← Back
One family attached or semi-detached
182 MIDWOOD STREET
BROOKLYN · BIN 3115165
💬 Discuss this project
1910Year Built
2Stories
A5Building Class
R2Zoning
1,800 sfGross Floor Area
1Units
One family attached or semi-detached · 2,000 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VAI CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/13/2018$1.9M—— → —$1,042/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNION STREET STUDIO, LLC604/04/2024
JM CONSULTING ENGINEERS, LLC110/01/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOYD CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VAI CONSTRUCTION INCGeneral Contractor303/21/2026
GODFREY'S REFRIGERATIONGeneral Contractor203/21/2026
ADAM ELECL CONTRNG LLCElectrical103/22/2026
RITE WAY HEATING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL TESTING & CONSULT1688209/02/2022
ALL STATE PROPERTY INSPEC4288110/01/2020
Building Lifecycle
All (49)Filed (7)Permit Issued (3)Signed Off (3)Inspection (4)Objection (2)Special Inspection (30)
04/30/2024
Signed off — Alteration
Relocation of plumbing fixtures, water heater and boiler, new floor drains and plumbing fixtures.
B00675853-I1
04/08/2024
Special inspection requirement — Energy Code Compliance Inspections
Norman Cox
04/08/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Norman Cox
04/08/2024
Special inspection requirement — HVAC-R and service water heating system controls
Norman Cox
04/08/2024
Special inspection requirement — HVAC-R and service water heating equipment
Norman Cox
04/04/2024
Filed — Alteration
Relocation of plumbing fixtures, water heater and boiler, new floor drains and plumbing fixtures.
B00675853-P3
12/13/2023
Signed off — Alteration
Interior alterations including replace cellar floor slab; remove non-loadbearing partitions, new partitions and finishes. Excavation in rear yard to create exterior entry to basement, new opening in basement wall, new retaining walls, underpinning.
B00653303-I1
03/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/10/2023
Filed — Alteration
Relocation of plumbing fixtures, water heater and boiler, new floor drains and plumbing fixtures.
B00675853-P2
03/10/2023
Special inspection requirement — Energy Code Compliance Inspections
Norman Cox
03/10/2023
Special inspection requirement — HVAC-R and service water heating system controls
Norman Cox
03/10/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Norman Cox
03/10/2023
Special inspection requirement — HVAC-R and service water heating equipment
Norman Cox
03/07/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/22/2023
Filed — Alteration
Relocation of plumbing fixtures, water heater and boiler, new floor drains and plumbing fixtures.
B00675853-P1
12/21/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/25/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
09/14/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SEBASTIAN SETTEDUCATE JR., P.E
09/14/2022
Special inspection requirement — Concrete - Cast-In-Place
SEBASTIAN SETTEDUCATE JR., P.E
09/14/2022
Special inspection requirement — Underpinning
SEBASTIAN SETTEDUCATE JR., P.E
09/14/2022
Special inspection requirement — Subgrade Inspections
SEBASTIAN SETTEDUCATE JR., P.E
09/14/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
09/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
09/14/2022
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SEBASTIAN SETTEDUCATE JR., P.E
09/14/2022
Special inspection requirement — Final
ERIKA FRANKE
09/14/2022
Special inspection requirement — Energy Code Compliance Inspections
Norman Cox
09/14/2022
Special inspection requirement — Footing and Foundation
Norman Cox
09/14/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Norman Cox
09/14/2022
Special inspection requirement — Lighting in dwelling units
Norman Cox
09/14/2022
Special inspection requirement — Fenestration air leakage
Norman Cox
09/14/2022
Special inspection requirement — Air barrier - visual inspection
Norman Cox
09/08/2022
Objection raised — Other
09/08/2022
Objection resolved — Addressed
09/02/2022
Filed — Alteration
Interior alterations including replace cellar floor slab; remove non-loadbearing partitions, new partitions and finishes. Excavation in rear yard to create exterior entry to basement, new opening in basement wall, new retaining walls, underpinning.
B00653303-P1
09/01/2022
Special inspection requirement — Concrete - Cast-In-Place
SEBASTIAN SETTEDUCATE JR., P.E
09/01/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SEBASTIAN SETTEDUCATE JR., P.E
09/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
09/01/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
09/01/2022
Special inspection requirement — Subgrade Inspections
SEBASTIAN SETTEDUCATE JR., P.E
09/01/2022
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SEBASTIAN SETTEDUCATE JR., P.E
09/01/2022
Special inspection requirement — Underpinning
SEBASTIAN SETTEDUCATE JR., P.E
09/01/2022
Special inspection requirement — Energy Code Compliance Inspections
Norman Cox
08/10/2022
Permit issued — Plumbing
B00675853-I1-PL
08/05/2022
Permit issued — Foundation
B00653303-I1-GC-CX
02/19/2022
Filed — Alteration
Interior alterations including replace cellar floor slab; remove non-loadbearing partitions, new partitions and finishes. Excavation in rear yard to create exterior entry to basement, new opening in basement wall, new retaining walls, underpinning.
B00653303-I1
02/17/2022
Filed — Alteration
Relocation of plumbing fixtures, water heater and boiler, new floor drains and plumbing fixtures.
B00675853-I1
12/16/2020
Signed off — Alteration
B00393955-I1
10/16/2020
Permit issued — Mechanical Systems
B00393955-I1-MS
10/01/2020
Filed — Alteration
B00393955-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offLS PLUMBING CORP08/10/2022
DOB NOWFoundationSigned-offVAI CONSTRUCTION INC08/05/2022
DOB NOWMechanical SystemsSigned-offGODFREYS REFRIGERATION10/16/2020
BISOTISSUEDBROOKLYN SOLARWORKS LLC06/20/2019
BISOTISSUEDALL RENOVATION CONSTRUCT10/17/2011
BISOTISSUEDALL RENOVATION CONSTRUCT09/23/2011
BISPLISSUEDPLUMBING NYC INC11/24/2010
BISOTISSUEDALL RENOVATION CONSTRUCT11/04/2010
3 projects · most recent 04/14/2023
General Wiring
FiledStatusContractorScope
04/14/2023CompleteADAM ELECL CONTRNG LLCGeneral Wiring
02/12/2020Pending PaymentTHROOP ELECTRIC CO., INC.1 meters, 1 new_meters
07/12/2019CompleteBROOKYLN SOLARWORKS, LLC—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/25/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
04/08/2024Energy Code Compliance InspectionsNorman Coxprogress
04/08/2024HVAC-R and service water piping design and insulationNorman Coxenergy_progress
04/08/2024HVAC-R and service water heating system controlsNorman Coxenergy_progress
04/08/2024HVAC-R and service water heating equipmentNorman Coxenergy_progress
03/10/2023Energy Code Compliance InspectionsNorman Coxprogress
03/10/2023HVAC-R and service water heating system controlsNorman Coxenergy_progress
03/10/2023HVAC-R and service water piping design and insulationNorman Coxenergy_progress
03/10/2023HVAC-R and service water heating equipmentNorman Coxenergy_progress
09/14/2022Excavations - Sheeting, Shoring, and BracingSEBASTIAN SETTEDUCATE JR., P.Especial
09/14/2022Concrete - Cast-In-PlaceSEBASTIAN SETTEDUCATE JR., P.Especial
09/14/2022UnderpinningSEBASTIAN SETTEDUCATE JR., P.Especial
09/14/2022Subgrade InspectionsSEBASTIAN SETTEDUCATE JR., P.Especial
09/14/2022Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
09/14/2022Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
09/14/2022Subsurface Conditions – Fill Placement & In-Place DensitySEBASTIAN SETTEDUCATE JR., P.Especial
09/14/2022FinalERIKA FRANKEprogress
09/14/2022Energy Code Compliance InspectionsNorman Coxprogress
09/14/2022Footing and FoundationNorman Coxprogress
09/14/2022Fenestration and door U-factor and product ratingsNorman Coxenergy_progress
09/14/2022Lighting in dwelling unitsNorman Coxenergy_progress
09/14/2022Fenestration air leakageNorman Coxenergy_progress
09/14/2022Air barrier - visual inspectionNorman Coxenergy_progress
09/01/2022Concrete - Cast-In-PlaceSEBASTIAN SETTEDUCATE JR., P.Especial
09/01/2022Excavations - Sheeting, Shoring, and BracingSEBASTIAN SETTEDUCATE JR., P.Especial
09/01/2022Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
Latest 25 of 36.
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/31/2026B00675853-I1Request digital key ↗
08/31/2026B00675853-P2Request digital key ↗
08/31/2026B00675853-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00393955-I1Request digital key ↗
▸Applications & Permits16
▸DOB NOWLPC Approval/Permit7
08/31/2026B00675853-P2Open ↗
08/31/2026B00675853-I1Open ↗
08/31/2026B00675853-P3Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION5
06/20/2019340683264Open ↗
10/18/2011320230166Open ↗
10/05/2011320230166Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
06/19/2019340683264Open ↗
05/29/2012320230166Open ↗
03/27/2012320230166Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature9
09/12/2026B00653303-I1Open ↗
09/12/2026B00653303-I1Open ↗
09/12/2026B00653303-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/31/2026B00675853-I1Open ↗
08/31/2026B00675853-P3Open ↗
08/31/2026B00675853-P2Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/08/2012320230166Open ↗
11/05/2010320230166Open ↗
10/21/2010320230166Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/12/2026B00653303-I1Open ↗
09/01/2026B00653303-P1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/19/2019340683264Open ↗
▸Trade Schedules & Equipment8
▸BISSELF-CERT PLUMBING NOTICE7
10/08/2011320230166Open ↗
10/08/2011320230166Open ↗
09/30/2011320230166Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING1
10/21/2010320230166Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
06/19/2019340683264Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00393955-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/31/2026B00675853-I1Open ↗
08/31/2026B00675853-P3Open ↗
08/31/2026B00675853-P2Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/21/2010320230166Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/19/2019340683264Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/24/2019340683264Open ↗
06/19/2019340683264Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/31/2026B00675853-I1Open ↗
08/13/2026B00653303-I1Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
06/19/2019340683264Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/24/2019340683264Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
09/24/2019340683264Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/24/2019340683264Open ↗
06/19/2019340683264Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/24/2019340683264Open ↗
06/25/2012320230166Open ↗
▸BISLANDMARKS APPROVAL2
06/19/2019340683264Open ↗
10/21/2010320230166Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/21/2010320230166Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
09/24/2019340683264Open ↗
▸BISLANDMARKS SIGNOFF1
09/24/2019340683264Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
09/24/2019340683264Open ↗
06/19/2019340683264Open ↗
07/17/2012320230166Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
10/21/2010320230166Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/19/2019340683264Open ↗
▸Other Documents2
▸BISLAA - Supporting Documentation1
06/19/2019340683264Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00653303-I1Open ↗