💬 Discuss this project
1958Year Built
6Stories
D4Building Class
R7AZoning
152,466 sfGross Floor Area
134Units
LL97 CoveredRent Stabilized16 Active Violations 1 likely answered 1 old, status unconfirmed ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: 1818 Newkirk Owners Co · 44,563 sf lot · 3.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofEbmg LLCUnder Construction4p · 1 filing · 8 docs
Floor 6Interior removals and new partitions1p · 1 filing · 4 docs
Floor 5Unit 5P, Unit 5W24p · 4 filings · 20 docs
Floor 4
Floor 3
Floor 2
Floor 1Structural work6p · 2 filings · 14 docs
CellarGeneral construction interior renovation18p · 1 filing · 6 docs
Sub-BasementEbmg LLC7p · 1 filing · 18 docs
Site & exteriorEbmg LLCUnder Construction9p · 2 filings · 10 docs
Filed — no permit issuedEbmg LLC1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1818 Newkirk Avenue Owners2703/22/2026
Ebmg2207/08/2026
Motion Sports Medicine607/08/2026
KNG Construction103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
George J. Xerakias, PE107/21/2025
Bone/Levine Architects106/19/2025
Ashraf105/20/2025
Laurence G. Jones Architects204/21/2025
Christies104/11/2025
Rosenthal207/22/2024
2 Plus 3 Architects211/09/2023
Robert Strong Architect307/19/2023
Bromley Caldari Architects101/03/2023
CL Engineering102/17/2021
Jock Deboer, AIA109/14/2020
Haider Engineering, P.E107/19/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A+ Expediting203/21/2026
Sam Mather Architect403/21/2026
Haider Engineering, P.E103/21/2026
HS Design Studio203/21/2026
Municipal Building Consultants403/21/2026
Socotec203/21/2026
Haider Engineering P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HKS ConstructionScaffold603/21/2026
A101 CONSTRUCTION+DESIGNGeneral Contractor307/08/2026
Phoenix Sutton STRScaffold308/13/2026
T.N.T. Plumbing & HeatingPlumbing203/22/2026
Cattro Consulting GroupGeneral Contractor207/08/2026
KNG Construction CoGeneral Contractor203/21/2026
Andrew Maas CarpentryGeneral Contractor107/08/2026
Pasquale QuaratinoPlumbing107/08/2026
American Power Electric ConsElectrical103/22/2026
MBC ConstructionGeneral Contractor107/08/2026
Electrical SecurityElectrical103/22/2026
Einstein ElectricalElectrical103/22/2026
Advanced Plumbing MechanicalPlumbing107/08/2026
Backflow Prevention of NYPlumbing107/08/2026
Qec Electrical SvceElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sag Engineering & Consulting608106/19/2025
Bone/Levine Architects307106/19/2025
Laurence G. Jones Architects5560304/21/2025
Christie Engineering5795104/11/2025
Integrity Consulting Service666407/22/2024
Robert Strong Architect4884307/19/2023
Jock Deboer, AIA - Sia7008109/14/2020
Building Lifecycle
All (157)Filed (17)Permit Issued (14)Signed Off (7)Facade (FISP) (12)Violation (60)Inspection (7)Objection (10)Special Inspection (30)
08/12/2026
Permit issued — Sidewalk Shed
B01227364-I1-SH
06/17/2026
Permit issued — General Construction
B01222499-I1-GC
06/09/2026
Signed off — Alteration
GENERAL CONSTRUCTION WORK CONSISTING OF INTERIOR RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B01116274-I1
05/18/2026
Permit issued — Sidewalk Shed
B01227364-I1-SH
03/24/2026
Violation issued (ECB, closed)
Construction
07/21/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
B01230945-I1
06/19/2025
Filed — Alteration
PARAPET RECONSTRUCTION AS PER PLANS FILED HEREWITH, NO CHANGE TO USE, EGRESS OR OCCUPANCY
B01222499-I1
06/19/2025
Special inspection requirement — Masonry
Kevin Bone
06/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Kevin Bone
05/22/2025
Signed off — Alteration
STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B01208801-I1
05/20/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01227364-I1
05/20/2025
Permit issued — Sidewalk Shed
B01227364-I1-SH
05/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
Chester Kowalski
05/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chester Kowalski
05/07/2025
Special inspection requirement — Final
Kevin Bone
04/29/2025
Permit issued — Structural
B01208801-I1-ST
04/21/2025
Filed — Alteration
GENERAL CONSTRUCTION WORK CONSISTING OF INTERIOR RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B01116274-P1
04/11/2025
Filed — Alteration
STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B01208801-I1
04/10/2025
Special inspection requirement — Final
RICHARD CHRISTIE
04/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
Laurence Jones
04/10/2025
Special inspection requirement — Structural Steel - Details
RICHARD CHRISTIE
04/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD CHRISTIE
04/10/2025
Special inspection requirement — Post-installed Anchors
RICHARD CHRISTIE
04/10/2025
Special inspection requirement — Structural Steel - High Strength Bolting
RICHARD CHRISTIE
04/10/2025
Special inspection requirement — Structural Steel - Welding
RICHARD CHRISTIE
01/22/2025
Violation issued (HPD, open)
C
10/16/2024
Permit issued — General Construction
B01116274-I1-GC
10/04/2024
Filed — Alteration
GENERAL CONSTRUCTION WORK CONSISTING OF INTERIOR RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B01116274-I1
08/28/2024
Signed off — Alteration
APARTMENT 5P: PLUMBIING WORK IN KITCHEN AND BATHROOM AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08040520-I1
08/16/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/07/2024
Signed off — Alteration
RENOVATE EXISTING APARTMENT 5P: KITCHEN, BATHROOM, MINOR INTERIOR DEMOLITION, NEW PARTITIONS, FLOORING AND FINISHES AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08040481-I1
07/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
07/22/2024
Filed — Alteration
APARTMENT 5P: PLUMBIING WORK IN KITCHEN AND BATHROOM AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08040520-P1
07/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
06/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/01/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/08/2023
Permit issued — General Construction
B08040481-I1-GC
12/06/2023
Permit issued — Plumbing
B08040520-I1-PL
11/28/2023
Special inspection requirement — Lighting in dwelling units
Heather Roslund
11/28/2023
Special inspection requirement — Energy Code Compliance Inspections
Heather Roslund
11/28/2023
Special inspection requirement — Final
Heather Roslund
11/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
11/21/2023
Objection raised — Scope
11/21/2023
Objection resolved — Addressed
11/09/2023
Filed — Alteration
RENOVATE EXISTING APARTMENT 5P: KITCHEN, BATHROOM, MINOR INTERIOR DEMOLITION, NEW PARTITIONS, FLOORING AND FINISHES AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08040481-P1
08/15/2023
Violation issued (FDNY_NOV, closed)
08/02/2023
Signed off — Alteration
INSTALLATION OF WASHERS AND DRYERS IN BASEMENT LAUNDRY ROOM FOR USE OF MDL TENANTS. NO CHANGE TO OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION.
B00524521-I1
07/24/2023
Special inspection requirement — Energy Code Compliance Inspections
ROBERT STRONG JR
07/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT STRONG JR
07/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBERT STRONG JR
07/19/2023
Filed — Alteration
INSTALLATION OF WASHERS AND DRYERS IN BASEMENT LAUNDRY ROOM FOR USE OF MDL TENANTS. NO CHANGE TO OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION.
B00524521-P2
06/30/2023
Special inspection requirement — Energy Code Compliance Inspections
ROBERT STRONG JR
06/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT STRONG JR
06/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBERT STRONG JR
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/10/2023
Filed — Alteration
APARTMENT 5P: PLUMBIING WORK IN KITCHEN AND BATHROOM AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08040520-I1
04/10/2023
Filed — Alteration
RENOVATE EXISTING APARTMENT 5P: KITCHEN, BATHROOM, MINOR INTERIOR DEMOLITION, NEW PARTITIONS, FLOORING AND FINISHES AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08040481-I1
02/10/2023
Violation issued (FDNY_NOV, closed)
02/10/2023
Violation issued (FDNY_NOV, closed)
Latest 60 of 157 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPhoenix Sutton STR08/12/2026
DOB NOWGeneral ConstructionPermit IssuedCattro Consulting Group06/17/2026
DOB NOWSidewalk ShedPermit IssuedPhoenix Sutton STR05/18/2026
DOB NOWSidewalk ShedPermit IssuedPhoenix Sutton STR05/20/2025
DOB NOWStructuralSigned-offA101 CONSTRUCTION+DESIGN04/29/2025
DOB NOWGeneral ConstructionSigned-offA101 CONSTRUCTION+DESIGN10/16/2024
DOB NOWGeneral ConstructionSigned-offAndrew Maas Carpentry12/08/2023
DOB NOWPlumbingSigned-offPasquale Quaratino12/06/2023
DOB NOWGeneral ConstructionPermit IssuedKNG Construction Co01/14/2023
DOB NOWPlumbingSigned-offAdvanced Plumbing Mechanical08/18/2022
DOB NOWGeneral ConstructionSigned-offMBC Construction03/17/2021
DOB NOWPlumbingSigned-offBackflow Prevention of NY11/12/2020
DOB NOWSidewalk ShedSigned-offHKS Construction03/19/2019
DOB NOWSidewalk ShedSigned-offHKS Construction07/19/2018
BISOTISSUEDMSR Construction06/05/2018
BISPLISSUEDNice Plumbing04/22/2016
BISOTISSUEDHome Evolution Construction04/19/2016
BISPLISSUEDMartin PLG & Heating01/07/2016
BISOTISSUEDSteplin Construction11/27/2015
BISPLISSUEDTri State Plumbing & Heating06/09/2015
BISOTISSUEDSpindle L & C10/02/2014
BISOTISSUEDFutura Builders Group09/18/2014
BISOTISSUEDFutura Builders Group07/25/2014
BISOTISSUEDJenco Contracting03/13/2013
BISOTISSUEDAwr Group06/09/2010
BISEQISSUEDEverest Scaffolding04/08/2010
BISEQISSUEDEverest Scaffolding03/19/2010
BISEQISSUEDEverest Scaffolding01/08/2010
BISOTISSUEDAwr Group11/24/2009
BISEQISSUEDEverest Scaffolding11/23/2009
BISFSISSUEDStar Industrial Service Co09/27/2006
BISPLISSUEDJoseph Ferrigno P&H Co09/27/2006
BISFBISSUEDLeonard R Sibrizzi04/04/2005
14 projects · most recent 06/11/2026
General Wiring
FiledStatusContractorScope
06/11/2026Permit IssuedElectrical SecurityGeneral Wiring
06/08/2026Permit IssuedElectrical SecurityGeneral Wiring
05/20/2025Permit IssuedRichard Neu—
04/27/2025CompleteCNH ElectricalGeneral Wiring
10/17/2024CompleteAster Electric—
02/15/2024Permit IssuedAmerican Power Electric ConsGeneral Wiring
12/04/2023CompleteElectrical SecurityGeneral Wiring
02/10/2023CompleteQec Electrical SvceGeneral Wiring
11/30/2022Permit IssuedEinstein ElectricalGeneral Wiring
08/09/2022Permit IssuedElectrical SecurityGeneral Wiring
05/14/2021CompleteFas Electric—
03/16/2021CompleteKJK ElectricGeneral Wiring
03/11/2020Permit IssuedSterling ElectricGeneral Wiring
07/06/2018CompleteRichard Neu—
1 project · most recent 05/20/2025
Sidewalk Shed
FiledStatusContractorScope
05/20/2025Permit IssuedPhoenix Sutton STRSidewalk Shed
1 project · most recent 07/21/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
07/21/2025——Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/16/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/01/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
06/19/2025MasonryKevin Bonespecial
06/19/2025Energy Code Compliance InspectionsKevin Boneprogress
05/07/2025Tenant Protection Plan ComplianceChester Kowalskispecial
05/07/2025Structural Stability – Alterations of existing buildingsChester Kowalskispecial
05/07/2025FinalKevin Boneprogress
04/10/2025FinalRICHARD CHRISTIEprogress
04/10/2025Tenant Protection Plan ComplianceLaurence Jonesspecial
04/10/2025Structural Steel - DetailsRICHARD CHRISTIEspecial
04/10/2025Structural Stability – Alterations of existing buildingsRICHARD CHRISTIEspecial
04/10/2025Post-installed AnchorsRICHARD CHRISTIEspecial
04/10/2025Structural Steel - High Strength BoltingRICHARD CHRISTIEspecial
04/10/2025Structural Steel - WeldingRICHARD CHRISTIEspecial
07/30/2024Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
07/17/2024Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
11/28/2023Lighting in dwelling unitsHeather Roslundenergy_progress
11/28/2023Energy Code Compliance InspectionsHeather Roslundprogress
11/28/2023FinalHeather Roslundprogress
11/28/2023Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
07/24/2023Energy Code Compliance InspectionsROBERT STRONG JRprogress
07/24/2023Fire-Resistant Penetrations and JointsROBERT STRONG JRspecial
07/24/2023HVAC-R and service water piping design and insulationROBERT STRONG JRenergy_progress
06/30/2023Energy Code Compliance InspectionsROBERT STRONG JRprogress
06/30/2023Fire-Resistant Penetrations and JointsROBERT STRONG JRspecial
06/30/2023HVAC-R and service water piping design and insulationROBERT STRONG JRenergy_progress
12/14/2022FinalTYLER ELLISprogress
Latest 25 of 31.
▾Documents — 233 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch15
09/03/2026B00057372-I1Request digital key ↗
09/01/2026B00524521-P1Request digital key ↗
09/01/2026B00524521-P2Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
08/14/2026B00471754-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00385292-I1Request digital key ↗
▸Applications & Permits29
▸BISWORK PERMIT APPLICATION18
11/01/2018340634371Open ↗
09/20/2018340634371Open ↗
06/04/2018340609390Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
09/03/2020340753955Open ↗
09/20/2018340634371Open ↗
06/04/2018340609390Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications83
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
06/06/2019340609390Open ↗
11/18/2016320995189Open ↗
10/13/2016340372723Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/03/2026B00057372-I1Open ↗
09/01/2026B00471754-I1Open ↗
09/01/2026B00524521-P2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026B08054759-I1Open ↗
09/01/2026B01222499-I1Open ↗
09/01/2026B01222499-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/02/2026B08040520-P1Open ↗
09/01/2026B01222499-I1Open ↗
09/01/2026B01222499-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
09/20/2018340634371Open ↗
06/04/2018340609390Open ↗
04/18/2016340372723Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/03/2020340753955Open ↗
09/20/2018340634371Open ↗
06/04/2018340609390Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
12/02/2015321279059Open ↗
03/12/2013320575668Open ↗
01/11/2010320117869Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/20/2018340634371Open ↗
06/04/2018340609390Open ↗
04/18/2016340372723Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
03/12/2013320575668Open ↗
01/11/2010320117869Open ↗
11/24/2009320095357Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/03/2020340753955Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/02/2015321279059Open ↗
09/24/2014320980658Open ↗
▸BISSCHEDULE B - PLUMBING1
04/18/2016340372723Open ↗
▸Safety & Tenant Protection5
▸BISTENANT PROTECTION PLAN AND NOTES4
09/03/2020340753955Open ↗
09/20/2018340634371Open ↗
06/04/2018340609390Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026B00385292-I1Open ↗
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/01/2026B00524521-I1Open ↗
09/01/2026B00524521-P1Open ↗
09/01/2026B00524521-P2Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
09/03/2020340753955Open ↗
06/04/2018340609390Open ↗
04/18/2016340372723Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
01/11/2010320117869Open ↗
11/24/2009320095357Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
03/12/2013320575668Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/26/2009320087008Open ↗
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
06/06/2019340609390Open ↗
11/18/2016320995189Open ↗
10/13/2016340372723Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
09/03/2020340753955Open ↗
06/04/2018340609390Open ↗
04/18/2016340372723Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
06/06/2019340609390Open ↗
11/18/2016320995189Open ↗
02/27/2016320980658Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/04/2018340609390Open ↗
04/18/2016340372723Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00524521-I1Open ↗
08/14/2026B00471754-I1Open ↗
▸BISNYCECC ANALYSIS1
06/04/2018340609390Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/03/2020340753955Open ↗
09/20/2018340634371Open ↗
06/04/2018340609390Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs13
▸BISADMINISTRATIVE OBJECTIONS6
09/24/2014320980658Open ↗
07/10/2014320995189Open ↗
03/12/2013320575668Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
06/06/2019340609390Open ↗
11/18/2016320995189Open ↗
10/13/2016340372723Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/06/2019340609390Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT14
09/03/2020340753955Open ↗
06/06/2019340609390Open ↗
06/04/2018340609390Open ↗
Showing 3 of 14 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
09/03/2020340753955Open ↗
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET7
12/02/2015321279059Open ↗
09/24/2014320980658Open ↗
07/10/2014320995189Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
09/03/2020340753955Open ↗
09/20/2018340634371Open ↗
06/04/2018340609390Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION4
11/19/2020340753955Open ↗
11/16/2020340753955Open ↗
10/01/2010320117869Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
06/06/2019340609390Open ↗
▸Other Documents3
▸DOB NOWCalculations1
08/13/2026B01230945-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026B00057372-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01230945-I1Open ↗