← Back
BuildNYC
Building
182-41 MIDLAND PARKWAY
BIN 4155835
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic60p · 1 filing · 20 docs
Floor 2Plumbing work in cellar, first, second, and OSP70p · 2 filings · 20 docs
Floor 1Plumbing work in cellar, first, second, and OSP72p · 2 filings · 20 docs
CellarPlumbing work in cellar, first, second, and OSP70p · 2 filings · 20 docs
Site & exteriorFence barrier9p · 2 filings · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AA Building & Inspection Service803/27/2023
Ras PE Consulting Engineers311/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dmconsulting68601603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC Building Solutions CoGeneral Contractor1007/08/2026
Accrete Construction GroupGeneral Contractor303/21/2026
NYC Building Solutions CoScaffold207/08/2026
All Pro Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161003/27/2023
Building Lifecycle
All (73)Filed (11)Permit Issued (8)Signed Off (4)Inspection (6)Objection (14)Special Inspection (30)
06/21/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO IN HALF STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. TO DO INTERIOR RENOVATIONS AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q00623978-S1
06/21/2023
Signed off — Alteration
HEREWITH FILING FOR PLUMBING WORK IN CELLAR, FIRST, SECOND, AND OSP AS PER PLANS FILED.
Q00754954-I1
06/16/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/12/2023
Signed off — Alteration
Q00622718-I1
06/02/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/01/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/31/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/31/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
03/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/31/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
03/30/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
03/30/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
03/30/2023
Special inspection requirement — Lighting controls
FAHAD FATEH
03/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
03/30/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
03/30/2023
Special inspection requirement — Air barrier — testing
FAHAD FATEH
03/30/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
03/30/2023
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
03/30/2023
Special inspection requirement — Interior lighting power
FAHAD FATEH
03/30/2023
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
03/30/2023
Special inspection requirement — Masonry
FAHAD FATEH
03/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/30/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/30/2023
Special inspection requirement — Final
FAHAD FATEH
03/30/2023
Special inspection requirement — Permanent certificate
FAHAD FATEH
03/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
03/30/2023
Special inspection requirement — Shutoff dampers
FAHAD FATEH
03/30/2023
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
03/30/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
03/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
03/30/2023
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
03/30/2023
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
03/27/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO IN HALF STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. TO DO INTERIOR RENOVATIONS AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q00623978-P7
03/27/2023
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
03/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
03/27/2023
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
03/27/2023
Special inspection requirement — Final
FAHAD FATEH
03/26/2023
Filed — Alteration
HEREWITH FILING FOR PLUMBING WORK IN CELLAR, FIRST, SECOND, AND OSP AS PER PLANS FILED.
Q00754954-P1
01/04/2023
Permit issued — General Construction
Q00623978-I1-GC-CX
01/03/2023
Permit issued — Construction Fence
Q00622718-I1-FN
11/28/2022
Objection resolved — Addressed
11/24/2022
Objection raised — Other
11/17/2022
Signed off — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO IN HALF STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. TO DO INTERIOR RENOVATIONS AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q00623978-S3
11/14/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO IN HALF STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. TO DO INTERIOR RENOVATIONS AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q00623978-P6
09/22/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/14/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO IN HALF STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. TO DO INTERIOR RENOVATIONS AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q00623978-P5
07/13/2022
Permit issued — Plumbing
Q00754954-I1-PL
06/14/2022
Filed — Alteration
HEREWITH FILING FOR PLUMBING WORK IN CELLAR, FIRST, SECOND, AND OSP AS PER PLANS FILED.
Q00754954-I1
05/17/2022
Permit issued — Foundation
Q00623978-S1-GC-CX
04/06/2022
Permit issued — Support of Excavation
Q00623978-S3-SE
03/23/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO IN HALF STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. TO DO INTERIOR RENOVATIONS AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q00623978-P4
03/16/2022
Permit issued — Structural
Q00623978-S1-GC-CX
02/18/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO IN HALF STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. TO DO INTERIOR RENOVATIONS AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q00623978-P1
02/12/2022
Objection raised — Structural
02/12/2022
Objection resolved — Addressed
02/12/2022
Objection raised — Structural
02/12/2022
Objection resolved — Addressed
01/26/2022
Permit issued — General Construction
Q00623978-I1-GC-CX
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNYC Building Solutions Co01/04/2023
DOB NOWConstruction FenceSigned-offNYC Building Solutions Co01/03/2023
DOB NOWPlumbingSigned-offAll Pro Plumbing & Heating07/13/2022
DOB NOWFoundationSigned-offNYC Building Solutions Co05/17/2022
DOB NOWSupport of ExcavationSigned-offNYC Building Solutions Co04/06/2022
DOB NOWStructuralSigned-offAccrete Construction Group03/16/2022
DOB NOWGeneral ConstructionPermit IssuedNYC Building Solutions Co01/26/2022
DOB NOWConstruction FenceSigned-offNYC Building Solutions Co01/25/2022
1 project · most recent 03/27/2023
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/27/2023Permit IssuedNYC Building Solutions CoAir Conditioning Systems
Cooling
Mitsubishi Electric M4H36W06060615-B 400,000 BTU ×12
Heating
Mitsubishi Electric M4H36W06060615-B 400,000 BTU ×12
Ventilation
Mitsubishi Electric M4H36W06060615-B 400,000 BTU ×12
1 project · most recent 06/12/2023
General Wiring
FiledStatusContractorScope
06/12/2023CompleteK.A.B. ElectricGeneral Wiring
1 project · most recent 03/27/2023
Steel Masonry
FiledStatusContractorScope
03/27/2023Permit IssuedNYC Building Solutions CoSteel, Masonry
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/16/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/01/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/22/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/10/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 118
DateRequirementInspectorRole
03/31/2023Maintenance informationFAHAD FATEHenergy_progress
03/31/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
03/31/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/31/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
03/30/2023MasonryFAHAD FATEHspecial
03/30/2023Mechanical SystemsFAHAD FATEHspecial
03/30/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
03/30/2023FinalFAHAD FATEHprogress
03/30/2023Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/30/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
03/30/2023Permanent certificateFAHAD FATEHenergy_progress
03/30/2023Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
03/30/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
03/30/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
03/30/2023Shutoff dampersFAHAD FATEHenergy_progress
03/30/2023Air barrier - visual inspectionFAHAD FATEHenergy_progress
03/30/2023Air barrier — testing FAHAD FATEHenergy_progress
03/30/2023Maintenance informationFAHAD FATEHenergy_progress
03/30/2023Protection of exposed foundation insulationFAHAD FATEHenergy_progress
03/30/2023Insulation placement and R valuesFAHAD FATEHenergy_progress
03/30/2023Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
03/30/2023Interior lighting powerFAHAD FATEHenergy_progress
03/30/2023Lighting controlsFAHAD FATEHenergy_progress
03/30/2023Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
03/30/2023Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
Latest 25 of 118.
▾Documents — 118 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026Q00622718-I1Request digital key ↗
08/26/2026Q00754954-P1Request digital key ↗
08/26/2026Q00754954-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026Q00623978-P1Open ↗
08/13/2026Q00623978-P7Open ↗
08/13/2026Q00623978-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00623978-I1Open ↗
▸Seals & Professional Certifications45
▸DOB NOWSpecial Inspector Seal & Signature20
09/14/2026Q00623978-P6Open ↗
09/14/2026Q00623978-P6Open ↗
09/14/2026Q00623978-P6Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/14/2026Q00623978-P6Open ↗
09/01/2026Q00623978-P7Open ↗
09/01/2026Q00623978-P7Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/26/2026Q00754954-P1Open ↗
08/26/2026Q00754954-I1Open ↗
08/25/2026Q00623978-P7Open ↗
Showing 3 of 11 on file for this type
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)7
08/13/2026Q00623978-P5Open ↗
08/13/2026Q00623978-I1Open ↗
08/13/2026Q00623978-P4Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026Q00623978-S1Open ↗
08/13/2026Q00623978-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/26/2026Q00754954-P1Open ↗
08/26/2026Q00754954-I1Open ↗
08/25/2026Q00623978-P7Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/25/2026Q00623978-S1Open ↗
08/15/2026Q00623978-I1Open ↗
08/15/2026Q00623978-S3Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00754954-I1Open ↗
08/13/2026Q00623978-I1Open ↗
▸Inspections & Test Reports14
▸DOB NOWSOIL REPORT8
08/13/2026Q00623978-P5Open ↗
08/13/2026Q00623978-P1Open ↗
08/13/2026Q00623978-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026Q00623978-S1Open ↗
08/13/2026Q00623978-I1Open ↗
08/13/2026Q00623978-S3Open ↗
▸DOB NOWTR4 Plot Diagram3
08/13/2026Q00623978-I1Open ↗
08/13/2026Q00623978-S3Open ↗
08/13/2026Q00623978-S1Open ↗
▸Other Documents21
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/13/2026Q00623978-I1Open ↗
08/13/2026Q00623978-P7Open ↗
08/13/2026Q00623978-P5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification7
08/25/2026Q00623978-P7Open ↗
08/25/2026Q00623978-S1Open ↗
08/25/2026Q00623978-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSite Survey: Initial5
08/13/2026Q00623978-P7Open ↗
08/13/2026Q00623978-S1Open ↗
08/13/2026Q00623978-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q00623978-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00623978-S3Open ↗