← Back
Two family brick
182 SULLIVAN STREET
MANHATTAN · BIN 1008327
💬 Discuss this project
1850Year Built
3Stories
B1Building Class
R7-2Zoning
4,148 sfGross Floor Area
2Units
Two family brick · Owner of record: SULLIVAN BLUE PROPERTY LLC · 2,252 sf lot · 1.84 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Penthouse2p · 1 filing · 4 docs
Floor 32p · 1 filing · 4 docs
Floor 24p · 3 filings · 20 docs
Floor 14p · 2 filings · 19 docs
Cellar5p · 3 filings · 20 docs
Basement4p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/03/2024$7.6M—Private party → Private party$1,832/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RJD ENGINEERING LLC404/14/2026
STRATFORD ENGINEERING201/09/2026
TRIMBLE ARCHITECTURE PC108/11/2025
CES ENGINEERING LLC307/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EFG CONSULTING1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VOLK INDUSTRIAL SERVICESGeneral Contractor104/09/2026
ARCON PLBG SOLUTIONSPlumbing107/08/2026
VILLAGE P & H NY INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STRATFORD ENGINEERING997201/09/2026
INTEGRITY CONSULTING SERV666307/30/2025
Building Lifecycle
All (49)Filed (10)Permit Issued (3)Signed Off (3)Inspection (10)Objection (2)Special Inspection (21)
09/16/2026
Signed off — Alteration
Install new floor drains and sump pump. Replace existing Hot water heaters. No change in use, egress or occupancy.
M01246563-I1
04/30/2026
Signed off — Alteration
Replace and install new gas fixtures and gas piping. Replace and install new gas meter. No change in use, egress or occupancy.
M01088468-I1
04/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/14/2026
Filed — Alteration
Install new floor drains and sump pump. Replace existing Hot water heaters. No change in use, egress or occupancy.
M01246563-P3
04/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/05/2026
Filed — Alteration
Install new floor drains and sump pump. Replace existing Hot water heaters. No change in use, egress or occupancy.
M01246563-P2
02/23/2026
Filed — Alteration
Install new floor drains and sump pump. Replace existing Hot water heaters. No change in use, egress or occupancy.
M01246563-P1
02/02/2026
Signed off — Alteration
New Slab on Grade and new footings and columns in cellar. New framing in basement. No change in use, egress or occupancy.
M01230433-I1
01/12/2026
Special inspection requirement — Final
Xianzhang Chen
01/12/2026
Special inspection requirement — Subgrade Inspections
Xianzhang Chen
01/12/2026
Special inspection requirement — Structural Steel - Details
Xianzhang Chen
01/12/2026
Special inspection requirement — Concrete - Cast-In-Place
Xianzhang Chen
01/12/2026
Special inspection requirement — Post-installed Anchors
Xianzhang Chen
01/12/2026
Special inspection requirement — Structural Steel - Welding
Xianzhang Chen
01/12/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Xianzhang Chen
01/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Xianzhang Chen
01/12/2026
Special inspection requirement — Footing and Foundation
Xianzhang Chen
01/09/2026
Filed — Alteration
New Slab on Grade and new footings and columns in cellar. New framing in basement. No change in use, egress or occupancy.
M01230433-P1
01/09/2026
Special inspection requirement — Concrete - Cast-In-Place
Xianzhang Chen
01/09/2026
Special inspection requirement — Post-installed Anchors
Xianzhang Chen
01/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Xianzhang Chen
01/09/2026
Special inspection requirement — Structural Steel - Details
Xianzhang Chen
01/09/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Xianzhang Chen
01/09/2026
Special inspection requirement — Structural Steel - Welding
Xianzhang Chen
01/09/2026
Special inspection requirement — Subgrade Inspections
Xianzhang Chen
01/09/2026
Special inspection requirement — Final
Xianzhang Chen
01/09/2026
Special inspection requirement — Footing and Foundation
Xianzhang Chen
11/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/19/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/11/2025
Filed — Alteration
Enlarge existing rear window openings. No change in use, egress or occupancy.
M01265936-I1
08/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
08/04/2025
Special inspection requirement — Final
James Trimble
07/30/2025
Filed — Alteration
Replace and install new gas fixtures and gas piping. Replace and install new gas meter. No change in use, egress or occupancy.
M01088468-P2
07/11/2025
Permit issued — Plumbing
M01246563-I1-PL
07/10/2025
Permit issued — General Construction
M01230433-I1-GC-CX
07/08/2025
Filed — Alteration
Install new floor drains and sump pump. Replace existing Hot water heaters. No change in use, egress or occupancy.
M01246563-I1
06/25/2025
Filed — Alteration
New Slab on Grade and new footings and columns in cellar. New framing in basement. No change in use, egress or occupancy.
M01230433-I1
02/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
01/09/2025
Objection resolved — Addressed
12/30/2024
Objection raised — Other
12/18/2024
Filed — Alteration
Replace and install new gas fixtures and gas piping. Replace and install new gas meter. No change in use, egress or occupancy.
M01088468-P1
11/22/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/03/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/30/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/16/2024
Permit issued — Plumbing
M01088468-I1-PL
08/07/2024
Filed — Alteration
Replace and install new gas fixtures and gas piping. Replace and install new gas meter. No change in use, egress or occupancy.
M01088468-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS07/11/2025
DOB NOWGeneral ConstructionSigned-offVOLK INDUSTRIAL SERVICES07/10/2025
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC08/16/2024
2 projects · most recent 04/14/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/14/2026Signed-offARCON PLBG SOLUTIONSGas, Water/Sanitary
07/30/2025Signed-offVILLAGE P & H NY INCGas
1 project · most recent 05/28/2024
FiledStatusContractorScope
05/28/2024Permit IssuedUNITED ELEC'L CONT'G CORP2 meters, 2 new_meters
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/19/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/22/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/03/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/30/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
01/12/2026FinalXianzhang Chenprogress
01/12/2026Subgrade InspectionsXianzhang Chenspecial
01/12/2026Structural Steel - DetailsXianzhang Chenspecial
01/12/2026Concrete - Cast-In-PlaceXianzhang Chenspecial
01/12/2026Post-installed AnchorsXianzhang Chenspecial
01/12/2026Structural Steel - WeldingXianzhang Chenspecial
01/12/2026Structural Steel - High Strength BoltingXianzhang Chenspecial
01/12/2026Structural Stability – Alterations of existing buildingsXianzhang Chenspecial
01/12/2026Footing and FoundationXianzhang Chenprogress
01/09/2026Concrete - Cast-In-PlaceXianzhang Chenspecial
01/09/2026Post-installed AnchorsXianzhang Chenspecial
01/09/2026Structural Stability – Alterations of existing buildingsXianzhang Chenspecial
01/09/2026Structural Steel - DetailsXianzhang Chenspecial
01/09/2026Structural Steel - High Strength BoltingXianzhang Chenspecial
01/09/2026Structural Steel - WeldingXianzhang Chenspecial
01/09/2026Subgrade InspectionsXianzhang Chenspecial
01/09/2026FinalXianzhang Chenprogress
01/09/2026Footing and FoundationXianzhang Chenprogress
08/08/2025Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
08/04/2025FinalJames Trimbleprogress
02/19/2025Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026M01088468-P1Request digital key ↗
08/25/2026M01088468-P2Request digital key ↗
08/25/2026M01088468-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit9
08/13/2026M01088468-P1Open ↗
08/13/2026M01246563-I1Open ↗
08/13/2026M01246563-P3Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/20/2026M01230433-P1Open ↗
08/20/2026M01230433-I1Open ↗
08/17/2026M01246563-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/27/2026M01088468-P2Open ↗
08/28/2026M01088468-I1Open ↗
08/23/2026M01230433-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026M01230433-I1Open ↗
08/23/2026M01230433-P1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/20/2026M01230433-I1Open ↗
08/20/2026M01230433-P1Open ↗
08/17/2026M01246563-P3Open ↗
Showing 3 of 9 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026M01230433-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWLandmark Approval1
08/13/2026M01265936-I1Open ↗