← Back
Over six families without stores
182 AVENUE A
MANHATTAN · East Village · BIN 1083446
💬 Discuss this project
1920Year Built
4Stories
C1Building Class
R7AZoning
15,392 sfGross Floor Area
32Units
Rent Stabilized8 Open Violations ▸
Over six families without stores · Owner of record: ALLIED XXVI LLC · 4,918 sf lot · 3.13 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALLIED REALTY DEVELOPMENT707/08/2026
ALLIED REALTY1107/08/2026
XXVI LLC103/22/2026
182 AVE A ASSOCIATES203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/02/2019$11.5M—AVENUE A LLC → ALLIED XXVI LLC$747/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ATELIER NY ARCHITECTURE508/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ATELIER NEW YORK ARCHITECTURE503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BO7 CONSTRUCTION CORPGeneral Contractor407/08/2026
BRANDL ELECTRIC INC.Electrical103/22/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
LUVER PLBG & HTG INCPlumbing107/08/2026
SO PLUMBING & HEATING INCPlumbing107/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ATELIER NY ARCHITECTURE2438208/26/2021
GREYSTONE ENGINEERING CON2973108/26/2021
Building Lifecycle
All (43)Filed (5)Permit Issued (5)Signed Off (5)Violation (15)Inspection (3)Special Inspection (10)
10/09/2023
Violation issued (HPD, open)
C
10/09/2023
Violation issued (HPD, closed)
C
10/09/2023
Violation issued (HPD, closed)
B
10/09/2023
Violation issued (HPD, closed)
B
03/29/2023
Violation issued (HPD, closed)
A
03/08/2022
Violation issued (HPD, closed)
A
02/03/2022
Signed off — Alteration
INTERIOR RENOVATION TO COMBINE APARTMENTS 5 & 7 INTO DX1 & INSTALLATION OF NEW SKYLIGHT. PARTITION CHANGES TO NON-LOAD-BEARING WALLS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00562420-I1
12/17/2021
Signed off — Alteration
INTERIOR RENOVATION TO COMBINE APARTMENTS 5 & 7 INTO DX1. PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00573298-I1
11/14/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/07/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/04/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/17/2021
Permit issued — Plumbing
M00573298-I1-PL
09/15/2021
Permit issued — General Construction
M00562420-I1-GC-CX
08/26/2021
Filed — Alteration
INTERIOR RENOVATION TO COMBINE APARTMENTS 5 & 7 INTO DX1 & INSTALLATION OF NEW SKYLIGHT. PARTITION CHANGES TO NON-LOAD-BEARING WALLS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00562420-I1
08/26/2021
Filed — Alteration
INTERIOR RENOVATION TO COMBINE APARTMENTS 5 & 7 INTO DX1. PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00573298-I1
08/24/2021
Special inspection requirement — Lighting in dwelling units
Anatole Plotkin
08/24/2021
Special inspection requirement — Air barrier - visual inspection
Anatole Plotkin
08/24/2021
Special inspection requirement — Fenestration air leakage
Anatole Plotkin
08/24/2021
Special inspection requirement — Fenestration areas
Anatole Plotkin
08/24/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Anatole Plotkin
08/23/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
TIMOTHY TWEEDY
08/23/2021
Special inspection requirement — Structural Wood Frame
TIMOTHY TWEEDY
08/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anatole Plotkin
08/09/2021
Special inspection requirement — Energy Code Compliance Inspections
Anatole Plotkin
07/21/2021
Special inspection requirement — Final
Anatole Plotkin
04/16/2021
Violation issued (HPD, closed)
A
11/18/2020
Signed off — Alteration
M00198489-I1
11/13/2020
Signed off — Alteration
M00320874-I1
11/13/2020
Signed off — Alteration
M00198465-I1
09/24/2020
Violation issued (HPD, open)
B
09/24/2020
Violation issued (HPD, closed)
B
09/24/2020
Violation issued (HPD, closed)
B
03/06/2020
Permit issued — Plumbing
M00320874-I1-PL
02/27/2020
Filed — Alteration
M00320874-I1
01/25/2020
Violation issued (ECB, closed)
Construction
12/23/2019
Violation issued (ECB, closed)
Construction
12/23/2019
Violation issued (ECB, closed)
Construction
10/29/2019
Permit issued — Mechanical Systems
M00198489-I1-MS
10/24/2019
Filed — Alteration
M00198489-I1
08/19/2019
Permit issued — Plumbing
M00198465-I1-PL
08/07/2019
Filed — Alteration
M00198465-I1
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG09/17/2021
DOB NOWGeneral ConstructionSigned-offBO7 CONSTRUCTION CORP09/15/2021
DOB NOWPlumbingSigned-offLUVER PLBG & HTG INC03/06/2020
DOB NOWMechanical SystemsSigned-offBO7 CONSTRUCTION CORP10/29/2019
DOB NOWPlumbingSigned-offNICHOLAS SUIDA08/19/2019
BISOTISSUEDBO7 CONSTRUCTION CORP04/13/2020
BISOTISSUEDBO7 CONSTRUCTION CORP02/27/2020
BISOTISSUEDBO7 CONSTRUCTION CORP11/29/2019
BISOTISSUEDIKTINOS MAINTENANCE CORP06/13/2014
BISOTISSUEDBUILDING REPAIR & MAINT CORP10/15/2008
BISPLISSUEDGREGG NY PLUMBING, INC09/29/2008
BISOTISSUEDBUILDING REPAIR AND MAINTENANCE05/15/2008
4 projects · most recent 09/07/2025
General Wiring
FiledStatusContractorScope
09/07/2025Permit IssuedRIDGE ELECTRIC CORP.41 meters
03/12/2020Permit IssuedBRANDL ELECTRIC INC.General Wiring
11/06/2019Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
08/02/2019Permit IssuedL J ELEC'L SERV. INC.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/14/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/07/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/04/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
08/24/2021Lighting in dwelling unitsAnatole Plotkinenergy_progress
08/24/2021Air barrier - visual inspectionAnatole Plotkinenergy_progress
08/24/2021Fenestration air leakageAnatole Plotkinenergy_progress
08/24/2021Fenestration areasAnatole Plotkinenergy_progress
08/24/2021Fenestration and door U-factor and product ratingsAnatole Plotkinenergy_progress
08/23/2021Structural Stability – Alterations of existing buildingsTIMOTHY TWEEDYspecial
08/23/2021Structural Wood FrameTIMOTHY TWEEDYprogress
08/09/2021Fire-Resistant Penetrations and JointsAnatole Plotkinspecial
08/09/2021Energy Code Compliance InspectionsAnatole Plotkinprogress
07/21/2021FinalAnatole Plotkinprogress
▾Documents — 121 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch2
09/03/2026M00562420-I1Request digital key ↗
09/03/2026M00573298-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00198465-I1Request digital key ↗
09/05/2026M00320874-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00198489-I1Request digital key ↗
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION8
04/20/2020140888699Open ↗
02/26/2020140888699Open ↗
11/27/2019140879244Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
02/26/2020140888699Open ↗
11/27/2019140879244Open ↗
07/25/2019140861592Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications32
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
02/05/2020140879244Open ↗
02/05/2020140879244Open ↗
11/08/2019140861592Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/05/2026M00198465-I1Open ↗
09/05/2026M00198489-I1Open ↗
09/05/2026M00320874-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
02/26/2020140888699Open ↗
11/27/2019140879244Open ↗
07/25/2019140861592Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/27/2014122015372Open ↗
08/20/2008110319575Open ↗
05/08/2008110162500Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
02/26/2020140888699Open ↗
11/27/2019140879244Open ↗
07/25/2019140861592Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
02/26/2020140888699Open ↗
11/27/2019140879244Open ↗
07/25/2019140861592Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026M00562420-I1Open ↗
08/24/2026M00562420-I1Open ↗
08/24/2026M00562420-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/20/2008110319575Open ↗
05/08/2008110162500Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026M00562420-I1Open ↗
08/24/2026M00562420-I1Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING3
11/10/2008110319575Open ↗
08/20/2008110319575Open ↗
05/09/2008110162500Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
12/12/2008110319575Open ↗
▸Safety & Tenant Protection6
▸BISTENANT PROTECTION PLAN AND NOTES3
02/26/2020140888699Open ↗
11/27/2019140879244Open ↗
07/25/2019140861592Open ↗
▸DOB NOWTenant Protection Plan3
08/13/2026M00320874-I1Open ↗
08/13/2026M00198489-I1Open ↗
08/13/2026M00198465-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/05/2026M00198465-I1Open ↗
09/05/2026M00198489-I1Open ↗
09/05/2026M00320874-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
02/26/2020140888699Open ↗
11/27/2019140879244Open ↗
07/25/2019140861592Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
08/20/2008110319575Open ↗
05/08/2008110162500Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
06/27/2014122015372Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
02/05/2020140879244Open ↗
02/05/2020140879244Open ↗
11/08/2019140861592Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
09/14/2020140888699Open ↗
02/26/2020140888699Open ↗
11/27/2019140879244Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
02/26/2020140888699Open ↗
11/27/2019140879244Open ↗
07/25/2019140861592Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
09/14/2020140888699Open ↗
02/05/2020140879244Open ↗
11/08/2019140861592Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00562420-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/14/2020140888699Open ↗
02/26/2020140888699Open ↗
11/27/2019140879244Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
09/14/2020140888699Open ↗
02/05/2020140879244Open ↗
11/08/2019140861592Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
06/27/2014122015372Open ↗
08/20/2008110319575Open ↗
05/08/2008110162500Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT9
09/14/2020140888699Open ↗
02/26/2020140888699Open ↗
02/05/2020140879244Open ↗
Showing 3 of 9 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
02/26/2020140888699Open ↗
11/27/2019140879244Open ↗
07/25/2019140861592Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET3
06/27/2014122015372Open ↗
08/20/2008110319575Open ↗
05/08/2008110162500Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
02/26/2020140888699Open ↗
11/27/2019140879244Open ↗
07/25/2019140861592Open ↗
▸BISBOROUGH INTAKE FORM2
02/05/2020140879244Open ↗
11/08/2019140861592Open ↗
▸BISADDITIONAL INFORMATION1
09/06/2019140861592Open ↗
▸Other Documents1
▸DOB NOWDHCR Document1
08/13/2026M00198465-I1Open ↗