← Back
Multi-story retail building (2+)
182 4 AVENUE
💬 Discuss this project
1940Year Built
2Stories
K2Building Class
C4-4DZoning
6,769 sfGross Floor Area
1Units
0 Open Violations
Multi-story retail building (2+) · Owner of record: FAC CENTER LOCAL DEVELOPMENT CORPORATION · 3,850 sf lot · 1.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction11p · 3 filings · 20 docs
Floor 2Under Construction19p · 1 filing · 20 docs
Floor 1Under Construction7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FAC CENTER LOCAL DEVELOPM603/22/2026
FAC HOUSING DEVELOPMENT F103/22/2026
FAC HDFC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KEMS ENGINEERING AND CONSTRUCTION107/16/2026
ESKW/A306/24/2026
SYNERGIC DESIGN ARCHITECTS106/24/2026
L. NAOUM, P.E., P. C.706/23/2026
ROYAL ENGINEERING, P.C106/12/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.1203/21/2026
A1 EXPEDITING SERVICE CORP.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXPERT GROUPENTERPRISE INGeneral Contractor303/21/2026
HOD PIPING & HEATING CORPPlumbing207/08/2026
JOE MIDDLETONElectrical203/21/2026
BAKIU HVAC LLCGeneral Contractor104/09/2026
UPRIGHT FIRE PROTCTN LLCFire Protection106/28/2026
NINO GENERAL CONTRACTINGGeneral Contractor104/09/2026
PETRI PLUMBING & HEATINGGeneral Contractor107/25/2026
ACCORD POWER INCGeneral Contractor106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC SPECIAL INSPECTIONS8355107/16/2026
METRIC CONSULTING AND INS1803706/24/2026
SYNERGIC DESIGN LLC8561106/24/2026
Building Lifecycle
All (119)Filed (13)Permit Issued (8)Signed Off (1)Violation (10)Inspection (5)Objection (52)Special Inspection (30)
07/23/2026
Permit issued — Mechanical Systems
B01427247-I1-MS
07/16/2026
Filed — Alteration
REPLACE HEAT PUMP CONDENSER ON 1st FLOOR ROOF AND AIR HANDLER ON 1st FLOOR.
B01427247-I1
07/13/2026
Special inspection requirement — Maintenance information
Steven Bendoraitis
07/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
07/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
07/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
07/07/2026
Special inspection requirement — Mechanical Systems
ABDALLAH ELCHERBINI
07/07/2026
Special inspection requirement — Final
Steven Bendoraitis
07/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Masonry
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
06/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
06/26/2026
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
06/25/2026
Permit issued — Solar
B01409427-I1-SL
06/24/2026
Filed — Alteration
Installation of 15.4 kw solar energy system on roof. No change of occupancy, use or egress.
B01409427-I1
06/24/2026
Filed — Alteration
INSTALLATION OF NEW MULTI-ZONE HEAT PUMP COOLING AND HEATING SYSTEM, DOAS, AND TOILET VENTILATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00903954-P8
06/23/2026
Filed — Alteration
INSTALLATION OF NEW MULTI-ZONE HEAT PUMP COOLING AND HEATING SYSTEM, DOAS, AND TOILET VENTILATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00903954-P6
05/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
05/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
05/29/2026
Special inspection requirement — Final
Malathi Ananthakrishnan
05/29/2026
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
04/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/23/2026
Permit issued — Mechanical Systems
B00903954-S1-MS
12/30/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/21/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/09/2025
Permit issued — Plumbing
B00903954-S2-PL
10/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/27/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
10/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
10/16/2025
Objection resolved — Addressed
10/15/2025
Permit issued — Sprinklers
B00903954-S3-EW-SP
10/15/2025
Objection raised — Plumbing
10/10/2025
Permit issued — Plumbing
B00903954-S2-PL
10/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
10/01/2025
Filed — Alteration
INSTALLATION OF NEW MULTI-ZONE HEAT PUMP COOLING AND HEATING SYSTEM, DOAS, AND TOILET VENTILATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00903954-P2
10/01/2025
Filed — Alteration
INSTALLATION OF NEW MULTI-ZONE HEAT PUMP COOLING AND HEATING SYSTEM, DOAS, AND TOILET VENTILATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00903954-P4
10/01/2025
Filed — Alteration
INSTALLATION OF NEW MULTI-ZONE HEAT PUMP COOLING AND HEATING SYSTEM, DOAS, AND TOILET VENTILATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00903954-P3
09/05/2025
Permit issued — Structural
B00903954-I1-GC
08/11/2025
Objection resolved — Addressed
07/18/2025
Objection raised — Admin
07/18/2025
Objection resolved — Addressed
07/05/2025
Violation issued (ECB, closed)
Construction
07/05/2025
Violation issued (ECB, closed)
Unknown
06/11/2025
Objection raised — Admin
06/03/2025
Filed — Alteration
INSTALLATION OF NEW MULTI-ZONE HEAT PUMP COOLING AND HEATING SYSTEM, DOAS, AND TOILET VENTILATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00903954-P1
11/16/2023
Objection resolved — Addressed
10/29/2023
Objection resolved — Addressed
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPETRI PLUMBING & HEATING07/23/2026
DOB NOWSolarPermit IssuedACCORD POWER INC06/25/2026
DOB NOWMechanical SystemsPermit IssuedBAKIU HVAC02/23/2026
DOB NOWPlumbingSigned-offHOD PIPING & HEATING CORP12/09/2025
DOB NOWSprinklersPermit IssuedH.J. FLOOD INC.10/15/2025
DOB NOWPlumbingSigned-offHOD PIPING & HEATING CORP10/10/2025
DOB NOWStructuralPermit IssuedNINO GENERAL CONTRACTING09/05/2025
DOB NOWSidewalk ShedSigned-offEXPERT GROUPENTERPRISE IN06/13/2018
BISSPISSUEDSIRINA FIRE PROT CORP01/22/2019
BIS—ISSUEDXBR INC10/01/2018
BISPLISSUEDLOUIS L.BUTTERMARK & SONS09/12/2018
BISOTISSUEDGLENWOOD CONSTRUCTION COR08/02/2018
BISSPISSUEDSIRINA FIRE PROT CORP12/05/2017
BIS—ISSUEDXBR INC09/22/2017
BISPLISSUEDLOUIS L.BUTTERMARK & SONS09/14/2017
BIS—ISSUEDXBR INC08/15/2017
BIS—ISSUEDPAUL SIGNS, INC09/12/2006
BIS—ISSUEDPAUL SIGNS, INC09/12/2006
BISOTISSUEDJABUS BUILDING CORP12/02/2004
BISEQISSUEDCOLGATE SCAFFOLDING07/17/2003
BISOTISSUEDROBINSON CONTRACTING07/10/2003
2 projects · most recent 07/16/2026
Air Conditioning Systems Heating Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/16/2026Signed-offPETRI PLUMBING & HEATINGAir Conditioning Systems, Heating Systems
Cooling
Daikin HP-1 / RXYA72AATJA 69,000 BTU · Vrf Outdoor ×1
Heating
Daikin HP-1/ RXYA72AATJA 69,000 BTU · Vrf Outdoor ×1
06/24/2026Permit IssuedBAKIU HVAC LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MPE-0-W1-12-036-C3 44,200 BTU · Vrf Indoor ×2
PUHY-EP72TNU-A 72,000 BTU · Vrf Outdoor ×2
1 project · most recent 06/24/2026
FiledStatusContractorScope
06/24/2026Permit IssuedUPRIGHT FIRE PROTCTN LLC28 heads
1 project · most recent 06/24/2026
Water/Sanitary
FiledStatusContractorScope
06/24/2026Signed-offMERCON PLUMBING CORPWater/Sanitary
3 projects · most recent 05/29/2026
General Wiring
FiledStatusContractorScope
05/29/2026Permit IssuedACCORD POWER ELECTRIC LLC2 meters, 1 new_meters
10/18/2025Permit IssuedW 8 ELECTRIC CORPGeneral Wiring
06/12/2018CompleteMEO ELECTRIC CORP—
1 project · most recent 06/24/2026
Steel
FiledStatusContractorScope
06/24/2026Permit IssuedBAKIU HVAC LLCSteel
1 project · most recent 06/24/2026
FiledStatusContractorScope
06/24/2026Permit IssuedACCORD POWER INC35 panels, 15.4 kw, 3,767.71 roof_area_sqft
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/30/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
07/13/2026HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
07/13/2026HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
07/13/2026HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
07/13/2026Maintenance informationSteven Bendoraitisenergy_progress
07/13/2026Energy Code Compliance InspectionsSteven Bendoraitisprogress
07/07/2026Mechanical SystemsABDALLAH ELCHERBINIspecial
07/07/2026FinalSteven Bendoraitisprogress
07/06/2026Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
07/06/2026Interior lighting powerSAMI HAJJAR P.Eenergy_progress
07/06/2026Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
07/06/2026Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
07/06/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
07/06/2026Lighting controlsSAMI HAJJAR P.Eenergy_progress
07/06/2026Post-installed AnchorsSAMI HAJJAR P.Especial
07/06/2026MasonrySAMI HAJJAR P.Especial
07/06/2026FinalSAMI HAJJAR P.Eprogress
07/06/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
07/06/2026Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
07/06/2026Structural Steel - WeldingSAMI HAJJAR P.Especial
07/06/2026Structural Steel - DetailsSAMI HAJJAR P.Especial
06/26/2026Sprinkler SystemsSAMI HAJJAR P.Especial
06/26/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
05/29/2026Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
05/29/2026Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
05/29/2026Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
Latest 25 of 62.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
DancewaveOtherFloor 1, Roof
Project B01427247 Alteration · Permit Entire · 07/16/2026
Fifth Ave CommitteeOfficeFloor 2
Project B00903954 Alteration · Permit Issued · 08/04/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 196 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/03/2026B00052473-I1Request digital key ↗
08/26/2026B00903954-P8Request digital key ↗
08/26/2026B00903954-P6Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION12
04/25/2024321275669Open ↗
12/22/2022321693896Open ↗
12/15/2021321275669Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION10
01/23/2019321693896Open ↗
10/02/2018321275669Open ↗
09/13/2018321275669Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
11/13/2019321275669Open ↗
03/26/2019321275669Open ↗
12/11/2018321275669Open ↗
▸BISPLACE OF ASSEMBLY2
10/24/2016321432213Open ↗
08/18/2016321432213Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/09/2018321275669Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
01/09/2023321275669Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
01/03/2023321275669Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/12/2022321275669Open ↗
▸Seals & Professional Certifications56
▸DOB NOWProgress Inspector Seal & Signature16
09/24/2026B00903954-S2Open ↗
09/02/2026B00903954-S1Open ↗
09/02/2026B00903954-S1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
01/17/2020301865417Open ↗
12/06/2019301865417Open ↗
10/02/2019321275669Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/03/2026B00052473-I1Open ↗
08/26/2026B00903954-P3Open ↗
08/26/2026B00903954-P8Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/25/2026B00903954-S3Open ↗
09/02/2026B00903954-S1Open ↗
08/28/2026B00903954-P4Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/16/2018340618969Open ↗
12/06/2017321693896Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/06/2017321693896Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/16/2018340618969Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/16/2018340618969Open ↗
▸Trade Schedules & Equipment9
▸BISEQUIPMENT USE PERMITS3
01/03/2022321275669Open ↗
01/03/2022321275669Open ↗
01/03/2022321275669Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/06/2017321693896Open ↗
11/24/2015321275669Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/03/2022321275669Open ↗
01/03/2022321275669Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
01/27/2017321275669Open ↗
▸BISSCHEDULE B - PLUMBING1
12/15/2021321275669Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
04/11/2019321275669Open ↗
01/27/2017321275669Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
07/31/2017321275669Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/26/2026B00903954-S3Open ↗
08/26/2026B00903954-S2Open ↗
08/26/2026B00903954-S1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
07/16/2018340618969Open ↗
12/06/2017321693896Open ↗
08/15/2017321275669Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026B01427247-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
03/18/2019340618969Open ↗
07/31/2017321275669Open ↗
01/27/2017321275669Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/26/2018340618969Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
05/30/2019321275669Open ↗
07/31/2017321275669Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
02/13/2018321275669Open ↗
01/12/2018321275669Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS2
01/27/2017321275669Open ↗
01/27/2017321275669Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/02/2018340618969Open ↗
07/16/2018340618969Open ↗
▸BISTECHNICAL REPORT: EXT. WALLS & APPURTS1
10/02/2019321275669Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
06/07/2019321275669Open ↗
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/26/2026B00903954-P8Open ↗
08/26/2026B00903954-P6Open ↗
08/13/2026B00903954-I1Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
01/17/2020301865417Open ↗
12/12/2019301865417Open ↗
06/27/2019321275669Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
10/24/2016321275669Open ↗
11/24/2015321275669Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
01/27/2017321275669Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
04/11/2024302216965Open ↗
04/11/2024302216956Open ↗
01/17/2020301865417Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/03/2023321275669Open ↗
▸Filing & Intake Forms22
▸BISADDITIONAL INFORMATION10
12/15/2021321275669Open ↗
06/10/2019321432213Open ↗
06/10/2019321432213Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM7
01/17/2020301865417Open ↗
12/12/2019301865417Open ↗
06/27/2019321275669Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET4
12/06/2017321693896Open ↗
11/24/2015321275669Open ↗
11/24/2015321275669Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/16/2018340618969Open ↗
▸Other Documents10
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
06/19/2019321275669Open ↗
06/07/2019321275669Open ↗
01/27/2017321275669Open ↗
▸BISPLOT DIAGRAM2
01/27/2017321275669Open ↗
11/24/2015321275669Open ↗
▸BIS2ND FLOOR NEED TO BE ADDED IN SCHEDULE-A OF ALT-11
08/02/2022321432213Open ↗
▸BISSTALL SHOWER NEED TO BE REMOVED FROM SCEDULE-B OD ALT-1 AT 1ST FLOOR1
08/02/2022321432213Open ↗
▸BISREMOVAL OF CURB CUT IS REQUIRED TO BE FILED AS PER ALT-11
08/02/2022321432213Open ↗
▸BISARA Supporting Document1
10/15/2019321275669Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026B00052473-I1Open ↗