← Back
Two stories - detached, small or mid-size
182-45 80 DRIVE
QUEENS · BIN 4155968
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R1-2Zoning
2,576 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,927 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Roof1p · 1 filing · 9 docs
Floor 23p · 1 filing · 9 docs
Floor 15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
V A N CONSTRUCTION403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS405/31/2023
RAS PE CONSULTING ENGINEERS202/22/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.403/21/2026
GERALD J CALIENDO R A P C403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
V.A.N. CONSTRUCTION CORPGeneral Contractor1007/08/2026
ALL PRO PLBG & HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519405/31/2023
Building Lifecycle
All (49)Filed (6)Permit Issued (6)Signed Off (3)Violation (9)Inspection (5)Objection (2)Special Inspection (18)
07/06/2023
Signed off — Alteration
HEREWITH FILING ALTERATION TYPE TWO IN CONJUNCTION WITH ALT-1 #421962200 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND FLOOR AS PER PLANS FILED HEREIN.
Q00439805-I1
06/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/09/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
06/09/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
06/05/2023
Objection resolved — Addressed
06/04/2023
Objection raised — Scope
05/31/2023
Filed — Alteration
HEREWITH FILING ALTERATION TYPE TWO IN CONJUNCTION WITH ALT-1 #421962200 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND FLOOR AS PER PLANS FILED HEREIN.
Q00439805-P2
05/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/31/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
05/31/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
05/11/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/20/2023
Filed — Alteration
HEREWITH FILING ALTERATION TYPE TWO IN CONJUNCTION WITH ALT-1 #421962200 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND FLOOR AS PER PLANS FILED HEREIN.
Q00439805-P1
03/20/2023
Permit issued — Plumbing
Q00439805-I1-PL
01/20/2023
Signed off — Alteration
HEREWITH FILING STRUCTURAL DRAWINGS FOR 2 STORY ALT-1 BUILDING
Q00373914-I1
01/17/2023
Signed off — Alteration
Q00354668-I1
08/19/2022
Permit issued — Structural
Q00373914-I1-ST
08/17/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/14/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/02/2022
Violation issued (ECB, closed)
Construction
02/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/01/2021
Permit issued — Construction Fence
Q00354668-I1-FN
11/16/2021
Permit issued — Plumbing
Q00439805-I1-PL
10/13/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/12/2021
Violation issued (ECB, closed)
Construction
10/06/2021
Violation issued (ECB, closed)
Construction
08/17/2021
Permit issued — Construction Fence
Q00354668-I1-FN
07/15/2021
Violation issued (ECB, closed)
Construction
07/13/2021
Filed — Alteration
HEREWITH FILING ALTERATION TYPE TWO IN CONJUNCTION WITH ALT-1 #421962200 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND FLOOR AS PER PLANS FILED HEREIN.
Q00439805-I1
04/30/2021
Permit issued — Construction Fence
Q00354668-I1-FN
02/22/2021
Filed — Alteration
HEREWITH FILING STRUCTURAL DRAWINGS FOR 2 STORY ALT-1 BUILDING
Q00373914-P1
02/22/2021
Special inspection requirement — Wood – Prefabricated I-Joists
Younes Abouyaala
02/22/2021
Special inspection requirement — Structural Steel - High Strength Bolting
Younes Abouyaala
02/22/2021
Special inspection requirement — Final
Younes Abouyaala
02/22/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
02/22/2021
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
02/22/2021
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
02/19/2021
Special inspection requirement — Structural Steel - Details
02/19/2021
Special inspection requirement — Concrete - Cast-In-Place
02/19/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/19/2021
Special inspection requirement — Structural Steel - High Strength Bolting
02/19/2021
Special inspection requirement — Wood – Prefabricated I-Joists
02/19/2021
Special inspection requirement — Final
08/19/2020
Filed — Alteration
HEREWITH FILING STRUCTURAL DRAWINGS FOR 2 STORY ALT-1 BUILDING
Q00373914-I1
06/04/2020
Filed — Alteration
Q00354668-I1
10/25/1999
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
10/25/1999
Violation issued (ECB, closed)
Zoning
10/25/1999
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC03/20/2023
DOB NOWStructuralPermit IssuedV.A.N. CONSTRUCTION CORP08/19/2022
DOB NOWConstruction FenceSigned-offV.A.N. CONSTRUCTION CORP12/01/2021
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC11/16/2021
DOB NOWConstruction FenceSigned-offV.A.N. CONSTRUCTION CORP08/17/2021
DOB NOWConstruction FenceSigned-offV.A.N. CONSTRUCTION CORP04/30/2021
BIS—ISSUEDV.A.N. CONSTRUCTION CORP08/01/2022
BIS—ISSUEDV.A.N. CONSTRUCTION CORP08/17/2021
BIS—ISSUEDV.A.N. CONSTRUCTION CORP08/17/2021
BISOTISSUEDREGIAN TECH CORP11/09/1999
1 project · most recent 07/07/2021
General Wiring
FiledStatusContractorScope
07/07/2021CompleteWCK ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/14/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/10/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
06/09/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
06/09/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
06/09/2023Maintenance informationYounes Abouyaalaenergy_progress
05/31/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
05/31/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
05/31/2023Maintenance informationYounes Abouyaalaenergy_progress
02/22/2021Wood – Prefabricated I-JoistsYounes Abouyaalaspecial
02/22/2021Structural Steel - High Strength BoltingYounes Abouyaalaspecial
02/22/2021FinalYounes Abouyaalaprogress
02/22/2021Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
02/22/2021Concrete - Cast-In-PlaceYounes Abouyaalaspecial
02/22/2021Structural Steel - DetailsYounes Abouyaalaspecial
02/19/2021Structural Steel - Details—special
02/19/2021Concrete - Cast-In-Place—special
02/19/2021Structural Stability – Alterations of existing buildings—special
02/19/2021Structural Steel - High Strength Bolting—special
02/19/2021Wood – Prefabricated I-Joists—special
02/19/2021Final—progress
▾Documents — 147 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Plumbing3
08/24/2026Q00439805-I1Request digital key ↗
08/24/2026Q00439805-P1Request digital key ↗
08/14/2026Q00439805-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/27/2026Q00373914-I1Request digital key ↗
08/15/2026Q00373914-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00354668-I1Request digital key ↗
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION11
06/21/2023421962200Open ↗
06/01/2023421766100Open ↗
03/03/2023421962200Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION2
07/29/2021421962200Open ↗
06/04/2021421962200Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/20/2023421962200Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
05/12/2021421962200Open ↗
▸BISTEMPORARY FENCE APPLICATION & PERMIT1
05/12/2021421962200Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
04/17/2023421962200Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/31/2023421962200Open ↗
▸BISZONING DIAGRAM1
02/04/2021421962200Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026Q00354668-I1Open ↗
08/13/2026Q00439805-I1Open ↗
08/13/2026Q00373914-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/24/2026Q00373914-I1Open ↗
08/24/2026Q00439805-P2Open ↗
08/24/2026Q00439805-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/24/2026Q00373914-I1Open ↗
08/24/2026Q00373914-I1Open ↗
08/24/2026Q00439805-P2Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment5
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
12/09/2022421962200Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/09/2022421962200Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
07/12/2023421962200Open ↗
▸BIS*SEWER CONNECTION: DEP SD1 & SD21
04/17/2023421962200Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
07/12/2023421962200Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREES SITE PLAN2
06/21/2023421766100Open ↗
07/29/2021421962200Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
12/09/2022421962200Open ↗
▸BISSTREET TREE CHECKLIST1
12/15/2020421962200Open ↗
▸BISSTREET TREE SIGNOFF1
06/21/2023421766100Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026Q00439805-I1Open ↗
08/13/2026Q00439805-P1Open ↗
08/13/2026Q00439805-P2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/12/2020421962200Open ↗
05/18/2020421962200Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
08/18/2022421962200Open ↗
03/15/2022421962200Open ↗
05/19/2021421962200Open ↗
Showing 3 of 6 on file for this type
▸BISFENESTRATION AIR LEAKAGE1
12/09/2022421962200Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
12/09/2022421962200Open ↗
▸BISINTERIOR LIGHTING POWER1
12/09/2022421962200Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/09/2022421962200Open ↗
▸BISFENESTRATION AREAS1
12/09/2022421962200Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/09/2022421962200Open ↗
▸BISLIGHTING IN DWELLING UNITS1
12/09/2022421962200Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/09/2022421962200Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/09/2022421962200Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00439805-I1Open ↗
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY5
08/18/2022421962200Open ↗
03/15/2022421962200Open ↗
05/21/2021421962200Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION3
05/18/2020421962200Open ↗
05/18/2020421962200Open ↗
05/18/2020421962200Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
12/09/2022421962200Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
04/17/2023421962200Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
05/12/2021421962200Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
12/09/2022421962200Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/09/2022421962200Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/09/2022421962200Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/09/2022421962200Open ↗
▸BISMASONRY1
12/09/2022421962200Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
12/09/2022421962200Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
12/09/2022421962200Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
12/09/2022421962200Open ↗
▸BISSOIL REPORT1
12/15/2020421962200Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
12/09/2022421962200Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
04/17/2023421962200Open ↗
▸Approvals, Objections & Sign-offs11
▸BISLETTERS - SUPPORTING DOCUMENTATION7
04/17/2023421962200Open ↗
01/25/2021421962200Open ↗
12/15/2020421962200Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
12/16/2020421962200Open ↗
12/14/2020421962200Open ↗
05/01/2020421962200Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/14/2023401033760Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
01/25/2021421962200Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/17/2023421962200Open ↗
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION8
06/15/2023421766100Open ↗
04/17/2023421962200Open ↗
04/17/2023421962200Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM5
07/29/2021421962200Open ↗
07/27/2020421962200Open ↗
07/27/2020421962200Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
07/27/2020421962200Open ↗
07/27/2020421962200Open ↗
06/02/2020421766100Open ↗
Showing 3 of 4 on file for this type
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION3
06/04/2020421766100Open ↗
06/02/2020421766100Open ↗
06/02/2020421766100Open ↗
▸BISSHUTOFF DAMPERS1
12/09/2022421962200Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
01/25/2021421962200Open ↗
▸BISMAINTENANCE INFORMATION1
12/09/2022421962200Open ↗
▸BISPERMANENT CERTIFICATE1
12/09/2022421962200Open ↗
▸BISDUCT DESIGN, INSULATION AND LEAKAGE TESTING1
12/09/2022421962200Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
12/09/2022421962200Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
12/09/2022421962200Open ↗