← Back
QUEENS
182-25 EASTERN ROAD
QUEENS · BIN 4625385
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof3p · 1 filing · 18 docs
Floor 27p · 1 filing · 18 docs
Floor 112p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LOGAN PROPERTY2003/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Casino Development Group, Inc203/21/2026
GEORGE E BERGER ASS1403/21/2026
HIGH POINT ENGINEERING103/21/2026
Building Lifecycle
All (54)Filed (9)Objection (15)Special Inspection (30)
05/11/2026
Objection resolved — Resolved
05/08/2026
Objection resolved — Resolved
04/29/2026
Objection resolved — Resolved
04/29/2026
Objection resolved — Resolved
04/13/2026
Objection raised — Scope
04/13/2026
Objection raised — Structural
04/13/2026
Objection raised — Admin
04/07/2026
Objection resolved — Addressed
03/30/2026
Objection raised — Admin
03/13/2026
Objection raised — Scope
03/13/2026
Objection raised — Scope
03/10/2026
Filed — Alteration
PROPOSED SITE GRADING AND ASSOCAITED SITE IMPROVEMENT PLAN WHICH INCLUDES NEW ASPHALT PAVEMENT, A NEW CONCRETE PAVEMENT, A PERIMETER FENCE MOUNTED ON CONCRETE BARRIERS AND SWING GATES AT THE ENTRANCES. APPLICATION FILED IN CONJUNCTION W/Q01150283-I1 (NB).
Q01288542-I1
03/10/2026
Filed — Alteration
PROPOSED SITE GRADING AND ASSOCAITED SITE IMPROVEMENT PLAN WHICH INCLUDES NEW ASPHALT PAVEMENT, A NEW CONCRETE PAVEMENT, A PERIMETER FENCE MOUNTED ON CONCRETE BARRIERS AND SWING GATES AT THE ENTRANCES. APPLICATION FILED IN CONJUNCTION W/Q01150283-I1 (NB).
Q01288542-S1
02/03/2026
Filed — New Building
STRUCTURAL WORK PER PLANS
Q01150283-S1
02/03/2026
Filed — New Building
STRUCTURAL WORK PER PLANS
Q01150283-S2
01/26/2026
Special inspection requirement — Air barrier — testing
01/26/2026
Special inspection requirement — Protection of exposed foundation insulation
10/01/2025
Special inspection requirement — Energy Code Compliance Inspections
10/01/2025
Special inspection requirement — Exterior lighting power
09/18/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
09/17/2025
Special inspection requirement — Final
09/17/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
09/17/2025
Special inspection requirement — Subgrade Inspections
06/26/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
06/26/2025
Special inspection requirement — Concrete - Cast-In-Place
06/26/2025
Special inspection requirement — Final
06/25/2025
Filed — Alteration
Installation of (4) 10,000-GAL. underground storage tanks and (6) Pump islands with associated piping. No change in use, egress or occupancy.
Q01196693-P1
06/18/2025
Special inspection requirement — Concrete - Cast-In-Place
06/18/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
06/18/2025
Special inspection requirement — Final
04/24/2025
Filed — Alteration
Installation of (4) 10,000-GAL. underground storage tanks and (6) Pump islands with associated piping. No change in use, egress or occupancy.
Q01196693-I1
03/11/2025
Objection raised — Admin
03/11/2025
Objection raised — Scope
03/04/2025
Filed — New Building
STRUCTURAL WORK PER PLANS
Q01150283-S3
03/04/2025
Filed — New Building
STRUCTURAL WORK PER PLANS
Q01150283-S4
02/26/2025
Objection raised — Scope
02/26/2025
Objection raised — Admin
02/19/2025
Filed — New Building
STRUCTURAL WORK PER PLANS
Q01150283-I1
01/12/2025
Special inspection requirement — Masonry
01/12/2025
Special inspection requirement — Concrete - Cast-In-Place
01/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
01/12/2025
Special inspection requirement — Energy Code Compliance Inspections
01/12/2025
Special inspection requirement — Subgrade Inspections
01/12/2025
Special inspection requirement — Deep Foundation Elements
01/12/2025
Special inspection requirement — Exterior lighting power
01/12/2025
Special inspection requirement — Interior lighting power
01/12/2025
Special inspection requirement — Lighting controls
12/27/2024
Special inspection requirement — Footing and Foundation
12/27/2024
Special inspection requirement — Final
12/18/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
12/18/2024
Special inspection requirement — Masonry
12/18/2024
Special inspection requirement — Sprayed fire-resistant materials
12/18/2024
Special inspection requirement — Air barrier - visual inspection
12/18/2024
Special inspection requirement — Fenestration air leakage
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—ISSUEDSUPER EAGLE CONTRACTING08/22/2013
BIS—ISSUEDQUEDAN CONSTRUCTION SERVICES06/06/2011
BIS—ISSUEDBRUNO FRUSTACI CONTRACTING INC05/06/2011
1 project · most recent 02/03/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/03/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MUY-GL18NA 18,000 BTU · Condensing Unit ×1
MUYGL18NA 18,000 BTU · Condensing Unit ×1
PUHYHP72TNU-A1 72,000 BTU · Vrf Outdoor ×1
SUZ-KA18NA2 17,700 BTU · Condensing Unit ×1
Heating
Modine ×1
Ventilation
Greenheck CUE-90-VG (1), CUE-070-VG (1), VUE-180-VG (5), CUE-120-VG (3) 17,200 CFM · Exhaust Fan ×10
1 project · most recent 02/03/2026
Sprinkler System
FiledStatusContractorScope
02/03/2026——Sprinkler System
2 projects · most recent 03/10/2026
Water/Sanitary Storm Gas
FiledStatusContractorScope
03/10/2026——Storm, Water/Sanitary
02/03/2026——Gas, Water/Sanitary
3 projects · most recent 03/10/2026
Concrete Steel Masonry
FiledStatusContractorScope
03/10/2026——2 scope_items
02/03/2026——Steel, Concrete, Masonry
06/25/2025——Concrete
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
01/26/2026Air barrier — testing —energy_progress
01/26/2026Protection of exposed foundation insulation—energy_progress
10/01/2025Energy Code Compliance Inspections—progress
10/01/2025Exterior lighting power—energy_progress
09/18/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
09/17/2025Final—progress
09/17/2025Subsurface Conditions – Fill Placement & In-Place Density—special
09/17/2025Subgrade Inspections—special
06/26/2025Subsurface Conditions – Fill Placement & In-Place Density—special
06/26/2025Concrete - Cast-In-Place—special
06/26/2025Final—progress
06/18/2025Concrete - Cast-In-Place—special
06/18/2025Subsurface Conditions – Fill Placement & In-Place Density—special
06/18/2025Final—progress
01/12/2025Masonry—special
01/12/2025Concrete - Cast-In-Place—special
01/12/2025Fire-Resistance Rated Construction—progress
01/12/2025Energy Code Compliance Inspections—progress
01/12/2025Subgrade Inspections—special
01/12/2025Deep Foundation Elements—special
01/12/2025Exterior lighting power—energy_progress
01/12/2025Interior lighting power—energy_progress
01/12/2025Lighting controls—energy_progress
12/27/2024Footing and Foundation—progress
12/27/2024Final—progress
Latest 25 of 33.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/20/2026Q01196693-I1Request digital key ↗
08/20/2026Q01196693-P1Request digital key ↗
08/17/2026Q01150283-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
08/30/2013410076803Open ↗
08/27/2013410076803Open ↗
06/06/2011410076803Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
07/12/2013410076803Open ↗
06/03/2013410076803Open ↗
03/13/2008410076803Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026Q01150283-I1Open ↗
08/13/2026Q01150283-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01150283-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01150283-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/17/2026Q01150283-S3Open ↗
08/17/2026Q01150283-I1Open ↗
08/17/2026Q01150283-S4Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
05/10/2011410076803Open ↗
05/06/2011410076803Open ↗
03/13/2008410076803Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/13/2008410076803Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
03/13/2008410076803Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026Q01150283-I1Open ↗
▸Safety & Tenant Protection1
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/06/2011410076803Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
05/06/2011410076803Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
05/06/2011410076803Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION3
08/30/2013410076803Open ↗
08/27/2013410076803Open ↗
06/06/2011410076803Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/13/2008410076803Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
04/10/2009410076803Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE2
08/30/2013410076803Open ↗
08/27/2013410076803Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
05/06/2011410076803Open ↗
04/13/2009410076803Open ↗
03/13/2008410076803Open ↗
▸BISEFILING COVER SHEET1
03/13/2008410076803Open ↗
▸Other Documents4
▸BISPLOT DIAGRAM1
03/13/2008410076803Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01150283-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01150283-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01150283-I1Open ↗