← Back
Two family converted from one family
182 DEAN STREET
BROOKLYN · BIN 3001321
💬 Discuss this project
1860Year Built
2Stories
B3Building Class
R6BZoning
2,740 sfGross Floor Area
2Units
Two family converted from one family · 2,000 sf lot · 1.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof2p · 1 filing · 15 docs
Floor 247p · 3 filings · 20 docs
Floor 142p · 2 filings · 20 docs
Cellar42p · 2 filings · 20 docs
Basement44p · 2 filings · 20 docs
1 job · most recent 06/16/2022
General Wiring
FiledStatusContractorScope
06/16/2022CompleteP & Z ELECTRIC CORPGeneral Wiring
Building Lifecycle
All (147)Filed (12)Permit Issued (12)Signed Off (4)Inspection (9)Objection (80)Special Inspection (30)
10/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/14/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
08/01/2024
Special inspection requirement — Interior lighting power
ALEKSANDR LEVIN
08/01/2024
Special inspection requirement — Air barrier - visual inspection
ALEKSANDR LEVIN
08/01/2024
Special inspection requirement — Fenestration air leakage
ALEKSANDR LEVIN
08/01/2024
Special inspection requirement — Maintenance information
ALEKSANDR LEVIN
08/01/2024
Special inspection requirement — Fenestration areas
ALEKSANDR LEVIN
08/01/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ALEKSANDR LEVIN
08/01/2024
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
08/01/2024
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
07/24/2024
Filed — Alteration CO
RECONFIGURATION OF EXISTING 2 FAMILY BUILDING INCLUDING MINOR PARTITION CHANGES, BATHROOM RENOVATION, & STAIR REPLACEMENT IN KIND. NEW WINDOWS AND EXTERIOR DOORS AT FRONT AND REAR FACADES. REPLACEMENT OF DECK AT REAR YARD. ALL WORK INDICATED ON PLANS
B00577560-P4
06/11/2024
Special inspection requirement — Interior lighting power
ALEKSANDR LEVIN
06/11/2024
Special inspection requirement — Air barrier - visual inspection
ALEKSANDR LEVIN
06/11/2024
Special inspection requirement — Fenestration areas
ALEKSANDR LEVIN
06/11/2024
Special inspection requirement — Fenestration air leakage
ALEKSANDR LEVIN
06/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
06/11/2024
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
06/11/2024
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
06/11/2024
Special inspection requirement — Maintenance information
ALEKSANDR LEVIN
06/11/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ALEKSANDR LEVIN
03/13/2024
Signed off — Alteration
Repair of existing lintels on 2F rear facade and garden level rear yard door.
B00554427-I1
03/13/2024
Permit issued — Structural
B00554427-I1-ST
02/22/2024
Signed off — Alteration
B00917091-I1
02/21/2024
Signed off — Alteration
INTERIOR ALTERATION OF EXISTING TWO-FAMILY BUILDING TO INCLUDE CAP & REMOVAL OF RADIATORS, REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGH-INS ON 1ST AND 2ND FLOOR, AND INSTALLATION OF PLUMBING FIXTURES ON NEW ROUGH-INS ON 2ND FLOOR.
B00583000-I1
02/21/2024
Signed off — Alteration
INSTALLATION OF NEW MECHANICAL HEATING AND COOLING PER PLAN, AS WELL AS NEW KITCHEN AND BATHROOM EXHAUST SYSTEMS. ALTERATION RELATED TO ARCHITECTURAL RENOVATION OF FIRST AND SECOND FLOOR APARTMENT.
B00577400-I1
01/19/2024
Special inspection requirement — Final
ALEKSANDR LEVIN
01/19/2024
Special inspection requirement — Mechanical Systems
ALEKSANDR LEVIN
01/19/2024
Special inspection requirement — Maintenance information
ALEKSANDR LEVIN
01/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALEKSANDR LEVIN
01/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALEKSANDR LEVIN
01/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEKSANDR LEVIN
01/16/2024
Objection resolved — Addressed
01/09/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/09/2024
Objection raised — Scope
01/03/2024
Filed — Alteration
INSTALLATION OF NEW MECHANICAL HEATING AND COOLING PER PLAN, AS WELL AS NEW KITCHEN AND BATHROOM EXHAUST SYSTEMS. ALTERATION RELATED TO ARCHITECTURAL RENOVATION OF FIRST AND SECOND FLOOR APARTMENT.
B00577400-P1
12/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
ALEKSANDR LEVIN
12/05/2023
Special inspection requirement — Final
ALEKSANDR LEVIN
12/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
ALEKSANDR LEVIN
12/05/2023
Special inspection requirement — Maintenance information
ALEKSANDR LEVIN
12/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEKSANDR LEVIN
12/05/2023
Special inspection requirement — Mechanical Systems
ALEKSANDR LEVIN
12/01/2023
Filed — Alteration CO
RECONFIGURATION OF EXISTING 2 FAMILY BUILDING INCLUDING MINOR PARTITION CHANGES, BATHROOM RENOVATION, & STAIR REPLACEMENT IN KIND. NEW WINDOWS AND EXTERIOR DOORS AT FRONT AND REAR FACADES. REPLACEMENT OF DECK AT REAR YARD. ALL WORK INDICATED ON PLANS
B00577560-P3
10/03/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/28/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/26/2023
Permit issued — Structural
B00917091-I1-ST
09/26/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/26/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/17/2023
Filed — Alteration
B00917091-I1
06/26/2023
Filed — Alteration
Repair of existing lintels on 2F rear facade and garden level rear yard door.
B00554427-P2
05/16/2023
Permit issued — Plumbing
B00583000-I1-PL
04/17/2023
Permit issued — General Construction
B00577560-I1-GC
04/17/2023
Permit issued — Mechanical Systems
B00577400-I1-MS
04/17/2023
Permit issued — Structural
B00554427-I1-ST
04/17/2023
Permit issued — Structural
B00554427-I1-ST
04/17/2023
Permit issued — Structural
B00554427-I1-ST
04/03/2023
Objection resolved — Addressed
03/13/2023
Objection resolved — Addressed
03/09/2023
Filed — Alteration
INTERIOR ALTERATION OF EXISTING TWO-FAMILY BUILDING TO INCLUDE CAP & REMOVAL OF RADIATORS, REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGH-INS ON 1ST AND 2ND FLOOR, AND INSTALLATION OF PLUMBING FIXTURES ON NEW ROUGH-INS ON 2ND FLOOR.
B00583000-P1
Latest 60 of 147 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CO ADAPTIVE ARCHITECTURE PLLC607/24/2024
ANZ CONSULTING ENGINEERING, PLLC201/03/2024
MURRAY ENGINEERING PC408/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CO ADAPTIVE ARCHITECTURE, PLLC2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLANE REMODELING COMPANYGeneral Contractor2207/08/2026
PIOTR MISAElectrical203/21/2026
RUTH C MANDLElectrical203/21/2026
P Z ELECTRIC CORP 004541General Contractor203/22/2026
ARCON PLBG SOLUTIONSPlumbing207/08/2026
RUTH MANDLElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTEGRITY CONSULTING SERV6661307/24/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offPLANE REMODELING COMPANY03/13/2024
DOB NOWStructuralSigned-offPLANE REMODELING COMPANY09/26/2023
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS05/16/2023
DOB NOWGeneral ConstructionPermit IssuedPLANE REMODELING COMPANY04/17/2023
DOB NOWMechanical SystemsSigned-offPLANE REMODELING COMPANY04/17/2023
DOB NOWStructuralSigned-offPLANE REMODELING COMPANY04/17/2023
DOB NOWStructuralSigned-offPLANE REMODELING COMPANY04/17/2023
DOB NOWStructuralSigned-offPLANE REMODELING COMPANY04/17/2023
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS05/20/2022
DOB NOWGeneral ConstructionPermit IssuedPLANE REMODELING COMPANY05/06/2022
DOB NOWMechanical SystemsSigned-offPLANE REMODELING COMPANY05/06/2022
DOB NOWStructuralSigned-offPLANE REMODELING COMPANY05/05/2022
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
10/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/14/2025Fail-Final CND-Occupancy InspectionFailView ↗
01/09/2024Fail-Final General Construction Non-Directive 14FailView ↗
10/03/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/28/2023Fail-Final CND-Occupancy InspectionFailView ↗
09/26/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/26/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
08/01/2024Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
08/01/2024Interior lighting powerALEKSANDR LEVINenergy_progress
08/01/2024Air barrier - visual inspectionALEKSANDR LEVINenergy_progress
08/01/2024Fenestration air leakageALEKSANDR LEVINenergy_progress
08/01/2024Maintenance informationALEKSANDR LEVINenergy_progress
08/01/2024Fenestration areasALEKSANDR LEVINenergy_progress
08/01/2024Fenestration and door U-factor and product ratingsALEKSANDR LEVINenergy_progress
08/01/2024Energy Code Compliance InspectionsALEKSANDR LEVINprogress
08/01/2024Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
06/11/2024Interior lighting powerALEKSANDR LEVINenergy_progress
06/11/2024Air barrier - visual inspectionALEKSANDR LEVINenergy_progress
06/11/2024Fenestration areasALEKSANDR LEVINenergy_progress
06/11/2024Fenestration air leakageALEKSANDR LEVINenergy_progress
06/11/2024Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
06/11/2024Energy Code Compliance InspectionsALEKSANDR LEVINprogress
06/11/2024Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
06/11/2024Maintenance informationALEKSANDR LEVINenergy_progress
06/11/2024Fenestration and door U-factor and product ratingsALEKSANDR LEVINenergy_progress
01/19/2024FinalALEKSANDR LEVINprogress
01/19/2024Mechanical SystemsALEKSANDR LEVINspecial
01/19/2024Maintenance informationALEKSANDR LEVINenergy_progress
01/19/2024HVAC-R and service water heating system controlsALEKSANDR LEVINenergy_progress
01/19/2024HVAC-R and service water heating equipmentALEKSANDR LEVINenergy_progress
01/19/2024HVAC-R and service water piping design and insulationALEKSANDR LEVINenergy_progress
12/05/2023HVAC-R and service water heating system controlsALEKSANDR LEVINenergy_progress
Latest 25 of 47.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/01/2026B00554427-P2Request digital key ↗
08/31/2026B00583000-P1Request digital key ↗
08/31/2026B00583000-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits16
▸DOB NOWLPC Approval/Permit12
09/01/2026B00554427-P2Open ↗
08/15/2026B00554427-I1Open ↗
08/15/2026B00577400-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
11/07/2024320916693Open ↗
08/27/2014320916693Open ↗
08/14/2014320916693Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications32
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/01/2026B00554427-I1Open ↗
09/01/2026B00554427-P2Open ↗
09/01/2026B00554427-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/03/2026B00554427-I1Open ↗
09/02/2026B00577560-P1Open ↗
09/02/2026B00577560-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/03/2026B00554427-I1Open ↗
09/03/2026B00554427-I1Open ↗
09/02/2026B00577560-P1Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
08/27/2014320916693Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist4
08/28/2026B00577560-P4Open ↗
08/28/2026B00577560-P3Open ↗
08/15/2026B00577560-P1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
08/27/2014320916693Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00577560-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00577560-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00577560-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/01/2026B00554427-P2Open ↗
08/31/2026B00583000-I1Open ↗
08/31/2026B00583000-P1Open ↗
Showing 3 of 12 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.3
08/15/2026B00577400-I1Open ↗
08/13/2026B00583000-I1Open ↗
08/13/2026B00577560-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/27/2014320916693Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/27/2014320916693Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
08/27/2014320916693Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/27/2014320916693Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
05/18/2016320916693Open ↗
▸BISEFILING COVER SHEET1
08/14/2014320916693Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification4
08/28/2026B00577560-P3Open ↗
08/28/2026B00577560-P4Open ↗
08/15/2026B00577560-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM1
08/27/2014320916693Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00577560-I1Open ↗