEW SPRINKLER SYSTEM AS INDICATED ON THE DRAWINGS FILED HEREIN.
Q00671958-P3
09/20/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ELIAS RASABI
09/20/2024
Special inspection requirement — Air barrier - visual inspection
ELIAS RASABI
09/20/2024
Special inspection requirement — Metering
ELIAS RASABI
09/20/2024
Special inspection requirement — Insulation placement and R values
ELIAS RASABI
09/20/2024
Special inspection requirement — Fenestration air leakage
ELIAS RASABI
09/20/2024
Special inspection requirement — Fenestration areas
ELIAS RASABI
09/20/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ELIAS RASABI
09/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
09/04/2024
Violation issued (HPD, closed)
B
09/04/2024
Violation issued (HPD, closed)
A
09/04/2024
Violation issued (HPD, closed)
A
08/31/2023
Filed — Alteration CO
INSTALLATION OF NEW SPRINKLER SYSTEM AS INDICATED ON THE DRAWINGS FILED HEREIN.
Q00671958-P2
08/31/2023
Signed off — Alteration CO
INSTALLATION OF NEW SPRINKLER SYSTEM AS INDICATED ON THE DRAWINGS FILED HEREIN.
Q00671958-S1
08/29/2023
Signed off — Alteration CO
INSTALLATION OF NEW SPRINKLER SYSTEM AS INDICATED ON THE DRAWINGS FILED HEREIN.
Q00671958-S2
08/22/2023
Signed off — Alteration CO
INSTALLATION OF NEW SPRINKLER SYSTEM AS INDICATED ON THE DRAWINGS FILED HEREIN.
Q00671958-S4
08/22/2023
Signed off — Alteration CO
INSTALLATION OF NEW SPRINKLER SYSTEM AS INDICATED ON THE DRAWINGS FILED HEREIN.
Q00671958-S3
08/15/2023
Filed — Alteration CO
INSTALLATION OF NEW SPRINKLER SYSTEM AS INDICATED ON THE DRAWINGS FILED HEREIN.
Q00671958-P1
08/08/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/27/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/20/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/06/2023
Permit issued — Mechanical Systems
Q00671958-S2-MS
02/06/2023
Permit issued — Structural
Q00671958-S4-ST
01/26/2023
Permit issued — General Construction
Q00671958-I1-GC
10/26/2022
Permit issued — Sprinklers
Q00671958-S3-EW-SP
08/03/2022
Permit issued — General Construction
Q00671958-I1-GC
07/27/2022
Permit issued — Structural
Q00671958-S4-ST
07/27/2022
Permit issued — Mechanical Systems
Q00671958-S2-MS
06/20/2022
Objection resolved — Addressed
06/20/2022
Objection resolved — Addressed
06/01/2022
Objection resolved — Addressed
06/01/2022
Objection resolved — Addressed
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPATOMA INC02/06/2023
DOB NOWStructuralSigned-offPATOMA INC02/06/2023
DOB NOWGeneral ConstructionPermit IssuedPATOMA INC01/26/2023
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP10/26/2022
DOB NOWGeneral ConstructionPermit IssuedPATOMA INC08/03/2022
DOB NOWStructuralSigned-offPATOMA INC07/27/2022
DOB NOWMechanical SystemsSigned-offPATOMA INC07/27/2022
1 project · most recent 10/31/2024
Sprinkler System
FiledStatusContractorScope
10/31/2024Signed-offORBIT SPRINKLER CORPSprinkler System
1 project · most recent 10/31/2024
Gas Water/Sanitary
FiledStatusContractorScope
10/31/2024——Gas, Water/Sanitary
2 projects · most recent 08/30/2023
General Wiring
FiledStatusContractorScope
08/30/2023CompleteINFINITY ELECTRIC, INC7 meters, 7 new_meters
01/16/2023CompleteINFINITY ELECTRIC, INCGeneral Wiring
1 project · most recent 10/31/2024
Steel Concrete Wood
FiledStatusContractorScope
10/31/2024Signed-offPATOMA INCSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/08/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/27/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/20/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/17/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
12/03/2024Fenestration air leakageELIAS RASABIenergy_progress
12/03/2024MeteringELIAS RASABIenergy_progress
12/03/2024Fenestration and door U-factor and product ratingsELIAS RASABIenergy_progress
12/03/2024Fenestration areasELIAS RASABIenergy_progress
12/03/2024Insulation placement and R valuesELIAS RASABIenergy_progress
12/03/2024Air barrier - visual inspectionELIAS RASABIenergy_progress
12/03/2024Lighting in dwelling unitsELIAS RASABIenergy_progress
12/03/2024Fire-Resistance Rated ConstructionELIAS RASABIprogress
12/03/2024Energy Code Compliance InspectionsELIAS RASABIprogress
12/03/2024Exterior Insulation and Finish Systems (EIFS)ELIAS RASABIspecial
12/03/2024Fire-Resistant Penetrations and JointsELIAS RASABIspecial
10/23/2024Exterior Insulation and Finish Systems (EIFS)ELIAS RASABIspecial
10/23/2024Fire-Resistant Penetrations and JointsELIAS RASABIspecial
10/23/2024Energy Code Compliance InspectionsELIAS RASABIprogress
10/23/2024Fire-Resistance Rated ConstructionELIAS RASABIprogress
10/23/2024Lighting in dwelling unitsELIAS RASABIenergy_progress
10/23/2024Fenestration areasELIAS RASABIenergy_progress
10/23/2024Insulation placement and R valuesELIAS RASABIenergy_progress
10/23/2024Fenestration and door U-factor and product ratingsELIAS RASABIenergy_progress
10/23/2024Fenestration air leakageELIAS RASABIenergy_progress
10/23/2024MeteringELIAS RASABIenergy_progress
10/23/2024Air barrier - visual inspectionELIAS RASABIenergy_progress
09/20/2024Fenestration and door U-factor and product ratingsELIAS RASABIenergy_progress
09/20/2024Air barrier - visual inspectionELIAS RASABIenergy_progress
09/20/2024MeteringELIAS RASABIenergy_progress
Latest 25 of 60.
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/26/2026Q00671958-P3Request digital key ↗
08/26/2026Q00671958-P2Request digital key ↗
08/26/2026Q00671958-S2Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
08/13/2026Q00671958-S1Open ↗
08/13/2026Q00671958-P1Open ↗
08/13/2026Q00671958-P3Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature11
09/27/2026Q00671958-S4Open ↗
09/01/2026Q00671958-P4Open ↗
09/01/2026Q00671958-P4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/27/2026Q00671958-S4Open ↗
09/01/2026Q00671958-P4Open ↗
09/01/2026Q00671958-P4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026Q00671958-P3Open ↗
08/26/2026Q00671958-P2Open ↗
08/26/2026Q00671958-I1Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/26/2026Q00671958-P3Open ↗
08/26/2026Q00671958-P2Open ↗
08/15/2026Q00671958-P4Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00671958-P2Open ↗
08/26/2026Q00671958-P3Open ↗
08/15/2026Q00671958-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/26/2026Q00671958-S2Open ↗
08/26/2026Q00671958-S3Open ↗
08/15/2026Q00671958-S4Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00671958-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification4
08/26/2026Q00671958-P3Open ↗
08/26/2026Q00671958-P2Open ↗
08/15/2026Q00671958-P4Open ↗
Showing 3 of 4 on file for this type