Locations of Work
Architecture
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAPOL CONSTRUCTION3507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/13/2026$2.8M—RIDGE DEVELOPMENT GROUP LLC → Private party$586/sf building
01/24/2024$1.4M—Private party → RIDGE DEVELOPMENT GROUP LLC$293/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRICOLAGE DESIGNS801/30/2026
YAKER ENGINEERING, P.C.107/15/2024
ARYEH SIEGEL ARCHITECT104/15/2024
BRIAN GOLDMAN, ARCHITECT106/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
D S CREATIVE INOVATIONS1003/21/2026
BRICOLAGE DESIGNS303/21/2026
AVALON DESIGNS203/21/2026
PERCIBALLI INDUSTRIES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAPOL CONSTRUCTION LLCGeneral Contractor1107/08/2026
M&D FIRE SPRINKLER INCFire Protection207/08/2026
BROOKLYN MECH WORKS CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING PROFESSIONAL6393701/30/2026
STEEL CORE ENGINEERING PL1098105/30/2024
Building Lifecycle
All (93)Filed (11)Permit Issued (12)Signed Off (9)Violation (4)Inspection (11)Objection (16)Special Inspection (30)
04/01/2026
Signed off — New Building
INSTALL SPRINKLER SYSTEM AS PER PLANS
B01034557-I1
03/07/2026
Signed off — New Building
INSTALL SPRINKLER SYSTEM AS PER PLANS
B01034557-S3
02/09/2026
Permit issued — Plumbing
B01034557-S3-PL
02/09/2026
Special inspection requirement — Fenestration areas
OLEG RUDITSER
02/09/2026
Special inspection requirement — Metering
OLEG RUDITSER
02/09/2026
Special inspection requirement — Air barrier — testing
OLEG RUDITSER
02/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
OLEG RUDITSER
02/09/2026
Special inspection requirement — Permanent certificate
OLEG RUDITSER
02/09/2026
Special inspection requirement — Insulation placement and R values
OLEG RUDITSER
02/09/2026
Special inspection requirement — Maintenance information
OLEG RUDITSER
02/09/2026
Special inspection requirement — Air barrier - visual inspection
OLEG RUDITSER
02/09/2026
Special inspection requirement — Electric vehicle service equipment requirements
OLEG RUDITSER
02/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
OLEG RUDITSER
02/09/2026
Special inspection requirement — Concrete - Cast-In-Place
OLEG RUDITSER
02/09/2026
Special inspection requirement — Wood – Seismic Resistance
OLEG RUDITSER
02/09/2026
Special inspection requirement — Structural Steel - Details
OLEG RUDITSER
02/09/2026
Special inspection requirement — Structural Cold-Formed Steel
OLEG RUDITSER
02/09/2026
Special inspection requirement — Subgrade Inspections
OLEG RUDITSER
02/09/2026
Special inspection requirement — Masonry
OLEG RUDITSER
02/09/2026
Special inspection requirement — Footing and Foundation
OLEG RUDITSER
02/09/2026
Special inspection requirement — Final
OLEG RUDITSER
02/09/2026
Special inspection requirement — Energy Code Compliance Inspections
OLEG RUDITSER
02/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
OLEG RUDITSER
02/09/2026
Special inspection requirement — Interior lighting power
OLEG RUDITSER
02/09/2026
Special inspection requirement — Fenestration air leakage
OLEG RUDITSER
01/30/2026
Filed — New Building
INSTALL SPRINKLER SYSTEM AS PER PLANS
B01034557-P3
11/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/30/2025
Signed off — New Building
INSTALL SPRINKLER SYSTEM AS PER PLANS
B01034557-S4
10/15/2025
Objection resolved — Addressed
10/15/2025
Objection resolved — Addressed
09/25/2025
Signed off — New Building
INSTALL SPRINKLER SYSTEM AS PER PLANS
B01034557-S2
09/17/2025
Objection raised — Scope
09/17/2025
Objection raised — Fire_Protection
08/29/2025
Filed — New Building
INSTALL SPRINKLER SYSTEM AS PER PLANS
B01034557-P1
08/29/2025
Special inspection requirement — Air barrier — testing
OLEG RUDITSER
08/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
OLEG RUDITSER
08/29/2025
Special inspection requirement — Footing and Foundation
OLEG RUDITSER
08/29/2025
Special inspection requirement — Fenestration areas
OLEG RUDITSER
08/29/2025
Special inspection requirement — Fenestration air leakage
OLEG RUDITSER
08/29/2025
Special inspection requirement — Interior lighting power
OLEG RUDITSER
08/29/2025
Special inspection requirement — Insulation placement and R values
OLEG RUDITSER
08/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
OLEG RUDITSER
08/26/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/15/2025
Signed off — New Building
INSTALL SPRINKLER SYSTEM AS PER PLANS
B01034557-S5
08/14/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/12/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/08/2025
Permit issued — Sprinklers
B01034557-S4-EW-SP
08/07/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/01/2025
Permit issued — Mechanical Systems
B01034557-S2-MS
07/30/2025
Permit issued — Curb Cut
B01034557-S5-CC
07/30/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/10/2025
Signed off — New Building
INSTALL SPRINKLER SYSTEM AS PER PLANS
B01034557-S7
07/10/2025
Signed off — Alteration
8' Construction Fence
B01031356-I1
07/01/2025
Signed off — New Building
INSTALL SPRINKLER SYSTEM AS PER PLANS
B01034557-S6
05/23/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/06/2025
Permit issued — General Construction
B01034557-I1-GC-CX
04/01/2025
Objection resolved — Addressed
04/01/2025
Objection resolved — Addressed
03/20/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBROOKLYN MECH WORKS CORP02/09/2026
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC08/08/2025
DOB NOWMechanical SystemsSigned-offLEON D. DEMATTEIS CONSTR08/01/2025
DOB NOWCurb CutSigned-offLEON D. DEMATTEIS CONSTR07/30/2025
DOB NOWGeneral ConstructionPermit IssuedLEON D. DEMATTEIS CONSTR05/06/2025
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC02/10/2025
DOB NOWPlumbingSigned-offBROOKLYN MECH WORKS CORP12/30/2024
DOB NOWConstruction FenceSigned-offLEON D. DEMATTEIS CONSTR12/09/2024
DOB NOWGeneral ConstructionPermit IssuedLEON D. DEMATTEIS CONSTR09/13/2024
DOB NOWSupport of ExcavationSigned-offLEON D. DEMATTEIS CONSTR09/13/2024
DOB NOWConstruction FenceSigned-offLEON D. DEMATTEIS CONSTR05/02/2024
DOB NOWConstruction FenceSigned-offLEON D. DEMATTEIS CONSTR02/16/2024
1 project · most recent 01/30/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/30/2026Signed-offSAPOL CONSTRUCTION LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin RXTQ60TBVJUB; RXTQ36TBVJUB;RXTQ36TBVJUB 22,000 BTU · Vrf Outdoor ×3
1 project · most recent 01/30/2026
Sprinkler System
FiledStatusContractorScope
01/30/2026Signed-offM&D FIRE SPRINKLER INCSprinkler System
1 project · most recent 01/30/2026
Storm Water/Sanitary
FiledStatusContractorScope
01/30/2026Signed-offBROOKLYN MECH WORKS CORPStorm, Water/Sanitary
1 project · most recent 10/07/2024
General Wiring
FiledStatusContractorScope
10/07/2024CompleteSHELBY ELECTRICAL CORPGeneral Wiring
1 project · most recent 01/30/2026
Concrete Masonry Wood
FiledStatusContractorScope
01/30/2026Signed-offBROOKLYN MECH WORKS CORPConcrete, Masonry, Wood
1 project · most recent 01/30/2026
Fence
FiledStatusContractorScope
01/30/2026Signed-offBROOKLYN MECH WORKS CORPFence
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
11/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/26/2025Fail-Final CND-Occupancy InspectionFailView ↗
08/14/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
08/12/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/30/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/20/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
02/09/2026Fenestration areasOLEG RUDITSERenergy_progress
02/09/2026MeteringOLEG RUDITSERenergy_progress
02/09/2026Air barrier — testing OLEG RUDITSERenergy_progress
02/09/2026Fenestration and door U-factor and product ratingsOLEG RUDITSERenergy_progress
02/09/2026Permanent certificateOLEG RUDITSERenergy_progress
02/09/2026Insulation placement and R valuesOLEG RUDITSERenergy_progress
02/09/2026Maintenance informationOLEG RUDITSERenergy_progress
02/09/2026Air barrier - visual inspectionOLEG RUDITSERenergy_progress
02/09/2026Electric vehicle service equipment requirementsOLEG RUDITSERenergy_progress
02/09/2026Fire-Resistant Penetrations and JointsOLEG RUDITSERspecial
02/09/2026Concrete - Cast-In-PlaceOLEG RUDITSERspecial
02/09/2026Wood – Seismic ResistanceOLEG RUDITSERspecial
02/09/2026Structural Steel - DetailsOLEG RUDITSERspecial
02/09/2026Structural Cold-Formed SteelOLEG RUDITSERspecial
02/09/2026Subgrade InspectionsOLEG RUDITSERspecial
02/09/2026MasonryOLEG RUDITSERspecial
02/09/2026Footing and FoundationOLEG RUDITSERprogress
02/09/2026FinalOLEG RUDITSERprogress
02/09/2026Energy Code Compliance InspectionsOLEG RUDITSERprogress
02/09/2026Fire-Resistance Rated ConstructionOLEG RUDITSERprogress
02/09/2026Interior lighting powerOLEG RUDITSERenergy_progress
02/09/2026Fenestration air leakageOLEG RUDITSERenergy_progress
08/29/2025Air barrier — testing OLEG RUDITSERenergy_progress
08/29/2025Fire-Resistance Rated ConstructionOLEG RUDITSERprogress
08/29/2025Footing and FoundationOLEG RUDITSERprogress
Latest 25 of 56.
▾Documents — 113 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026B00890407-I1Request digital key ↗
08/25/2026B01031356-I1Request digital key ↗
08/24/2026B01034557-P3Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records15
▸DOB NOWRestrictive Declaration/Easement 18
08/24/2026B01034557-P3Open ↗
08/24/2026B01034557-S4Open ↗
08/24/2026B01034557-S3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/24/2026B01034557-P3Open ↗
08/24/2026B01034557-I1Open ↗
08/15/2026B01034557-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/24/2026B01034557-P3Open ↗
08/24/2026B01034557-I1Open ↗
08/15/2026B01034557-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/24/2026B01034557-I1Open ↗
▸Seals & Professional Certifications66
▸DOB NOWProgress Inspector Seal & Signature37
09/28/2026B01034557-S2Open ↗
09/28/2026B01034557-S2Open ↗
09/28/2026B01034557-S2Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/28/2026B01034557-S2Open ↗
09/28/2026B01034557-S2Open ↗
09/19/2026B01034557-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/24/2026B01034557-P3Open ↗
08/24/2026B01034557-P1Open ↗
08/24/2026B01034557-S7Open ↗
Showing 3 of 11 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/24/2026B01034557-P3Open ↗
08/24/2026B01034557-I1Open ↗
08/15/2026B01034557-P1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/24/2026B01034557-P3Open ↗
08/24/2026B01034557-I1Open ↗
08/15/2026B01034557-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/24/2026B01034557-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/24/2026B01034557-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/24/2026B01034557-I1Open ↗
▸Other Documents12
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/24/2026B01034557-P3Open ↗
08/24/2026B01034557-I1Open ↗
08/15/2026B01034557-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/24/2026B01034557-P3Open ↗
08/24/2026B01034557-I1Open ↗
08/15/2026B01034557-P1Open ↗
▸DOB NOWSite Survey: Initial3
08/24/2026B01034557-P3Open ↗
08/24/2026B01034557-I1Open ↗
08/15/2026B01034557-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01034557-S6Open ↗
▸DOB NOWPro Cert Restriction Exception (LL158/17)1
08/13/2026B01031356-I1Open ↗
▸DOB NOWFinal Survey1
08/24/2026B01034557-I1Open ↗