← Back
Elevator apt, semi-fireproof without stores
1819 SEDGWICK AVENUE
💬 Discuss this project
2021Year Built
5Stories
D1Building Class
R6Zoning
6,003 sfGross Floor Area
8Units
Rent Stabilized14 Open Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: GABRIEL & JULIET INC · 2,680 sf lot · 2.24 FAR built · Flood zone X
Locations of Work
StructuralFire ProtectionGeneral
Roof1p · 1 filing · 18 docs
Bulkhead1p · 1 filing · 6 docs
Floor 41p · 1 filing · 18 docs
Floor 31p · 1 filing · 18 docs
Floor 2
Floor 12p · 1 filing · 18 docs
Cellar1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARSONS CONSTRUCTION807/08/2026
STELLAR INDUSTRIES1003/22/2026
JTD BUILDERS503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRAMODRAY SHAH, P.E.407/08/2024
AP PROFESSIONAL ENGINEERING PLLC202/06/2023
GAD ASHOORI PE201/06/2023
BAHARY ARCHITECTURE PC105/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SITE SAFETY BSD303/21/2026
SANDEEP KAUR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YAFE MEOD CORPGeneral Contractor603/21/2026
J&J DESIGNS INCGeneral Contractor407/08/2026
PARSONS CONSTRUCTION INCGeneral Contractor407/08/2026
GERBERT BONHOMMEElectrical303/21/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
STELLAR INDUSTRIES INCGeneral Contractor107/08/2026
CHANDRABALI RAMANANDGeneral Contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519507/08/2024
SHAHRISH CONSULTING LLC5702101/06/2023
Building Lifecycle
All (88)Filed (9)Permit Issued (9)Signed Off (5)Violation (40)Inspection (2)Special Inspection (20)Tax Incentive (3)
05/31/2026
Violation issued (HPD, closed)
A
05/31/2026
Violation issued (HPD, closed)
C
05/31/2026
Violation issued (HPD, open)
A
05/31/2026
Violation issued (HPD, open)
A
05/31/2026
Violation issued (HPD, open)
C
05/31/2026
Violation issued (HPD, open)
A
05/31/2026
Violation issued (HPD, open)
A
05/31/2026
Violation issued (HPD, open)
A
05/31/2026
Violation issued (HPD, open)
A
05/31/2026
Violation issued (HPD, closed)
B
05/23/2026
Violation issued (HPD, closed)
C
05/23/2026
Violation issued (HPD, closed)
B
05/23/2026
Violation issued (HPD, closed)
A
05/23/2026
Violation issued (HPD, closed)
C
05/23/2026
Violation issued (HPD, open)
A
05/23/2026
Violation issued (HPD, open)
A
05/23/2026
Violation issued (HPD, open)
A
05/23/2026
Violation issued (HPD, open)
A
05/23/2026
Violation issued (HPD, open)
A
05/23/2026
Violation issued (HPD, open)
A
05/23/2026
Violation issued (HPD, open)
A
05/11/2026
Violation issued (HPD, closed)
A
07/01/2025
421-a(16) construction completed
06/16/2025
Violation issued (HPD, closed)
A
09/12/2024
421-a(16) registration filed
09/05/2024
Signed off — Alteration
X00516929-I1
08/27/2024
Signed off — Alteration
X00871422-I1
08/12/2024
Permit issued — Construction Fence
X00516929-I1-FN
08/12/2024
Permit issued — Mechanical Systems
X00871422-I1-MS
07/25/2024
Signed off — Alteration
subsequent filing for sprinkler work
X00871474-I1
07/08/2024
Filed — Alteration
subsequent filing for sprinkler work
X00871474-P2
07/08/2024
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
07/03/2024
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
06/10/2024
Signed off — Alteration
X00349291-I1
06/06/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/04/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/01/2024
Permit issued — Sprinklers
X00871474-I1-EW-SP
12/14/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
X00674924-I1
09/14/2023
Permit issued — Structural
X00349291-I1-ST
07/28/2023
Permit issued — Construction Fence
X00516929-I1-FN
05/19/2023
Filed — Alteration
X00871422-I1
05/18/2023
Filed — Alteration
subsequent filing for sprinkler work
X00871474-I1
05/18/2023
Filed — Alteration
SUBSEQUENT PLUMBING WORK
X00871429-I1
05/08/2023
Special inspection requirement — Mechanical Systems
Younes Abouyaala
05/08/2023
Special inspection requirement — Final
NAVEEN KUMAR
04/18/2023
Violation issued (ECB, closed)
Unknown
04/18/2023
Violation issued (ECB, closed)
Construction
04/18/2023
Violation issued (ECB, closed)
Construction
04/18/2023
Violation issued (ECB, closed)
Construction
02/06/2023
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
X00674924-P1
02/02/2023
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
02/02/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Younes Abouyaala
02/02/2023
Special inspection requirement — Structural Steel - Welding
Younes Abouyaala
02/02/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
02/02/2023
Special inspection requirement — Final
NAVEEN KUMAR
02/02/2023
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
02/02/2023
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
02/02/2023
Special inspection requirement — Masonry
Younes Abouyaala
01/27/2023
Permit issued — Sidewalk Shed
X00674924-I1-SH
01/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offYAFE MEOD CORP08/12/2024
DOB NOWMechanical SystemsSigned-offYAFE MEOD CORP08/12/2024
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC05/01/2024
DOB NOWStructuralSigned-offJ&J DESIGNS INC09/14/2023
DOB NOWConstruction FenceSigned-offJ&J DESIGNS INC07/28/2023
DOB NOWSidewalk ShedSigned-offPARSONS CONSTRUCTION INC01/27/2023
DOB NOWConstruction FenceSigned-offSTELLAR INDUSTRIES INC12/20/2022
DOB NOWSidewalk ShedSigned-offPARSONS CONSTRUCTION INC02/07/2022
DOB NOWStructuralSigned-offCHANDRABALI RAMANAND05/13/2021
BIS—ISSUEDYAFE MEOD CORP08/13/2024
BISPLISSUEDPLBG P & H INC07/09/2024
BISOTISSUEDVOLTAIR SOLAR LLC01/19/2024
BIS—ISSUEDSTELLAR INDUSTRIES INC01/26/2023
BISPLISSUEDPLBG P & H INC12/29/2022
BISEQISSUEDSTELLAR INDUSTRIES INC12/05/2022
BIS—ISSUEDSTELLAR INDUSTRIES INC11/14/2022
BIS—ISSUEDSTELLAR INDUSTRIES INC08/05/2022
BIS—ISSUEDSTELLAR INDUSTRIES INC04/12/2022
BIS—ISSUEDSTELLAR INDUSTRIES INC11/03/2021
BIS—ISSUEDSTELLAR INDUSTRIES INC08/10/2021
BISEQISSUEDSTELLAR INDUSTRIES INC07/29/2021
BIS—ISSUEDSTELLAR INDUSTRIES INC07/27/2021
BISEQISSUEDMADISON ROSA04/20/2021
BIS—ISSUEDH RAMJIT HOME IMPROVEMENT08/01/2007
BISEQISSUEDH RAMJIT HOME IMPROVEMENT08/01/2007
1 project · most recent 05/18/2023
Storm Water/Sanitary
FiledStatusContractorScope
05/18/2023——Storm, Water/Sanitary
4 projects · most recent 03/31/2025
General Wiring
FiledStatusContractorScope
03/31/2025CompleteSUPREME ELECTRIC CORPGeneral Wiring
07/25/2024CompleteBRANDL ELECTRIC INC.General Wiring
05/28/2024CompleteB.P. ELECTRIC CORP—
02/17/2022CompleteBDS ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/06/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/04/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
07/08/2024Sprinkler SystemsYounes Abouyaalaspecial
07/03/2024Sprinkler SystemsYounes Abouyaalaspecial
05/08/2023Mechanical SystemsYounes Abouyaalaspecial
05/08/2023FinalNAVEEN KUMARprogress
02/02/2023Structural Steel - DetailsYounes Abouyaalaspecial
02/02/2023Structural Steel - High Strength BoltingYounes Abouyaalaspecial
02/02/2023Structural Steel - WeldingYounes Abouyaalaspecial
02/02/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
02/02/2023FinalNAVEEN KUMARprogress
02/02/2023Concrete - Cast-In-PlaceYounes Abouyaalaspecial
02/02/2023Structural Cold-Formed SteelYounes Abouyaalaspecial
02/02/2023MasonryYounes Abouyaalaspecial
01/16/2023Energy Code Compliance Inspections—progress
11/28/2022MasonryYounes Abouyaalaspecial
11/28/2022Structural Cold-Formed SteelYounes Abouyaalaspecial
11/28/2022Structural Steel - DetailsYounes Abouyaalaspecial
11/28/2022Structural Steel - High Strength BoltingYounes Abouyaalaspecial
11/28/2022Structural Steel - WeldingShahrish Shuvospecial
11/28/2022Concrete - Cast-In-PlaceYounes Abouyaalaspecial
11/28/2022FinalNAVEEN KUMARprogress
▾Documents — 239 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch7
08/25/2026X00516929-I1Request digital key ↗
08/23/2026X00674924-P1Request digital key ↗
08/23/2026X00674924-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Structural2
08/26/2026X00349291-I1Request digital key ↗
08/15/2026X00349291-P1Request digital key ↗
▸Applications & Permits43
▸BISPLAN / WORK APPROVAL APPLICATION29
07/13/2025220734007Open ↗
07/13/2025220734007Open ↗
12/24/2024210178243Open ↗
Showing 3 of 29 on file for this type
▸BISWORK PERMIT APPLICATION14
08/20/2024210178243Open ↗
01/19/2024240350641Open ↗
01/27/2023210178243Open ↗
Showing 3 of 14 on file for this type
▸Zoning, Tax Lot & Property Records8
▸BISZONING DIAGRAM4
01/16/2025210178243Open ↗
10/30/2024210178243Open ↗
09/20/2022210178243Open ↗
Showing 3 of 4 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/29/2020210178243Open ↗
▸BISVERIFY TAX LOT1
08/26/2025210178243Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/26/2025210178243Open ↗
▸Seals & Professional Certifications30
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026X00349291-P1Open ↗
09/01/2026X00349291-P1Open ↗
09/01/2026X00349291-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026X00349291-I1Open ↗
08/26/2026X00349291-P1Open ↗
08/25/2026X00516929-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026X00349291-P1Open ↗
08/28/2026X00349291-I1Open ↗
08/28/2026X00349291-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
09/01/2023240350641Open ↗
06/12/2020240274289Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/12/2020240274289Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING7
07/16/2024210178243Open ↗
06/03/2024210178243Open ↗
06/03/2024210178243Open ↗
Showing 3 of 7 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
09/25/2024210178243Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
09/25/2024210178243Open ↗
▸BISSPRINKLER SYSTEMS1
09/12/2024210178243Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE SIGNOFF3
08/26/2025210178243Open ↗
08/26/2025210178243Open ↗
08/26/2025210178243Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
04/20/2021210178243Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
07/17/2024240350641Open ↗
01/19/2024240350641Open ↗
01/08/2024240350641Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
10/01/2024210178243Open ↗
07/17/2024240350641Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT2
09/19/2025210178243Open ↗
09/01/2023240350641Open ↗
▸BISINTERIOR LIGHTING POWER1
09/25/2024210178243Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/25/2024210178243Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
09/25/2024210178243Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
09/25/2024210178243Open ↗
▸BISLIGHTING IN DWELLING UNITS1
09/25/2024210178243Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/01/2024210178243Open ↗
▸BISLIGHTING CONTROLS1
09/25/2024210178243Open ↗
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY11
09/26/2024210178243Open ↗
08/06/2024210178243Open ↗
07/22/2024240350641Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
06/29/2020210178243Open ↗
06/12/2020240274289Open ↗
▸BISSOIL REPORT2
06/29/2020210178243Open ↗
06/12/2020240274289Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
01/14/2021210178243Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/26/2024210178243Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/26/2024210178243Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
09/26/2024210178243Open ↗
▸BISMASONRY1
09/26/2024210178243Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
09/26/2024210178243Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
09/26/2024210178243Open ↗
▸BISMASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS1
09/26/2024210178243Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
09/26/2024210178243Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
09/26/2024210178243Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
09/26/2024210178243Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
08/12/2024210178243Open ↗
▸Approvals, Objections & Sign-offs23
▸BISSCHEDULE A - OCCUPANCY / USE9
12/24/2024210178243Open ↗
05/22/2024210178243Open ↗
11/07/2022210178243Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
02/27/2024220744194Open ↗
02/27/2024220744194Open ↗
02/27/2024220744194Open ↗
Showing 3 of 9 on file for this type
▸BISSUPERSEDING LETTER5
08/20/2024210178243Open ↗
01/27/2023210178243Open ↗
08/08/2022210178243Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership10
▸BISPROJECT-SPECIFIC GL INSURANCE6
08/20/2024210178243Open ↗
01/27/2023210178243Open ↗
08/08/2022210178243Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT2
01/18/2024240350641Open ↗
06/15/2020240274289Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
07/22/2024240350641Open ↗
▸BISINSURANCE: LIABILITY1
01/14/2021210178243Open ↗
▸Filing & Intake Forms26
▸BISADDITIONAL INFORMATION16
02/13/2025210178243Open ↗
08/08/2024210178243Open ↗
08/08/2024210178243Open ↗
Showing 3 of 16 on file for this type
▸BISBOROUGH INTAKE FORM4
08/20/2024210178243Open ↗
04/13/2022210178243Open ↗
05/21/2021210178243Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
04/03/2024220734007Open ↗
07/21/2020220734007Open ↗
▸BISEFILING COVER SHEET2
02/27/2024220744194Open ↗
07/21/2020220734007Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
07/18/2023240350641Open ↗
06/12/2020240274289Open ↗
▸Other Documents7
▸BISLOWEST FLOOR ELEVATION1
09/26/2024210178243Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
09/26/2024210178243Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
09/26/2024210178243Open ↗
▸BISTax Abatement Miscellaneous1
07/18/2024240350641Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
09/25/2024210178243Open ↗
▸BISDUCT DESIGN, INSULATION AND LEAKAGE TESTING1
09/25/2024210178243Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
04/03/2024220734007Open ↗