Miscellaneous educational facility
New Heights Academy Charter School
1818 AMSTERDAM AVENUE · BIN 1062155
💬 Discuss this project
1886Year Built
3.5Stories
W9Building Class
R7AZoning
66,720 sfGross Floor Area
11Units
LL97 Covered6 Active Violations 4 unresolved · 2 paperwork only 4 likely answered ▸
Miscellaneous educational facility · Owner of record: 1818-1838 Amsterdam Ave · 19,900 sf lot · 3.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNew Heights Academy1 filing · 6 docs
Floor 3New Heights Academy1 filing · 6 docs
Floor 2New Heights Academy1p · 1 filing · 2 docs
Floor 1New Heights AcademyUnder Construction17p · 4 filings · 16 docs
CellarNew Heights Academy1 filing · 6 docs
Site & exteriorNew Heights Academy10p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1818-1838 Amsterdam Ave8807/08/2026
Betancourt Properties803/21/2026
1818 1838 LLC603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DDT Engineering105/14/2026
AM Architect304/10/2026
Serdar Ceylan Architect212/05/2025
New York & Company109/15/2020
Green Design103/09/2020
Royal T&E106/19/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A K Expediting403/21/2026
Boyd Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ips PlumbingPlumbing707/08/2026
United King ConstructionScaffold407/08/2026
Maxco ContractingGeneral Contractor107/08/2026
Welldone InspectionsGeneral Contractor104/09/2026
Voltage Electrical ServiceElectrical103/21/2026
HT Plumbing & HeatingPlumbing106/27/2026
JJS BuildersScaffold107/08/2026
D & S ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R Design and Inspection6637107/09/2025
New York Engineers3868109/15/2020
Building Lifecycle
All (100)Filed (9)Permit Issued (7)Signed Off (2)Violation (60)Inspection (4)Objection (4)Special Inspection (14)
09/01/2026
Signed off — Alteration
Installation of a new commercial kitchen hood and duct work connecting to an existing exhaust duct to roof. as shown on plans. No change in use, egress or occupancy
M01229195-S1
07/31/2026
Signed off — Alteration
PLUMBING WORK IS FILED IN CONJUNCTION WITH CONSTRUCTION JOB #M01322254A PER PLANS SUBMITTED.
M01322290-I1
05/14/2026
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEMS IN EXISTING OFFICE SPACE AT THE FIRST FLOOR.
M01322254-S2
04/11/2026
Special inspection requirement — Sprinkler Systems
04/10/2026
Filed — Alteration
Installation of a new commercial kitchen hood and duct work connecting to an existing exhaust duct to roof. as shown on plans. No change in use, egress or occupancy
M01229195-P1
03/19/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/02/2026
Permit issued — Plumbing
M01322290-I1-PL
01/22/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/02/2026
Permit issued — General Construction
M01322254-I1-GC
12/23/2025
Objection resolved — Addressed
12/23/2025
Objection resolved — Addressed
12/22/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/22/2025
Objection raised — Admin
12/22/2025
Objection raised — Admin
12/05/2025
Filed — Alteration
PLUMBING WORK IS FILED IN CONJUNCTION WITH CONSTRUCTION JOB #M01322254A PER PLANS SUBMITTED.
M01322290-I1
12/05/2025
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEMS IN EXISTING OFFICE SPACE AT THE FIRST FLOOR.
M01322254-I1
12/05/2025
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
12/05/2025
Special inspection requirement — Insulation placement and R values
SERDAR CEYLAN
12/05/2025
Special inspection requirement — Lighting controls
SERDAR CEYLAN
12/05/2025
Special inspection requirement — Interior lighting power
SERDAR CEYLAN
12/05/2025
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
12/05/2025
Special inspection requirement — Final
SERDAR CEYLAN
12/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
12/03/2025
Permit issued — Plumbing
M01229195-S1-PL
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/21/2025
Permit issued — Mechanical Systems
M01229195-I1-MS
07/09/2025
Filed — Alteration
Installation of a new commercial kitchen hood and duct work connecting to an existing exhaust duct to roof. as shown on plans. No change in use, egress or occupancy
M01229195-S1
07/09/2025
Filed — Alteration
Installation of a new commercial kitchen hood and duct work connecting to an existing exhaust duct to roof. as shown on plans. No change in use, egress or occupancy
M01229195-I1
05/20/2025
Special inspection requirement — Mechanical Systems
Robert Truskosky
05/20/2025
Special inspection requirement — Final
Altagracia Martinez
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/09/2022
Violation issued (ECB, open)
Construction
02/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/24/2020
Violation issued (ECB, closed)
Elevators
10/01/2020
Violation issued (ECB, closed)
Construction
09/15/2020
Filed — Alteration
Replacement of 16 Roof top units & 1 split unit. Installation of 1 new VRF unit for IT room and new kitchen exhaust, makeup air, and kitchen hood for existing pantry equipment. no change to use, egress or occupancy.
M00344827-I1
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/07/2020
Permit issued — Sidewalk Shed
M00329104-I1-SH
04/27/2020
Special inspection requirement — Mechanical Systems
Michael Tobias
04/27/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Tobias
04/27/2020
Special inspection requirement — Heating Systems
Michael Tobias
04/27/2020
Special inspection requirement — Final
03/11/2020
Permit issued — Sidewalk Shed
M00329104-I1-SH
03/09/2020
Filed — Alteration
M00329104-I1
01/29/2020
Violation issued (ECB, open)
Construction
01/29/2020
Violation issued (ECB, closed)
Construction
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/19/2019
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00182328-I1
06/19/2019
Permit issued — Sidewalk Shed
M00182328-I1-SH
11/13/2018
Violation issued (ECB, closed)
Elevators
11/05/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/26/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/30/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/09/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHT Plumbing & Heating02/02/2026
DOB NOWGeneral ConstructionPermit IssuedWelldone Inspections01/02/2026
DOB NOWPlumbingSigned-offIps Plumbing12/03/2025
DOB NOWMechanical SystemsPermit IssuedMaxco Contracting10/21/2025
DOB NOWSidewalk ShedPermit IssuedUnited King Construction07/07/2020
DOB NOWSidewalk ShedPermit IssuedUnited King Construction03/11/2020
DOB NOWSidewalk ShedPermit IssuedJJS Builders06/19/2019
BISSPISSUEDMetro Fire Protection09/12/2012
BISMHISSUEDExcel Interior Construction08/01/2012
BISOTISSUEDExcel Interior Construction08/01/2012
BISOTISSUEDBetancourt Pro. Management04/23/2012
BISPLISSUEDThe Plumbing Company12/30/2011
BISPLISSUEDThe Plumbing Company12/20/2011
BISPLISSUEDPrime Piping & Heating09/27/2011
BISPLISSUEDPrime Piping & Heating09/27/2011
BISPLISSUEDTristate Plumbing Services07/29/2010
BISOTISSUEDExcel Interior Construction07/23/2010
BISPLISSUEDJeffrey Vulpis Plumbing06/30/2010
BISBLISSUEDJeffrey Vulpis Plumbing06/30/2010
BISOTISSUEDKel-Mar Designs05/25/2010
BISPLISSUEDJeffrey Vulpis Plumbing04/15/2010
BISPLISSUEDPrime Piping & Heating12/02/2009
BISSPISSUEDPrime Piping & Heating06/12/2009
BISPLISSUEDPrime Piping & Heating06/12/2009
BISOTISSUEDKel-Mar Designs05/21/2009
BISOTISSUEDKel-Mar Designs05/21/2009
BISPLISSUEDJeffrey Vulpis Plumbing02/17/2009
BISSPISSUEDTriangle Fire Protection01/09/2009
BISMHISSUEDKel-Mar Designs11/28/2008
BISOTISSUEDKel-Mar Designs11/28/2008
BISPLISSUEDTristate Plumbing Services10/29/2008
BIS—ISSUEDA Velez Company05/07/2008
BISPLISSUEDPrime Piping & Heating02/29/2008
BISMHISSUEDBetancourt Properties Management09/14/2007
BIS—ISSUEDExcel Interior Construction08/14/2007
BISPLISSUEDKapnag Heating & Plumbing06/28/2007
BISMHISSUEDExcel Interior Construction06/21/2007
BISOTISSUEDExcel Interior Construction06/21/2007
BISPLISSUEDPrime Piping & Heating06/15/2007
BISFPISSUEDMaster Fire Systems06/15/2007
+ 17 more permits on file
3 projects · most recent 05/14/2026
Air Conditioning Systems Others Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/14/2026Permit IssuedWelldone InspectionsAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-SM48NL 48,000 BTU · Heat Pump Outdoor ×2
04/10/2026Permit IssuedMaxco ContractingOthers
Other
__Junk__ NA 1 BTU · Kitchen Exhaust ×1
09/15/2020——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Johnson Controls J10ZFN24R2D1FAA1A3 15 tons · Rooftop Unit ×7
J10ZFN24RCD1BAA1A3 10 tons · Rooftop Unit ×2
J25ZJN30R2D1BAAA1 25 tons · Rooftop Unit ×2
J07YCC00A2AAA5 7 tons · Rooftop Unit ×1
J12ZJN24D2A1FAA1A1 10 tons · Rooftop Unit ×1
J15ZFN30D2A1FAA1A1 15 tons · Rooftop Unit ×1
J1OZFN24RCD1BAA1A3 10 tons · Rooftop Unit ×1
J25ZJN30R2D1BAA1A1 25 tons · Rooftop Unit ×1
JI0ZFN24R2D1FAA1A3 10 tons · Rooftop Unit ×1
— J07NLC00B2AA2 96,000 BTU · Condensing Unit ×1
Heating
Johnson Controls J10ZFN24R2D1FAA1A3 15 tons · Rooftop Unit ×7
J10ZFN24RCD1BAA1A3 10 tons · Rooftop Unit ×2
J25ZJN30R2D1BAAA1 25 tons · Rooftop Unit ×2
J12ZJN24D2A1FAA1A1 10 tons · Rooftop Unit ×1
J15ZFN30D2A1FAA1A1 15 tons · Rooftop Unit ×1
J1OZFN24RCD1BAA1A3 10 tons · Rooftop Unit ×1
J25ZJN30R2D1BAA1A1 25 tons · Rooftop Unit ×1
JI0ZFN24R2D1FAA1A3 10 tons · Rooftop Unit ×1
Ventilation
Lg ARNU243SKA4 24 tons · Vrf Indoor ×1
ARUNO24GSS4 2 tons · Vrf Outdoor ×1
1 project · most recent 05/14/2026
FiledStatusContractorScope
05/14/2026——21 heads
2 projects · most recent 04/10/2026
Water/Sanitary Gas
FiledStatusContractorScope
04/10/2026Signed-offIps PlumbingGas, Water/Sanitary
12/05/2025Signed-offHT Plumbing & HeatingWater/Sanitary
3 projects · most recent 01/29/2026
General Wiring
FiledStatusContractorScope
01/29/2026Permit IssuedVoltage Electrical ServiceGeneral Wiring
03/09/2020Permit IssuedRichard Neu—
06/19/2019Permit IssuedRichard Neu—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
04/11/2026Sprinkler Systems—special
12/05/2025Energy Code Compliance InspectionsSERDAR CEYLANprogress
12/05/2025Insulation placement and R valuesSERDAR CEYLANenergy_progress
12/05/2025Lighting controlsSERDAR CEYLANenergy_progress
12/05/2025Interior lighting powerSERDAR CEYLANenergy_progress
12/05/2025Energy Code Compliance InspectionsSERDAR CEYLANprogress
12/05/2025FinalSERDAR CEYLANprogress
12/05/2025HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
05/20/2025Mechanical SystemsRobert Truskoskyspecial
05/20/2025FinalAltagracia Martinezprogress
04/27/2020Mechanical SystemsMichael Tobiasspecial
04/27/2020Fire-Resistant Penetrations and JointsMichael Tobiasspecial
04/27/2020Heating SystemsMichael Tobiasspecial
04/27/2020Final—progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
New Heights AcademyEducationEntire building
Project M01322254 Alteration · Permit Entire · 12/05/2025
Project M01322290 Alteration · LOC Issued · 12/05/2025
Project M01229195 Alteration · Permit Entire · 07/09/2025
Project M00344827 Alteration · Approved · 09/15/2020
Project M00329104 Alteration · Permit Entire · 03/09/2020
Project M00182328 Alteration · Permit Entire · 06/19/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 397 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch6
08/20/2026M01322290-I1Request digital key ↗
08/20/2026M01322254-S2Request digital key ↗
08/20/2026M01322254-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00182328-I1Request digital key ↗
09/05/2026M00329104-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00344827-I1Request digital key ↗
▸Applications & Permits83
▸BISPLAN / WORK APPROVAL APPLICATION42
07/31/2014122026422Open ↗
07/31/2014122026422Open ↗
06/06/2014122026422Open ↗
Showing 3 of 42 on file for this type
▸BISWORK PERMIT APPLICATION29
09/14/2012121143244Open ↗
08/06/2012121081480Open ↗
08/06/2012121081480Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWLPC Approval/Permit6
08/17/2026M01229195-P1Open ↗
08/13/2026M01229195-S1Open ↗
08/13/2026M01322254-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPLACE OF ASSEMBLY5
09/04/2015110389883Open ↗
04/27/2012110389883Open ↗
03/26/2010110389883Open ↗
Showing 3 of 5 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
04/03/2012110033179Open ↗
▸Seals & Professional Certifications87
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION49
12/13/2012121081480Open ↗
12/13/2012121081480Open ↗
12/13/2012121081480Open ↗
Showing 3 of 49 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
09/12/2011120808714Open ↗
09/09/2011120808705Open ↗
07/22/2010120410475Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/05/2026M00182328-I1Open ↗
09/05/2026M00329104-I1Open ↗
08/20/2026M01322254-S2Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
09/12/2011120808714Open ↗
09/09/2011120808705Open ↗
07/22/2010120410475Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026M01229195-I1Open ↗
09/05/2026M01322290-I1Open ↗
09/05/2026M01322290-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026M01229195-I1Open ↗
08/22/2026M00344827-I1Open ↗
08/22/2026M00344827-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment64
▸BISSCHEDULE B - PLUMBING26
07/24/2012121143244Open ↗
09/12/2011120808714Open ↗
09/09/2011120808705Open ↗
Showing 3 of 26 on file for this type
▸BISSELF-CERT PLUMBING NOTICE21
10/26/2012121143244Open ↗
10/09/2012121143244Open ↗
03/22/2012120808705Open ↗
Showing 3 of 21 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
04/03/2013120948065Open ↗
03/01/2013120948065Open ↗
05/09/2012110286798Open ↗
Showing 3 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-855
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT2
06/15/2011110339526Open ↗
03/01/2010110324818Open ↗
▸BISEQUIPMENT USE PERMITS2
06/15/2011110339526Open ↗
03/03/2010110324818Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
12/13/2010120254009Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/26/2010120254009Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
09/12/2011120808714Open ↗
09/09/2011120808705Open ↗
07/22/2010120410475Open ↗
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00329104-I1Open ↗
▸Environmental & Asbestos23
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
01/26/2010120254009Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/20/2026M01322254-S2Open ↗
08/17/2026M01229195-P1Open ↗
08/13/2026M01322254-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
09/12/2011120808714Open ↗
Showing 1 of 4 on file for this type
▸BISASBESTOS INSPECTION REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)2
08/03/2012121143244Open ↗
07/12/2012121081480Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00344827-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
12/13/2012121081480Open ↗
12/13/2012121081480Open ↗
12/13/2012121081480Open ↗
Showing 3 of 8 on file for this type
▸BISEN2 - As Built Energy Analysis2
12/13/2012121081480Open ↗
12/13/2012121081480Open ↗
▸BISTR8: Energy Code Progress Inspections1
08/06/2012121081480Open ↗
▸Approvals, Objections & Sign-offs55
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST20
04/03/2013120948065Open ↗
12/13/2012121081480Open ↗
05/09/2012110286798Open ↗
Showing 3 of 20 on file for this type
▸BISADMINISTRATIVE OBJECTIONS16
08/03/2012120948065Open ↗
07/24/2012121143244Open ↗
07/12/2012121081480Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
09/10/2012121143244Open ↗
04/27/2012120808714Open ↗
04/03/2012110033179Open ↗
Showing 3 of 11 on file for this type
▸BISLANDMARKS APPROVAL6
12/13/2012121081480Open ↗
08/02/2012121081480Open ↗
08/01/2011120254009Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER2
01/05/2012120808705Open ↗
12/23/2011120808714Open ↗
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT31
06/06/2014122026422Open ↗
04/03/2013120948065Open ↗
12/13/2012121081480Open ↗
Showing 3 of 31 on file for this type
▸Filing & Intake Forms19
▸BISEFILING COVER SHEET14
06/06/2014122026422Open ↗
08/03/2012120948065Open ↗
07/24/2012121143244Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION5
09/04/2015110389883Open ↗
Showing 1 of 5 on file for this type
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
05/09/2012110286798Open ↗
04/27/2012120808714Open ↗
04/25/2012110033179Open ↗
Showing 3 of 7 on file for this type
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT1
05/02/2011120254009Open ↗
▸BISSupporting Document: Fee Exempt1
03/01/2010110324818Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
09/05/2026M00182328-I1Open ↗