← Back
BuildNYC
Multi-story retail building (2+)
182 4TH AVENUE
BROOKLYN · BIN 3006806
💬 Discuss this project
1940Year Built
2Stories
K2Building Class
C4-4DZoning
6,769 sfGross Floor Area
1Units
0 Active Violations
Multi-story retail building (2+) · Owner of record: Fac Center Local Development · 3,850 sf lot · 1.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofDancewave, Fifth Ave CommitteeUnder Construction25p · 3 filings · 20 docs
Floor 2Fifth Ave Committee26p · 1 filing · 20 docs
Floor 1Dancewave, Fifth Ave Committee24p · 2 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed installation3p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fifth Ave Committee3510/13/2026
Fac HDFC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kems Engineering and Construction209/16/2026
Eskw/A306/24/2026
Synergic Design Architects106/24/2026
L. Naoum, P.E., P. C706/23/2026
Royal T&E106/12/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design 21471203/21/2026
Milrose Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Expert GroupenterpriseScaffold303/21/2026
Hod Piping & HeatingPlumbing207/08/2026
Norway ElectricElectrical203/21/2026
Nino General ContractingGeneral Contractor104/09/2026
Petri Plumbing & Heatingspecialty_contractor107/25/2026
Upright Fire ProtctnFire Protection106/28/2026
Accord PowerGeneral Contractor106/27/2026
Bakiu HVACspecialty_contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC Special Inspections8355209/16/2026
Metric Consulting and Ins1803706/24/2026
Synergic Design8561106/24/2026
Building Lifecycle
All (120)Filed (14)Permit Issued (8)Signed Off (2)Violation (10)Inspection (4)Objection (52)Special Inspection (30)
10/01/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/29/2026
Signed off — Alteration
REPLACE HEAT PUMP CONDENSER ON 1st FLOOR ROOF AND AIR HANDLER ON 1st FLOOR.
B01427247-I1
09/16/2026
Filed — Alteration
REPLACE HEAT PUMP CONDENSER ON 1st FLOOR ROOF AND AIR HANDLER ON 1st FLOOR.
B01427247-P1
08/17/2026
Special inspection requirement — Mechanical Systems
ABDALLAH ELCHERBINI
08/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
08/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
08/17/2026
Special inspection requirement — Maintenance information
Steven Bendoraitis
08/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
08/17/2026
Special inspection requirement — Final
Steven Bendoraitis
07/23/2026
Permit issued — Mechanical Systems
B01427247-I1-MS
07/16/2026
Filed — Alteration
REPLACE HEAT PUMP CONDENSER ON 1st FLOOR ROOF AND AIR HANDLER ON 1st FLOOR.
B01427247-I1
07/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
07/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
07/13/2026
Special inspection requirement — Maintenance information
Steven Bendoraitis
07/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
07/07/2026
Special inspection requirement — Final
Steven Bendoraitis
07/07/2026
Special inspection requirement — Mechanical Systems
ABDALLAH ELCHERBINI
07/06/2026
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Masonry
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
06/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
06/26/2026
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
06/25/2026
Permit issued — Solar
B01409427-I1-SL
06/24/2026
Filed — Alteration
Installation of 15.4 kw solar energy system on roof. No change of occupancy, use or egress.
B01409427-I1
06/24/2026
Filed — Alteration
INSTALLATION OF NEW MULTI-ZONE HEAT PUMP COOLING AND HEATING SYSTEM, DOAS, AND TOILET VENTILATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00903954-P8
06/23/2026
Filed — Alteration
INSTALLATION OF NEW MULTI-ZONE HEAT PUMP COOLING AND HEATING SYSTEM, DOAS, AND TOILET VENTILATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00903954-P6
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
04/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/23/2026
Permit issued — Mechanical Systems
B00903954-S1-MS
12/09/2025
Permit issued — Plumbing
B00903954-S2-PL
10/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/16/2025
Objection resolved — Addressed
10/15/2025
Permit issued — Sprinklers
B00903954-S3-EW-SP
10/15/2025
Objection raised — Plumbing
10/10/2025
Permit issued — Plumbing
B00903954-S2-PL
10/01/2025
Filed — Alteration
INSTALLATION OF NEW MULTI-ZONE HEAT PUMP COOLING AND HEATING SYSTEM, DOAS, AND TOILET VENTILATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00903954-P4
10/01/2025
Filed — Alteration
INSTALLATION OF NEW MULTI-ZONE HEAT PUMP COOLING AND HEATING SYSTEM, DOAS, AND TOILET VENTILATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00903954-P3
10/01/2025
Filed — Alteration
INSTALLATION OF NEW MULTI-ZONE HEAT PUMP COOLING AND HEATING SYSTEM, DOAS, AND TOILET VENTILATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00903954-P2
09/05/2025
Permit issued — Structural
B00903954-I1-GC
08/11/2025
Objection resolved — Addressed
07/18/2025
Objection raised — Admin
07/18/2025
Objection resolved — Addressed
07/05/2025
Violation issued (ECB, closed)
Construction
07/05/2025
Violation issued (ECB, closed)
Unknown
06/11/2025
Objection raised — Admin
06/03/2025
Filed — Alteration
INSTALLATION OF NEW MULTI-ZONE HEAT PUMP COOLING AND HEATING SYSTEM, DOAS, AND TOILET VENTILATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00903954-P1
11/16/2023
Objection resolved — Addressed
Latest 60 of 120 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPetri Plumbing & Heating07/23/2026
DOB NOWSolarPermit IssuedAccord Power06/25/2026
DOB NOWMechanical SystemsSigned-offBakiu HVAC02/23/2026
DOB NOWPlumbingSigned-offHod Piping & Heating12/09/2025
DOB NOWSprinklersSigned-offH.J. Flood10/15/2025
DOB NOWPlumbingSigned-offHod Piping & Heating10/10/2025
DOB NOWStructuralPermit IssuedNino General Contracting09/05/2025
DOB NOWSidewalk ShedSigned-offExpert Groupenterprise06/13/2018
BISSPISSUEDSirina Fire Protection01/22/2019
BIS—ISSUEDXBR10/01/2018
BISPLISSUEDLouis L.buttermark & Sons09/12/2018
BISOTISSUEDGlenwood Construction08/02/2018
BISSPISSUEDSirina Fire Protection12/05/2017
BIS—ISSUEDXBR09/22/2017
BISPLISSUEDLouis L.buttermark & Sons09/14/2017
BIS—ISSUEDXBR08/15/2017
BIS—ISSUEDPaul Signs09/12/2006
BIS—ISSUEDPaul Signs09/12/2006
BISEQISSUEDJabus Building12/02/2004
BISOTISSUEDJabus Building12/02/2004
BISEQISSUEDColgate Scaffolding07/17/2003
BISOTISSUEDRobinson Contracting07/10/2003
2 projects · most recent 09/16/2026
Air Conditioning Systems Heating Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/16/2026Signed-offPetri Plumbing & HeatingAir Conditioning Systems, Heating Systems
Cooling
Daikin HP-1 / RXYA120AATJA 119,000 BTU · Vrf Outdoor ×1
HP-1 / RXYA72AATJA 69,000 BTU · Vrf Outdoor ×1
Heating
Daikin HP-1 / RXYA120AATJA 135,000 BTU · Vrf Outdoor ×1
HP-1/ RXYA72AATJA 69,000 BTU · Vrf Outdoor ×1
06/24/2026Signed-offBakiu HVACHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MPE-0-W1-12-036-C3 44,200 BTU · Vrf Indoor ×2
PUHY-EP72TNU-A 72,000 BTU · Vrf Outdoor ×2
1 project · most recent 06/24/2026
FiledStatusContractorScope
06/24/2026Signed-offUpright Fire Protctn28 heads
1 project · most recent 06/24/2026
Water/Sanitary
FiledStatusContractorScope
06/24/2026Signed-offMercon PlumbingWater/Sanitary
3 projects · most recent 05/29/2026
General Wiring
FiledStatusContractorScope
05/29/2026Permit IssuedAccord Power Electric2 meters, 1 new_meters
10/18/2025Permit IssuedW 8 ElectricGeneral Wiring
06/12/2018CompleteMeo Electric—
1 project · most recent 06/24/2026
Steel
FiledStatusContractorScope
06/24/2026Signed-offBakiu HVACSteel
1 project · most recent 06/24/2026
FiledStatusContractorScope
06/24/2026Permit IssuedAccord Power35 panels, 15.4 kw, 3,767.71 roof_area_sqft
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/01/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
08/17/2026Energy Code Compliance InspectionsSteven Bendoraitisprogress
08/17/2026Mechanical SystemsABDALLAH ELCHERBINIspecial
08/17/2026Maintenance informationSteven Bendoraitisenergy_progress
08/17/2026HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
08/17/2026HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
08/17/2026HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
08/17/2026FinalSteven Bendoraitisprogress
07/13/2026HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
07/13/2026Energy Code Compliance InspectionsSteven Bendoraitisprogress
07/13/2026Maintenance informationSteven Bendoraitisenergy_progress
07/13/2026HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
07/13/2026HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
07/07/2026Mechanical SystemsABDALLAH ELCHERBINIspecial
07/07/2026FinalSteven Bendoraitisprogress
07/06/2026Structural Steel - DetailsSAMI HAJJAR P.Especial
07/06/2026Structural Steel - WeldingSAMI HAJJAR P.Especial
07/06/2026Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
07/06/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
07/06/2026FinalSAMI HAJJAR P.Eprogress
07/06/2026Lighting controlsSAMI HAJJAR P.Eenergy_progress
07/06/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
07/06/2026Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
07/06/2026Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
07/06/2026Interior lighting powerSAMI HAJJAR P.Eenergy_progress
07/06/2026Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
Latest 25 of 71.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
DancewaveArts / Culture / EntertainmentFloor 1, Roof
Project B01427247 Alteration · LOC Issued · 07/16/2026
Fifth Ave CommitteeOfficeFloors 1, 2, Roof
Project B00903954 Alteration · Permit Issued · 08/04/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 206 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/03/2026B00052473-I1Request digital key ↗
08/26/2026B00903954-S1Request digital key ↗
08/26/2026B00903954-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION12
04/25/2024321275669Open ↗
12/22/2022321693896Open ↗
12/15/2021321275669Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION10
01/23/2019321693896Open ↗
10/02/2018321275669Open ↗
09/13/2018321275669Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
11/13/2019321275669Open ↗
03/26/2019321275669Open ↗
12/11/2018321275669Open ↗
▸BISPLACE OF ASSEMBLY2
10/24/2016321432213Open ↗
08/18/2016321432213Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/09/2018321275669Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
01/09/2023321275669Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
01/03/2023321275669Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/12/2022321275669Open ↗
▸Seals & Professional Certifications65
▸DOB NOWProgress Inspector Seal & Signature23
10/14/2026B01427247-P1Open ↗
10/14/2026B01427247-P1Open ↗
10/14/2026B01427247-P1Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
01/17/2020301865417Open ↗
12/06/2019301865417Open ↗
10/02/2019321275669Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
10/14/2026B01427247-P1Open ↗
09/03/2026B00052473-I1Open ↗
08/26/2026B00903954-S1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
10/14/2026B01427247-P1Open ↗
09/25/2026B00903954-S3Open ↗
09/02/2026B00903954-S1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/16/2018340618969Open ↗
12/06/2017321693896Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/06/2017321693896Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/16/2018340618969Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/16/2018340618969Open ↗
▸Trade Schedules & Equipment9
▸BISEQUIPMENT USE PERMITS3
01/03/2022321275669Open ↗
01/03/2022321275669Open ↗
01/03/2022321275669Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/06/2017321693896Open ↗
11/24/2015321275669Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/03/2022321275669Open ↗
01/03/2022321275669Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
01/27/2017321275669Open ↗
▸BISSCHEDULE B - PLUMBING1
12/15/2021321275669Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
04/11/2019321275669Open ↗
01/27/2017321275669Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
07/31/2017321275669Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/26/2026B00903954-S3Open ↗
08/26/2026B00903954-S2Open ↗
08/26/2026B00903954-S1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
07/16/2018340618969Open ↗
12/06/2017321693896Open ↗
08/15/2017321275669Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
10/14/2026B01427247-P1Open ↗
08/16/2026B01427247-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
03/18/2019340618969Open ↗
07/31/2017321275669Open ↗
01/27/2017321275669Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/26/2018340618969Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
05/30/2019321275669Open ↗
07/31/2017321275669Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
02/13/2018321275669Open ↗
01/12/2018321275669Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS2
01/27/2017321275669Open ↗
01/27/2017321275669Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/02/2018340618969Open ↗
07/16/2018340618969Open ↗
▸BISTECHNICAL REPORT: EXT. WALLS & APPURTS1
10/02/2019321275669Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
06/07/2019321275669Open ↗
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/26/2026B00903954-P8Open ↗
08/26/2026B00903954-P6Open ↗
08/13/2026B00903954-S2Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
01/17/2020301865417Open ↗
12/12/2019301865417Open ↗
06/27/2019321275669Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
10/24/2016321275669Open ↗
11/24/2015321275669Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
01/27/2017321275669Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
04/11/2024302216965Open ↗
04/11/2024302216956Open ↗
01/17/2020301865417Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/03/2023321275669Open ↗
▸Filing & Intake Forms22
▸BISADDITIONAL INFORMATION10
12/15/2021321275669Open ↗
06/10/2019321432213Open ↗
06/10/2019321432213Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM7
01/17/2020301865417Open ↗
12/12/2019301865417Open ↗
06/27/2019321275669Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET4
12/06/2017321693896Open ↗
11/24/2015321275669Open ↗
11/24/2015321275669Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/16/2018340618969Open ↗
▸Other Documents10
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
06/19/2019321275669Open ↗
06/07/2019321275669Open ↗
01/27/2017321275669Open ↗
▸BISPLOT DIAGRAM2
01/27/2017321275669Open ↗
11/24/2015321275669Open ↗
▸BIS2ND FLOOR NEED TO BE ADDED IN SCHEDULE-A OF ALT-11
08/02/2022321432213Open ↗
▸BISSTALL SHOWER NEED TO BE REMOVED FROM SCEDULE-B OD ALT-1 AT 1ST FLOOR1
08/02/2022321432213Open ↗
▸BISREMOVAL OF CURB CUT IS REQUIRED TO BE FILED AS PER ALT-11
08/02/2022321432213Open ↗
▸BISARA Supporting Document1
10/15/2019321275669Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026B00052473-I1Open ↗