← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
182 9 AVENUE
MANHATTAN · BIN 1013279
💬 Discuss this project
1854Year Built
4Stories
RMBuilding Class
R7BZoning
6,233 sfGross Floor Area
4Units
Rent Stabilized29 Open Violations ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 1,480 sf lot · 4.21 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES903/22/2026
182 9TH AVE3203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP103/20/2021
ENTHINK ENGINEERS LLC103/17/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE ENTERPRISES INCGeneral Contractor603/21/2026
EUSEBIO MCQUEENElectrical103/21/2026
LELIS, ARILSONElectrical103/21/2026
NEU, RICHARDElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
SERGIO GIANNACHIElectrical103/21/2026
Building Lifecycle
All (42)Filed (2)Permit Issued (2)Signed Off (2)Violation (34)Special Inspection (2)
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
06/04/2025
Violation issued (HPD, open)
A
11/22/2024
Violation issued (HPD, open)
I
04/01/2024
Violation issued (HPD, open)
A
11/15/2023
Violation issued (HPD, open)
I
03/15/2023
Violation issued (HPD, open)
A
11/02/2022
Violation issued (HPD, open)
I
02/15/2022
Violation issued (HPD, open)
A
02/15/2022
Violation issued (HPD, open)
I
10/12/2021
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00487841-I1
09/29/2021
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00487829-I1
04/01/2021
Violation issued (HPD, open)
I
04/01/2021
Violation issued (HPD, open)
A
03/23/2021
Permit issued — Supported Scaffold
M00487841-I1-SF
03/20/2021
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00487841-I1
03/17/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00487829-I1
03/17/2021
Permit issued — Sidewalk Shed
M00487829-I1-SH
03/17/2021
Special inspection requirement — Final
Sunil Saigal
03/17/2021
Special inspection requirement — Final
Sunil Saigal
10/25/2019
Violation issued (HPD, open)
I
10/05/2018
Violation issued (HPD, open)
I
11/06/2017
Violation issued (HPD, open)
I
10/24/2016
Violation issued (HPD, open)
I
10/01/2015
Violation issued (HPD, open)
I
02/02/2015
Violation issued (HPD, open)
I
07/01/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/29/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/25/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/25/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/26/2000
Violation issued (HPD, open)
B
10/03/1999
Violation issued (HPD, open)
A
10/03/1999
Violation issued (HPD, open)
A
10/03/1999
Violation issued (HPD, open)
B
01/20/1982
Violation issued (HPD, closed)
A
04/09/1981
Violation issued (HPD, open)
A
04/09/1981
Violation issued (HPD, open)
B
04/09/1981
Violation issued (HPD, open)
C
04/09/1981
Violation issued (HPD, open)
A
04/09/1981
Violation issued (HPD, open)
B
04/09/1981
Violation issued (HPD, open)
B
04/09/1981
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC03/23/2021
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC03/17/2021
BISOTISSUEDROE DEVELOPMENT CORP12/12/2006
BISPLISSUEDJULIAN PLBG & HTG CORP10/26/2006
BISMHISSUEDROE DEVELOPMENT CORP03/14/2006
BISEQISSUEDROE DEVELOPMENT CORP11/18/2005
BISEQISSUEDOUTDOOR INSTALL03/23/2005
BISEQISSUEDOUTDOOR INSTALL03/23/2005
BIS—ISSUEDROE DEVELOPMENT CORPORATION03/22/2005
BISMHISSUEDROE DEVELOPMENT CORPORATION03/22/2005
BISOTISSUEDROE DEVELOPMENT CORPORATION03/22/2005
BISPLISSUEDPETER PLUMBING ASSOC. INC.08/02/2004
BISOTISSUEDSL GOLDMAN EQUITIES LLC05/17/2004
BISEQISSUEDSPRING SCAFFOLDING04/19/2004
2 projects · most recent 06/29/2024
General Wiring
FiledStatusContractorScope
06/29/2024CompleteRM ELECTRIC CO., INC.General Wiring
03/17/2021CompleteRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
03/17/2021FinalSunil Saigalprogress
03/17/2021FinalSunil Saigalprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/04/2026M00487829-I1Request digital key ↗
09/04/2026M00487841-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/04/2026M00487829-I1Open ↗
09/04/2026M00487841-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026M00487841-I1Open ↗
08/22/2026M00487829-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
09/04/2026M00487829-I1Open ↗
09/04/2026M00487841-I1Open ↗